Title Page
-
MDU REF:
-
Priority:
- P1
- P2
- P3
- P4
- P5
- P minor
- Converted House
-
Prepared by
-
Conducted on
-
Building Name
-
Address
-
Post Code
-
Floor Count?
-
Building Owner/MA?
-
Have you completed your site specific Rick Assessment?
-
Please attach photo
-
Is this a non-intrusive Survey? (No ceiling tiles to be lifted and ONLY VMO2 containment to be inspected)
- Yes
- No
-
Asbestos Register Required?
General Building Information
-
Total Premise Count?
-
Number of Floors?
-
Please provide photo
-
Are keys required to gain access to the building and lockbox/DP location/s?
-
Provide Details of Access Keys
-
Provide Photo Evidence of the Block showing the name plaque, the Street Name Sign and the block in the background, and the Estate Map (If applicable)
External Build Details
-
Is there external VMO2 cabling to the building?
-
Select the Cabling Type
-
Provide Evidence of the selected Cabling Type - (Clipped/Containment/Catenary/Mixed)
-
How is the cable presented at the Block?
-
Do you require access to the roof to survey the Network Equipment/Cabling?
-
Is it safe to access the roof? (IE by approved VMo2 methods - fixed stair case only and the roof has edge protection / Guardrails / Parapet Walls of the correct height)
-
Are any external VMo2 cable/VMo2 Cable containment/Tray work adequately secured?
-
Are there access/egress routed affected?
-
Are there any external VMO2 drop cables running along and/or above walkways and enter into properties? (All entry holes into premises need to be inspected to ensure they are adequately filled)
-
For VMo2 Cabling entering the building, is the hole adequately fire sealed?
-
Is there an Integrated Reception System [IRS] in this building that is compatible for VMO2 upgrade/use?
-
-
Is there internal VM02 cabling to the building?
-
How does the network cable enter the building?
-
Is the Internal UG Duct adequately sealed? (I.E Gas Sealed)
-
Are the Internal VMO2 Cables/ Internal VMO2 Trunking in the Access/Egress Routes throughout the building adequately supported? (I.E by plastic cable clips/cable ties)
-
Are there any locations where the VMO2 Cabling/Containment is affected?
-
Where Internal VMO2 cables enter into properties (typically through door frames/walls), has the hole around the cable been adequately filled?
-
Where VMO2 cables pass through a floor, has the hole around the cable been adequately filled? (No cracks, holes or missing sections in filling)
-
Are there cables passing through the floors that are used by VMO2, or shared with other providers?
-
Is there evidence that there has been any unauthorised works on the Internal VMO2 cabling? (3rd party cabling inside VMO2 trunking, damaged by 3rd party installations)
-
Where are the Cabinet/s located?
-
What condition is the cabinet in?
-
Attach Building Schematic (photo of Building layout)
-
Rate the priority of remedial work required for this building
- P1
- P2
- P3
- P4
- P5
- P minor
- Converted House
-
Provide Detail of the works required.
-
Please provide any access arrangements required.
-
Have you seen any Non-Virgin Media related Health and Safety advisories that should be reported to the building owner under a duty of care?