Information
-
Document No.
-
Date and Time of Inspection
-
Specify works type
- Day works - Programmed Maintenance
- Night works - Programmed Maintenance
- Day works - Other Maintenance/Repair
- Night works - Other Maintenance/Repair
- Day works - Piezo/Loop Repair or replacement
- Night works - Piezo/Loop Repair or replacement
- Day Works New Install
- Night Works New Install
- System Calibration
- Investigate flash operation
- CCU Upgrade or Reinstall
- SDCM Hot Swap
-
Client Name
-
Prepared by
-
Site Number
-
GPS Location (Please allow - Automatic)
-
RTS Personnel on site
-
Are there Sub-contractor/other personnel on site
-
Name, role and employing company of sub-contractor/other personnel on site.
PRE-START
-
Was a pre-start briefing conducted, the attendance register completed and signed by all personnel on site (n/a if lone worker)
-
Is there evidence that site visitors/contractors have been inducted onto the site?
-
Were relevant permits and approvals obtained prior to works commencing (e.g. client approval, Penlink/City Link) - Take Photo
-
Was SMWS correctly reviewed and signed off before works commenced?
-
Tap to Add Photos
SAFE WORK METHOD STATEMENTS
-
Was the correct SWMS used , reviewed and signed off by relevant personnel (including sub-contractors working under a Redflex SMWS) prior to works commencing?
-
Have appropriate control methods been listed on the SWMS and implemented?
-
Has appropriate plant been listed for the works?
-
Has appropriate warning signage (outside of any TMP) been listed for the works?
-
Has appropriate PPE been listed for the works?
-
Are works equipment been placed in a safe location on site from public, traffic, drip lines of trees and to avoid environmental damage (e.g. vehicles parked on or over flora)?
-
Have works vehicles/plant and equipment been parked/placed in a safe location taking onto account safe access, the TMP/traffic and pedestrians?
-
Tap to add comments
-
Tap to Add Photos
SUB-CONTRACTORS
-
Are any sub-contractor companies on site and under RTS control, on the RTS approved contractor list?
-
Are all sub-contractor employees on site and under RTS control suitably qualified for the tasks they are performing.
-
Have all sub-contractor employees on site and under RTS control completed the RTS Redflex safety induction (and if required PenLink/City Link or other required third party inductions) and been approved to work on RTS sites?
-
Where required (e.g. earthworks, loop/cable installation) sub-contractors have developed and implemented a SWMS that is reviewed and signed off by relevant personnel prior to works commencing?
-
Tap to add comments
-
Tap to Add Photos
TRAFFIC MANAGEMENT
-
Is any required traffic management in place ?
-
Is the implemented TMP Plan the correct one for the location, works and and time?
-
Does TMP adequately manage pedestrians access?
-
Are personnel implementing the TMP suitably qualified?
-
Tap to add comments
-
Tap to Add Photos
ENVIRONMENTAL
-
All waste/rubbish generated by work taken from site at completion and appropriately disposed of?
-
Were any environmental issues and controls identified and implemented before works commenced?
-
Are catch pit/drain protection measures in place?
-
Are silt control measures in place (if required)?
-
Are controls in place to manage flooding during the works (if required)?
-
Have control measures been put in place to prevent discharge or run off from works entering storm water drains/catch pits or fresh water or marine areas?
-
Where the site is empty or idle, has the site been secured against environmental discharges (e.g. has exposed ground been stabilised)?
-
Tap to add comments
-
Tap to Add Photos
PPE
-
Is the correct PPE and safety equipment being used/worn in accordance with SWMS/Safety Data Sheet Requirements by all personnel?
-
Is PPE worn/fitted correctly and are personnel able to demonstrate correct fitting/use?
-
Is PPE in good, clean, serviceable condition and in date (if applicable/e.g. Hard Hats, respirator filters)?
-
Tap to add comments/feedback
-
Tap to Add Photos
EMERGENCY EQUIPMENT AND AMENITIES
-
First aid kit is available on site?
-
First aid kit is fully stocked and no with expired items?
-
First aid training is up to date?
-
First Aider is known?
-
Fire extinguisher(s) is available, easily accessible, not being used to hang items and location known to personnel?
-
Fire extinguisher is in serviceable condition with test current label?
-
Tap to add comments/feedback
-
Tap to Add Photos
PANDEMIC/EPIDEMIC COMPLIANCE - APPLIES TO ALL VMS AND SUBCONTRACTOR EMPLOYEES ON SITE
-
Are sufficient supplies of PPE for pandemic/epidemic (hand wash/masks/gloves etc) issued/available to staff on site
-
Staff on site are healthy and do not complain of or exhibit COVID-19 or cold/flu like symptoms such as: fever sore throat cough tiredness difficulty breathing.
-
Staff and are aware of requirement NOT to attend work if unwell (e.g. cough/runny nose), to advise their manger and not to attend work until wee/symptom free?