Title Page

  • Audit Title

  • DOES WORK ORDER COINCIDE WITH TANK BEIG BUILT ? take a picture

  • ARE ELECTRICAL WIRES SECURED TUG ON EACH WIRE?

  • ARE THE SERIAL NUMBERS AND GREEN TAG AFFIXED TO TANK ? take a picture <br>

  • IS THE BYPASS VALVE WITH THE TANK ? take a picture

  • IS THE MANUAL ACCOUNTED FOR ? take a picture <br>

  • ARE THE RED FITTING LOCKING CLIPS AND DLFC INSTALLED? take a picture

  • SYSTEM HERTZ

  • SYSTEM AMPS

  • ASSEMBLE BY

  • INSPECTED BY

  • Add media

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.