Title Page

  • Conducted on

  • Prepared by

  • Location

If there are any major health and safety issues on site that you identify during your inspection please contact the site manager immediately. Do not leave site until you are satisfied that the issue has been made safe.

Project:

  • Vilicom Job Code:

  • Sub – Contractor:

CORONA VIRUS CONTROLS

  • Does the RAMS contain detials on minimising the risk from Covid-19?

Site Security

  • Are all working areas restricted from public access?

Site Documentation:

  • Relevant and latest risk assessment and method statement (RAMS) available on request?

  • HASWA notice displayed?

  • Emergency arrangements, fire and spills, etc? displayed

  • Safety alerts/toolbox talks? (displayed / recorded)

  • Site briefings taking place and recorded?

  • Relevant staff competency certificates? (sample as per RAMS)

  • Policies in date, signed, displayed? (H&S, Environmental)

First Aid Arrangements

  • First aider known?

  • First aider has certification?

  • First aid kit available?

  • First aid kit full?

  • Is a first aid process in place? Look in the first aid boxes.

Fire Arrangements:

  • Appropriate extinguishers available?

  • Full and within service date? (1 year)

  • Fire warden appointed?

  • Visitors book in use?

  • Fire exits displayed?

  • Are fire exits clearly marked / unobstructed?

  • Site access / egress: Known to all staff?

  • site access / egress: Unobstructed?

  • No smoking onsite (observe)?

Safety Culture:

  • All operatives and staff can demonstrate appropriate knowledge and attitude when questioned?

  • Are staff aware of their H&S responsibilities (ask a few of them)?

  • Observed Working to site rules?

  • Permits in place when required?

  • Inspections up to date and current certification present?

  • All competence and ID cards viewed?

  • All applicable ID/induction competence cards on persons?

  • Appropriate PPE?

  • Emergency arrangements known?

  • Emergency equipment available? (Escape BA, tripod/winch, harness)

  • Trained personnel?

Plant and Equipment:

  • Inspection certs present and up to date? (sample equipment on site)

  • Pre-use checks being completed by operators? (sample equipment on site)

  • Used for appropriate work activities?

  • Operators trained and competent to use? (Refer to RAMS)

  • Correct PPE worn as per RAMS?

  • PPE Clean?

  • PPE Fit for purpose?

  • Equipment In calibration? (RF monitors)

  • If No - stop the job.

  • Operatives trained in use of equipment?

  • Hand tools In good order? (no damage)

  • Hand tools Correctly used?

Power Tools/Plant & Equipment:

  • 110v only for portable electrical plant on site?

  • PAT tested?

  • Well maintained?

  • Operators authorised and certified?

Lifting Equipment/Accessories:

  • Certification available or marked? (6 monthly)

  • In good working order?

Welfare:

  • Are there adequate arrangements in place for welfare?

  • Clean & tidy?

  • Paper and hand washing available?

  • Location known if at site?

  • Within 10 minutes of worksite?

  • Adequate facility for resting/eating/drinking?

  • Worksite free from slipping /tripping hazards?

  • Litter correctly disposed of?

  • Equipment/materials stored/secured safely?

Manual Handling:

  • All operatives trained?

  • Are all staff training certificates available on request?

  • Is the manual handling training being followed i.e. safe lifting techniques?

  • Mechanical aids available?

Hazardous Substances:

  • Hazardous chemicals in correct containers?

  • Hazardous substances stored corrected when not in use?

  • COSHH assessments up to date and available?

  • Relevant and briefed to all staff?

  • Appropriate PPE available?

  • Gas detector available / calibrated?

Confined Spaces

  • Are there confined working areas in use?

  • Check the RAMS and ensure that the controls are in place

Pollution Control:

  • Emergency arrangements known/displayed?

  • All persons briefed and records kept?

  • Spillage kits available (or other appropriate measures e.g. sand bags, etc)?

  • Appropriate PPE available to deal with a spillage?

  • Drip trays and funnels available?

  • Drainage plan displayed?

  • Shouting/swearing kept to a minimum?

  • All engine/motor guards closed?

  • Low vibration equipment in use?

  • No lights shining into/onto residential buildings?

  • Site lighting Situated appropriately?

  • Site lighting Faced away from relevant traffic?

  • Site lighting: No unnecessary lights left on?

Waste management:

  • Are all waste bins available and clearly signed, not overflowing?

  • All personnel briefed?

  • All litter disposed of correctly?

  • Only approved waste contractors employed?

  • All scrap collected/disposed of correctly?

Inspection Details

  • Site Contractors Signature:

  • List the REQUIRED Actions?

  • Due By:

  • Any Further Comments

  • Project Manager/Supervisor:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.