Title Page
-
Conducted on
-
Prepared by
-
Position Title
-
Location
General Details
-
Site Inspection Report No:
-
Roads in Poor Condition Register Reference No:
-
Skid Resistance Inspection Reference No:
SECTION 1 - SITE DETAILS - Location
1.1 Location
-
Road Name:
-
Road No.
-
Map Ref:
-
LGA:
-
Direction:
-
Kilometre Post / SRRS Start:
-
Kilometre Post / SRRS End:
-
Site Length (m):
-
Site Width (m):
-
Total Area (m2):
-
Local Description:
-
Road Maintenance Category:
-
Current Hazard Inspection Regime:
-
Is this response from an ETS?
-
ETS Reference No/s (If Yes above):
-
Description of Defect / Condition:
-
Suggested Treatment Category
-
Photos Taken:
-
Photo References:
SECTION 1 - SITE DETAILS - Signage
1.2 Signage
1.2.1 Signage - Existing Signage on site
-
Posted Speed Limit:
- 40 kph
- 50 kph
- 60 kph
- 70 kph
- 80 kph
- 90 kph
- 100 kph
- 110 kph
-
Existing Warning Signs:
- Curves / Alignment
- Intersections
- Advanced Warning of Traffic Control Devices
- Road width
- Low Clearance
- Narrow Clearance
- Road Obstacles
- Pedestrian
- Bicycle
- School
-
Other Comments:
1.2.2 Signage - Temporary Signs Installed
-
Are Temporary Warning Signs Installed:
-
If Yes, are the Temporary Warning Signs:
-
Type of Temporary Signs Installed:
-
Other Temporary Warning Signs Installed:
-
Are Temporary Speed Limit Signs Installed:
-
If Yes, are the Temporary Speed Limit Signs:
-
If Yes, are the Temporary Speed Limit Signs:
-
Temporary Speed Limit Installed:
- 40 kph
- 50 kph
- 60 kph
- 70 kph
- 80 kph
- 90 kph
- 100 kph
- 110 kph
-
Date Signs Installed:
-
MoA Reference No (If applicable):
-
MoA Expiry Date (If applicable):
-
Asset Vision No with photos of signs installed:
-
Advise Victoria Police on speed changes:
-
Other Comments:
-
Has the VicRoads Guideline for Signing Roads in Poor Condition been used for signing the site?
-
Site Sketch Plan attached (Appendix 1)
SECTION 1 - SITE DETAILS - Maintenance History
-
Number of times the Contractor has repaired the site
-
How frequently the site requires maintenance treatments to repair defects (Common defect types and treatment applied and frequency)
-
Any other comments
SECTION 1 - ACTIONS
-
Is it required to install Fixed Speed Reduction/Advisory Speed signs?
-
If yes, forward to Movement and Safety to complete Section 2 (Date forwarded)
-
If No, forward to Roads Development team to complete Section 3