Name of insured / client
-
Customer email
-
Name of Broker, if applicable
-
Broker contact number, if applicable
-
Broker email, if applicable
-
Location
-
Conducted on
-
Prepared by
Recommendation definitions
Key risk improvement recommendations (definitions on priorities)
-
Actions marked as "High" – Recommendation to address significant deficiencies in relation to the level of controls where they do not meet best industry practice or internationally recognised standards. This must apply where there is a significant likelihood of a loss event and in the event of a loss, the consequence is expected to be significantly higher in comparison to where adequate controls are in place.
-
Actions marked as "Medium" – Recommendation to address deficiencies in relation to the level of controls whereas they do not meet best industry practice and internationally recognised standards. Deficiency may increase the likelihood of a loss event, or consequence in the event of a loss event.
-
Actions marked as "Low" – Considered to be best industry practice with a low likelihood and consequence in relating to loss exposure.
Construction
- Building details
Building/Structure Construction
-
Enter building name
-
Year of Construction
-
Floor Area ~m2
-
No. Storeys
Structure
-
Walls
-
Floors
-
Roof
ISP & EIFS
-
Insulated Sandwich Panel (ISP) type
-
ISP %
-
Are routine ISP inspections undertaken?
-
Is the ISP in adequate condition?
-
Is there a cold work process and procedure in place?
-
External Insulated Finishing Systems Type
-
What is the material type?
Other factors
-
Does the building construction include asbestos?
-
What building elements include asbestos materials?
-
Is the building heritage listed?
-
What elements of the building are heritage listed?
General comments about this building
-
General comments
Occupancy
Overall
-
What is the occupancy use / use of this property
Hazardous Activities
-
Are any hazardous processes are undertaken?
-
Is the heating equipment provided with temperature cut-outs or monitoring?
-
Is the cooking equipment hoods / exhaust duct subject to cleaning?
-
How often are the hoods / exhaust cleaned?
-
Who is engaged to conduct the cleaning?
-
Is there photographic evidence to support the cleaning schedule?
-
Is there a routine cleaning programme to remove combustible dust build-up?
-
Has hazardous area assessment been undertaken with an up to date dossier available complete with hazardous area zoning?
-
Is electrical equipment adequately rated for hazardous areas?
-
Type of spray painting booth?
-
Are filters subject to routine cleaning?
-
Are spray booths fitted with forced drying fitted with appropriate safety controls and are these routinely tested?
-
What other hazardous activities are in place and are safety controls adequate?
Utility
-
Utilities that present site exposures?
- Electricity
- Gas
- Water
- Wastewater
-
Describe hazards associated with utilities.
Storage
General storage
-
List any storage arrangements, height and material stored
-
Is racking provided with impact protection on uprights?
-
Are racking inspections undertaken?
-
Is lighting adequately separated from storage?
-
Are electric forklift charging areas provided with >2m separation from storage?
Flammable liquids/dangerous goods
-
What flammable liquids are stored and in what arrangement?
-
Are suitable storage and containment practices in place?
-
Are flammable liquid transfer practices, e.g. earthing and bonding in place? <br>(e.g. placing a fuel tank on the bottom to reduce static discharge)
Dangerous goods
-
What dangerous goods are stored and in what arrangement?
-
Are gas cylinders adequately secured (for stability)?
-
Are dangerous goods (such as cylinders) segregated? <br>(e.g. oxygen away from flammable gases)
-
Are appropriate hazards material placard in place?
Loss prevention management controls
Contractor controls
-
Are contractors vetted, insurance details and licencing details confirmed?
-
Are contractors supervised on site?
-
Are the contractors provided induction training?
-
Do contractors follow site loss prevention management controls?
Hazardous works
-
Is there a documented hot works procedure and permit system in place and implemented?
-
Does the hot works permit require a fire watch during and 30 minutes after the completion of work?
-
Is a monitoring period undertaken after the completion of fire watch (minimum 1 hour)?
-
Is a minimum of 10m separation from combustible materials, or fire resistant shielding / covers required?
-
Is equipment checked prior to use and the flashback arrestors fitted?
Fire impairment mangement
-
Is a fire impairment procedure in place?
Smoking controls
-
Is there a dedicated smoking area provided with adequate signage?
-
Are self-extinguishing bins provided?
-
Is the smoking area separated from any entry door or combustible storage by at least 4 meters?
Building maintenance
-
Is housekeeping adequate?<br>(Note: no build up of combustible materials around electrical switchboards and waste materials removed from building?)
-
How often are self-inspections undertaken and by whom?
-
Is vegetation appropriately cut back from buildings?
-
Is roofing (gutters & drains) subject to routine inspections and clearing?
Liability exposure & emergency planning
-
Is liability coverage required?
-
How often are inspections of public accessible areas undertaken? <br>(Eg. identification of trip hazards, etc)
-
Are public accessible areas in adequate condition?
-
Is emergency lighting and exit signs operational and maintained?
-
Do you undertake regular fire drills?
-
Are emergency egress routes clear?
-
Is an evacuation plan in place and is it displayed in common areas?
Summary / wrap up
-
General comments about occupancy
Fire Protection
Fire water supply
-
What is the fire water supply to site?
-
What type of fire water supply is available?
-
Has a water supply proving test been undertaken? <br>(Attach the results of the test via a photo/image if possible)
-
Do the results meet the system design requirements?
-
Are all fire water isolation valves adequately secured?
Automatic sprinkler protection
-
Is the building sprinkler protected?
-
Is there a sprinkler block plan in place?<br>(Attach the results of the test via a photo/image if possible)
-
What sprinkler protection monitoring is undertaken?
- Certified automatic fire alarm service provider
- Security
- On site
- None
-
Does the sprinkler design align with the current occupancy type/use?
-
Is sprinkler protection adequately maintained?
Fire detection
-
Type of fire detection installed?
-
Is fire detection coverage adequate for occupancy type?
-
What fire detection monitoring undertaken?
- Certified automatic fire alarm service provider
- Security
- On site
- None
-
Is the fire detection system adequately maintained?
-
Is the fire panel clear of any off-normal conditions (alarms, faults or isolation)?
Fixed fire protection systems
-
Are there any fixed fire protection systems installed?
- Gaseous extinguishing system
- Deluge or water spray system
- Kitchen extinguishing system
- Water mist system
- Other (add to notes)
-
What areas/equipment does this fixed protection cover?
-
Is coverage adequate?
-
Is maintenance adequate?
Fire hydrants
-
Where are fire hydrants installed?
- Internal
- External
- Street only
- None
-
Are fire hydrants maintained?
-
Are hydrants accessible with adequate impact protection to prevent damage?
-
What is the indicated system design?
-
Is there a hydrant block plan displayed?
-
Is the block plan up to date and legible?
Fire extinguishers and hose reels
-
Is there adequate fire extinguisher and hose reel coverage?
-
Are the fire extinguishers and hose reels accessible?
-
Is adequate signage provided for the fire extinguishers and hose reels?
-
Is the fixed fire equipment adequately maintained?
Fire response
-
Is the local fire brigade a full time or volunteer?
- Full time brigade
- Volunteer services
- Trained onsite fire brigade
- Other (add to notes)
-
What's the local fire brigade response time?
-
Is fire brigade access available to all aspects of the building?
-
General comments about fire protection
Exposures
Security controls
-
Are site and building physical access controls adequate?
-
Is the building provided with an intruder detection system?
- Motion detection
- Door contacts
- Site perimeter
-
What monitoring is provided?
-
What response on alarm is provided?
- Keyholder response (indicate expected response time)
- Security guard automatic
- Security guard on keyholder request
- Onsite personnel
-
Is there a business process / roster in place to ensure a staff member is on call?
-
Where is CCTV installed?
- Internal to the building
- External to the building
- None
-
Is CCTV coverage adequate?
-
Is CCTV monitored offsite?
-
Does the keyholder have remote access to CCTV?
-
Where are CCTV recording retained?
Security patrols
-
Are security patrols undertaken?
- Onsite security
- Out of hours periods only
- None
-
Where are security patrols undertaken?
- Perimeter
- Onsite external to building
- Internal to building
- None
-
What types of security patrols undertaken?
Cash management
-
Is cash retained or collected onsite?
-
Is cash handling undertaken in a secure area?
-
Do you vary cash handling protocols?
-
Do you vary banking of cash protocols?
-
Is there a cash handling procedure including checks to deter employee theft and dishonesty?
Onsite external exposures
-
Are idle pallets adequately separated from the building? <br>(>10 meters)
-
Are waste bins adequately separated from buildings?<br>(>10 meters)
-
Is there any other combustible storage within 10 meters of the building?
Offsite external exposure (neighbouring facilities)
-
Is the building set back from the boundary (10 metres)?
-
What is the neighbouring premises exposure?
-
Is there any combustible storage along adjoining boundary?
Natural and other hazards (note any previous incidents/claims)
-
Flood
-
Windstorm
-
Storm surge
-
Bushfire
-
Earthquake
-
Lightning
-
Hailstorm
-
Collapse / subsidence
-
Impact damage
Business interruption and continuity
-
Is there business interruption coverage?
-
Are there any interdependancies / Internal single point dependencies?<br>(Such as a specific component that is only produced in one area of the business)
-
Are there any suppliers that provide greater than 25% of supplies to the business?
-
Are there any customers that account for greater than 25% of output to the business?
-
Is there any critical equipment that accounts for 25% of reduction?
-
Is there a high dependency on any of the following utilities?
- Electricity
- Gas
- Water
- Communications
-
Which of the following IT backup and disaster recovery planning is in place?
-
Is there a documented and tested business continuity plan in place?
-
Is the business continuity plan reviewed annually?
Risk summary & overall findings
Follow up & final comments
-
Overall summary
-
Recommend onsite assessment?