Information
-
Client / Site
-
Audit Title
-
Document No.
-
Conducted on
-
Prepared by
-
Location
-
Personnel
First Aid and Emergency
-
Stocked/Current first aid kit on-site
-
Crisis Management Kit on-site
-
Stokes Basket on-site and accessible
PPE
-
Hardhat, Safety Glasses, Work Gloves, Proper Boots
-
FR Clothing
-
High Visibility Clothing
-
Respiratory protection used as necessary
-
Hearing protection used as necessary
-
No shorts/sleeveless shirts
-
Other PPE (face protection; specialty equipment; etc.)
Fall Protection
-
Proper fall protection at 6' or greater
-
Personnel below are protected from falling objects
-
Controlled access zones used
-
Warning lines 6'-10' from edge
-
Wall opening guarded
-
Open sided floors or platforms 6' or more from lower level equipped with proper guardrail
-
Floor openings 2" or more properly barricaded/protected/secured/marked/covered
-
Guardrails in place/replaced after each load received
Electrical
-
Assured Grounding Program up to date
-
All electrical equipment in good condition
-
Lighting cords and wiring secured with NON-conductive material
-
Power tools are protected with GFCI or internal grounding
-
Pinch/drive-over hazards eliminated
-
Terminal boxes properly covered
-
Exposed light bulbs equipped with protective cage and bulbs in place
-
Good work practices (cords out of pathways, kept out of water, etc.)
-
Adequate Arc Flash Protection
-
Arc Flash Equipment inspected and in good condition
Confined Space
-
Declared Permit or non-permit
-
Rescue Plan communicated and understood
-
Air monitor on site (properly calibrated, properly used)
-
Atmosphere test results documented
-
Energy sources locked out/tagged out
-
Adequate ventilation
Excavations
-
Competent person on-site
-
Was one-call system contacted
-
Protective system
-
Holes, trenches, excavations, etc. are identified and protected
-
Surface encumbrances protected/supported
-
Ladder or ramp within 25' of all employees in trenches 4' or greater in depth
-
Utilities protected/supported
-
Spoil piles minimum of 2' from edge of excavation
-
Overhead power lines minimum distance of 20'
-
Only Vogel Bros employees using Vogel Bros equipment
Other items found
Positive Insight
-
Comments
-
Safety Representative
-
Superintendent
-
Foreman