Information
-
FFP or Viscore ID
-
Conducted on
-
Completed by
Environment
-
Have erosion, sediment controls and stock pile been removed from site
-
Has machinery been removed from site?
Safety
-
Are all work areas are clear from debris and equipment removed off site? eg: fencing, barriers
-
Have all excavation been back filled? If not why, and explain how they have protected them. E.g. Plates
-
If excavations aren't backfilled, please explain why and how the excavations are protected. EG Plate
-
Have all trip hazards been eliminated? This includes completing required topsoiling.
-
Are all signs removed from site? (Except sites with open/secured excavations).
-
If permanent reinstatement has not been completed, have all areas been coldmixed?
Completed audit
-
Other Comments
-
Signature of Site Manager
-