Information
-
CP/SP/WO
-
Site Name
-
Site Power Id
-
Project description
- Power system install
- LOD Install
- Battery install
- Rectifier Install
- General works
-
Prepared by
-
Date project commenced
-
RFU date
Project Pre start
-
All permits, method of procedures, WINS and CRQ's been approved
-
SHEWMS signed and onsite
-
JSEA and Start cards filled out before commencing works
-
Date and time Delivery has been organised
-
Date and time Delivery actually arrived
-
Did all the material arrive as per design
-
PLEASE CONTACT DESIGNER TO VERIFY MATERIAL
-
Is any of the material damaged or missing any components
-
PLEASE LIST DEFECTS BELOW AND COPY/EMAIL TO SUPERVISOR:
PROJECT
-
Are battery, rectifier, LOD, Distribution and general racks being installed as part of the Scope
-
How many racks are being installed
-
Have the racks been installed with accordance with the structual report
-
Have all fixings tight
-
Are the racks isolated from the ironwork and from floor
-
Are the racks earthed according to the design
-
Cabling inside the rack dressed in a suitable and professionable manner
-
Are alarms required
-
DQO operator name:
-
Date and time alarms were put in service for rack
-
Rack labelling is in accordance with the latest labelling manual
-
Is Cable tray being installed
-
Has the cable tray been installed as per the project drawings
-
Does the cable tray adhere to the structual report
-
Does the cable tray bond multiple superstructures
-
Does the cable tray have a bond to earth
-
All sharp edges been eliminated
-
cable tray edge protection been installed on bare cable tray ends
-
Has cold creep protection been installed
-
All fixings tight and secure
-
Load rating stickers been installed on installed cable tray
-
All penetrations been filled
-
Has DC cabling been installed
-
Number of cables installed aligns with the latest version of drawings
-
Number of cables installed aligns with cable calculation table in the scope
-
Polarity of cabling checked
-
Add signature
-
Resistance of cable insulation tested
-
Add signature
-
All cable ties flushed
-
Cables are secured less than 400mm between fixings
-
Cold creep installed where cabling rests on cable tray wall
-
Heat shrink used on neck of lugs
-
All cables labelled with origin and destination details
-
connection bolts/nuts doubled torqued to recommended settings
-
time and date of first torque
-
time and date of second torque
-
Has stainless steel fixings been used for Earthing connections on SPC/TSEB bar
-
Is a Power system being installed
-
Dual or Single plane system
- Single
- Dual
-
Pwr ID's of new system:
-
Location of power system is as per design
-
Power system mounted securely.
-
Perform short circuit test on all conductors inside power system
-
Rack bonded to SPC
-
Pos bar bonded to SPC
-
Power system has label that indicates 2 AC supplies
-
isolators mounted as per design
-
The number of rectifiers installed equal the amount in design
-
Parameters been set for A plane
-
Does the system require the B plane parameters to be set
-
Have the alarms been commissioned by the DQO
-
Name DQO operator
-
Date and time commissioned by DQO
-
Alarms Verified by Telstra power and facilities or by SASI
-
Date and time commissioned by Telstra power and facilities
-
Alarm cabling labelled with wrap around labels
-
All load CB's operate normally
-
Temperature Compensation enabled
-
Power system labelled as per label manual
-
Max design value on labelling equals to drawings and scope
-
Are batteries being installed
-
Type of battery installed is the same as the design
-
The amount of batteries installed equal to design
-
Batteries free of damage
-
Batteries free of Acid
-
Battery shelves are clean
-
Batteries linked as per manufacture's manual
-
Polarity of batteries are correct
-
All Battery Acceptance values pass
-
Date of acceptance readings
-
What battery test was performed
-
Did all cells pass the 20 minute discharge test
-
Date of test
-
Add signature
-
Site load measured
-
Did the batteries stay within parameters during test
-
Do the Battery BMP's match the drawings and scope
-
Battery books are fully completed and left onsite
-
Are Rectifiers being installed on this project
-
The amount of rectifiers installed equal the drawings and scope
-
Rectifiers installed accordingly over all 3 supplies as balanced as possible
-
Rectifier alarms extend to Alarm collector
-
AC cabling installed on the project
-
Name of electrician resposible of works
-
electrican licence number
-
Signature of electrician
-
Installation testing has been performed and passed on all new installed LV electrical cabling
-
All electrical work is in accordance with AS 3000
-
Installation testing has been performed and passed on all new installed LV electrical equipment
-
Cable insulation type suitable for the enviroment where it is installed
-
Cabling secure not less than every 400mm
-
Cables ties cut flush
-
pole fillers installed on spare locations of switchboards
-
Switchboard legend filled out
-
Up stream protection matches design and drawings
-
Connection screws and bolts double checked for tightness
-
mechanical protection installed
-
Can the all isolation points of the new installation be locked out during an event of isolation
-
EBT installed adjacent to the Main Switchboard
-
ELECTRICAL COMPLIANCE CERTIFICATE NUMBER:
-
Is a LOD being installed
-
Does the LOD match the design and scope
-
Is the LOD installed in the correct location as per the design and drawings
-
Configuration of LOD matches drawings and scope
-
Polarity of LOD is correct
-
Alarms tested to DQO
-
Name of DQO operator:
-
Date and time of alarm commissioning
-
DIP switches are in the correct positions
-
All connection bolts have been double torqued
-
Date of first Torque
-
signature
-
Date of second torque
-
Signature
-
MAX demand value on labelling matches design and scope
-
Labelling is in accordance with the label manual
AS BUILT
-
As built drawings marked in RED and in english
-
All client required documentation compiled in a ZIP file that is less than 10MB
-
All As built photos must be of a clear and sharp quality
-
As built photos must be compiled in a ZIP file that is less than 10MB
-
All documentation uploaded onto sharepoint or sent to the supervisor
-
Date and Time As built documentation uploaded onto sharepoint or sent to supervisor