Report Information
File Name
-
File Name
Date
-
Conducted on
Riley's Creek Dam Visual Inspection Report
-
Document No.
-
Audit Information
Dam Info
-
Auditor
- Shane Lethborg (TI)
- David Stockford (HA)
- Sebastian Stockford (HA)
- Chris Coad (Tassal)
- Add Auditor
-
Add Auditor
Person
-
Name
-
Company
-
Qualifications
-
Signature
-
Weather Conditions
-
Comment
-
Signs of Unauthorised Entry
-
Signs of Unauthorised Entry
- Gates Unlocked
- Signs of Unauthorised Entry
- Vandalism
-
Comment
-
General Comment
-
Add Visual Aid
-
Photo
-
Drawing
Reservoir
Key Dam Information
-
Full Supply Level = RL 62.90m
Full Supply Volume = 972ML -
Riley's Creek Dam Storage Table
Reservoir
-
Reservoir Banks
- OK
- Wave Damage
- Slips
- Slides
- Other Issues
-
Other Issues
-
Reservoir Level (m)
-
Reservoir Volume (ML)
-
Level sensor & Telemetry
- OK
- Flat Battery
- Low Battery
- Telemetry Not Sending
- Level Sensor Not Reading Accurate
- Other
-
Other
-
Call Entura Help desk
Ph: 6245 4369 -
General Observations
-
Add Visual Aid
-
Photo
-
Drawing
Dam Wall
Dam Wall
-
Upstream Face
- Ok
- Movement
- Cracking
- Erosion
- Debris on Wall
- Other Issues
-
Other
-
Debris at Upstream Face
-
Crest and Parapets
- Ok
- Movement
- Cracking
- Erosion
- Debris on Wall
- Other Issues
-
Other
-
Downstream Face
- Ok
- Movement
- Cracking
- Erosion
- Debris on Wall
- Other Issues
-
Other
-
Downstream Face Leakage
- OK
- Face Joints
- Pipes
- Other
-
Other
-
Comments
-
Add Visual Aid
-
Photo
-
Drawing
Outlet Tower
Tower Walkway
-
Tower Walkway
- OK
- Damaged
-
Is Walkway safe to be on?
-
Comment
Outlet Tower
-
Concrete
- OK
- Movement
- Cracking
- Leakage
- Other
-
Steelwork
- OK
- Damage
- Corrosion
- Other Issues
-
Other Issues
-
Inspected Inside Tower
-
Valve
- OK
- Valves Damaged
- Corrosion
- Leakage
- Other
-
Comment
-
Comments
-
Add Visual Aid
-
Photo
-
Drawing
Spillway
Spillway
-
Dam Spilling?
-
Spillway Approach
- OK
- Obstructions
- Blockage
- Other Issues
-
Other Issues
-
Crest
- Ok
- Movement
- Cracking
- Erosion
- Debris on Wall
- Other Issues
-
Other Issues
-
Downstream Face
- OK
- Movement
- Cracking
- Erosion
- Leakage
- Other Issues
-
Other Issues
-
Exposed Rock
- OK
- Rock Displacement
- Other Issues
-
Other Issues
-
Comments
-
Add Visual Aid
-
Photo
-
Drawing
Downstream of Dam
Downstream Of Dam
-
Left and Right Banks
- OK
- Leakage
- Erosion
- Slides
- Other Issues
-
Other Issues
-
River Bank
- OK
- Leakage
- Erosion
- Rock Displacement
- Other Issues
-
Other Issues
-
Comments
-
Add Visual Aid
-
Photo
-
Drawing
Outlet Works (Downstream Toe)
Outlet
-
Pipe works
- OK
- Valves Damaged
- Corrosion
- Leakage
- Other
-
Comment
-
Outlet Valve
- OK
- Valves Damaged
- Corrosion
- Leakage
- Other
-
Contact Bill Whinnett
Ph: 0409 947 788 -
Comment
-
Outlet Valve Open
-
Valve Release (ML/Day)
-
Environmental Release Valve Open
-
Measure Drainage Pipes
-
Leakage
Measurement
-
Drainage Pipe Number
-
Flow (L/Min)
-
Comments
-
Add Visual Aid
-
Photo
-
Drawing
Summary
Summary of Required Actions
-
Are There any items which require more detailed monitoring?
-
Comment
-
Is an inspection by specialist personnel required?
-
Comment
-
Is further advice required?
-
Comment
Sign off
-
Add signature
Contacts
-
Mike O'Shea - Emergency Event Manager
-
Mobile : 0448 389 930
Email : Mike.Oshea@tasmanianirrigation.com.au -
David Wightman - Dam Safety Engineer
-
Work : (03) 6398 8414
Mobile : 0418 352 884
Email : David.Wightman@tasmanianirrigation.com.au