General Information

  • Daily Site Progress Report

  • Document No.

  • Client /Site - ENKA Construction LTD

  • Waagner Biro Steel & Glass

  • Prepared by: Michael Sharkey

  • Location

Personnel

WAAGNER BIRO PERSONNEL

  • WAAGNER BIRO OFFICE TEAM

  • Facade Contractor - FK Ltd

  • Steel Contractor - SWC Ltd

  • Painting Contractor - LSS Ltd

  • Cap pins Contractor - CABS Ltd

  • Painting Contractor - Curtis Ltd

  • Welding Contractor- MG Fabrications Ltd

  • Welding Contractor -Shawtons

Weather Conditions

  • Temperature

  • Sunny

  • Raining

  • Windy

H&S on site

JOB INFORMATION

  • OSHA 300 forms complete and posted from February 1 - April 30?<br>

  • OSHA and DOL posters posted?

  • Emergency phone numbers posted?

  • Tool box safety talks log up to date?

  • MSDS filed?

  • Work areas properly signed and barricaded?

HOUSEKEEPING

  • Work areas neat?

  • Projecting nails or screws bent over or removed?

  • Waste containers provided and used?

  • Passageways and walkways clear?

  • Cords and leads off the floor?

FIRE PREVENTION

  • Adequate fire extinguishers, checked and accessible?

  • Phone no. of Fire Department posted?

  • "No Smoking" posted and enforced near flammables?

ELECTRICAL

  • Extension wires with bare wires or missing ground prongs taken out of service?

  • Ground fault interrupters being used?

  • Terminal boxes equipped with required covers?

HAND, POWER & POWDER ACTUATED TOOLS

  • Hand tools inspected regularly?

  • Guards in place on machines?

  • Correct tool being used for job at hand?

  • Operators of powder actuated tools licensed?

FALL PROTECTION

  • Safety rails and cables secured properly?

  • Safety harnesses worn properly?

  • Employees exposed to fall hazards tied off?

  • Employees below protected from falling objects?

LADDERS

  • Ladders extended at least 36" above landing?

  • Ladders are secure to prevent slipping, sliding or falling?

  • Ladders with split or missing rungs taken out of service?

  • Stepladders used in fully open position?

  • No step at top two rungs of stepladder?

WORKING AT HIGH

  • All scaffolding inspected daily?

  • Erected on sound rigid footing?

  • Tied to structure as required?

  • Guardrails, intermediate rails, toe boards and screens in place?

  • Planking is sound and sturdy?

  • Proper access provided?

  • Employees below protected from falling objects?

FLOOR & WALL OPENINGS

  • All floor openings planked over or barricaded?

  • Perimeter protection in place?

  • Deck planks secure?

  • Materials stored away from edge?

TRENCHES, EXCAVATION & SHORING

  • Competent person identified and present?

  • Excavations are shored and sloped back?

  • Materials are stored at least 2' away from trench?

  • Ladders provided every 25' in trench?

  • Equipment is at a safe distance from edge of trench or excavation?

MATERIAL HANDLING

  • Materials properly stored or stacked?

  • Employees using proper lifting techniques?

  • Tag lines used to guide loads?

  • Proper number of workers for each operation?

WELDING AND BURNING

  • Gas cylinders stored upright?

  • Proper separating distances between fuels & oxygen?

  • Goggles or shields used?

  • Fire extinguishers readily available?

  • Hoses in good condition?

CRANES

  • Outriggers extended and swing radius barricade in place?

  • Operator is familiar with load charts?

  • Hand signal charts on crane?

  • Crane operator logs up to date?

  • Employees kept from under suspended loads?

  • Chains and slings inspected and tagged as required?

CONCRETE CONSTRUCTION

  • Employees are protected from cement dust?

  • Exposed skin covered?

  • Runways are adequate?

PERSONAL PROTECTIVE EQUIPMENT

  • Hard hats being worn?

  • Safety glasses being worn?

  • Respirators used when required? Proper respirator documentation available?

  • Hearing protection being worn when required?

  • Traffic vests or high visibility clothing material being worn?

  • Safety Manager

  • Superintendent

Daily Site Progress Report

BLOCK 1 - 35

STRUCTURAL STEEL

  • SETTING OUT

  • COLUMS INSTALLATION

  • WELDING

  • SNAGGING AND TORQUING

  • PAINTING

  • REMIDIALS WORKS

SECONDARY STEEL

  • SECONDARY STEEL INSTALLATION

FACADE WORKS

  • SETTING OUT

  • BRACKET INSTALLATION

  • WALL PANELS INSTALLATION

  • ROOF PANELS INSTALLATION

  • CW -STICK WORK INSTALLATION

  • CW - GLAZING

  • LOUVERS INSTALLATIONS

  • FLASHINGS INSTALLATIONS

  • COPINGS INSTALLATION

BLOCK 2 - 35

STRUCTURAL STEEL

  • SETTING OUT

  • COLUMS INSTALLATION

  • WELDING

  • SNAGGING AND TORQUING

  • PAINTING

  • REMIDIALS WORKS

SECONDARY STEEL

  • SECONDARY STEEL INSTALLATION

FACADE WORKS

  • SETTING OUT

  • BRACKET INSTALLATION

  • WALL PANELS INSTALLATION

  • ROOF PANELS INSTALLATION

  • CW -STICK WORK INSTALLATION

  • CW - GLAZING

  • LOUVERS INSTALLATIONS

  • FLASHINGS INSTALLATIONS

  • COPINGS INSTALLATION

BLOCK 3 - 35

STRUCTURAL STEEL

  • SETTING OUT

  • COLUMS INSTALLATION

  • WELDING

  • SNAGGING AND TORQUING

  • PAINTING

  • REMIDIALS WORKS

SECONDARY STEEL

  • SECONDARY STEEL INSTALLATION

FACADE WORKS

  • SETTING OUT

  • BRACKET INSTALLATION

  • WALL PANELS INSTALLATION

  • ROOF PANELS INSTALLATION

  • CW -STICK WORK INSTALLATION

  • CW - GLAZING

  • LOUVERS INSTALLATIONS

  • FLASHINGS INSTALLATIONS

  • COPINGS INSTALLATION

BLOCK 4

STRUCTURAL STEEL

  • SETTING OUT

  • COLUMS INSTALLATION

  • WELDING

  • SNAGGING AND TORQUING

  • PAINTING

  • REMIDIALS WORKS

SECONDARY STEEL

  • SECONDARY STEEL INSTALLATION

FACADE WORKS

  • SETTING OUT

  • BRACKET INSTALLATION

  • WALL PANELS INSTALLATION

  • ROOF PANELS INSTALLATION

  • CW -STICK WORK INSTALLATION

  • CW - GLAZING

  • LOUVERS INSTALLATIONS

  • FLASHINGS INSTALLATIONS

  • COPINGS INSTALLATION

BLOCK 5

STRUCTURAL STEEL

  • SETTING OUT

  • COLUMS INSTALLATION

  • WELDING

  • SNAGGING AND TORQUING

  • PAINTING

  • REMIDIALS WORKS

SECONDARY STEEL

  • SECONDARY STEEL INSTALLATION

FACADE WORKS

  • SETTING OUT

  • BRACKET INSTALLATION

  • WALL PANELS INSTALLATION

  • ROOF PANELS INSTALLATION

  • CW -STICK WORK INSTALLATION

  • CW - GLAZING

  • LOUVERS INSTALLATIONS

  • FLASHINGS INSTALLATIONS

  • COPINGS INSTALLATION

BLOCK 6

STRUCTURAL STEEL

  • SETTING OUT

  • COLUMS INSTALLATION

  • WELDING

  • SNAGGING AND TORQUING

  • PAINTING

  • REMIDIALS WORKS

SECONDARY STEEL

  • SECONDARY STEEL INSTALLATION

FACADE WORKS

  • SETTING OUT

  • BRACKET INSTALLATION

  • WALL PANELS INSTALLATION

  • ROOF PANELS INSTALLATION

  • CW -STICK WORK INSTALLATION

  • CW - GLAZING

  • LOUVERS INSTALLATIONS

  • FLASHINGS INSTALLATIONS

  • COPINGS INSTALLATION

WAREHOUSE - 35

STRUCTURAL STEEL

  • SETTING OUT

  • COLUMS INSTALLATION

  • WELDING

  • SNAGGING AND TORQUING

  • PAINTING

  • REMIDIALS WORKS

SECONDARY STEEL

  • SECONDARY STEEL INSTALLATION

FACADE WORKS

  • SETTING OUT

  • BRACKET INSTALLATION

  • WALL PANELS INSTALLATION

  • ROOF PANELS INSTALLATION

  • CW -STICK WORK INSTALLATION

  • CW - GLAZING

  • LOUVERS INSTALLATIONS

  • FLASHINGS INSTALLATIONS

  • COPINGS INSTALLATION

DISPATCH BUILDING - 35

STRUCTURAL STEEL

  • SETTING OUT

  • COLUMS INSTALLATION

  • WELDING

  • SNAGGING AND TORQUING

  • PAINTING

  • REMIDIALS WORKS

SECONDARY STEEL

  • SECONDARY STEEL INSTALLATION

FACADE WORKS

  • SETTING OUT

  • BRACKET INSTALLATION

  • WALL PANELS INSTALLATION

  • ROOF PANELS INSTALLATION

  • CW -STICK WORK INSTALLATION

  • CW - GLAZING

  • LOUVERS INSTALLATIONS

  • FLASHINGS INSTALLATIONS

  • COPINGS INSTALLATION

CANOPY -35

STRUCTURAL STEEL

  • SETTING OUT

  • COLUMS INSTALLATION

  • WELDING

  • SNAGGING AND TORQUING

  • PAINTING

  • REMIDIALS WORKS

SECONDARY STEEL

  • SECONDARY STEEL INSTALLATION

FACADE WORKS

  • SETTING OUT

  • BRACKET INSTALLATION

  • WALL PANELS INSTALLATION

  • ROOF PANELS INSTALLATION

  • CW -STICK WORK INSTALLATION

  • CW - GLAZING

  • LOUVERS INSTALLATIONS

  • FLASHINGS INSTALLATIONS

  • COPINGS INSTALLATION

CHP Turbine building - 45

STRUCTURAL STEEL

  • SETTING OUT

  • COLUMS INSTALLATION

  • WELDING

  • SNAGGING AND TORQUING

  • PAINTING

  • REMIDIALS WORKS

SECONDARY STEEL

  • SECONDARY STEEL INSTALLATION

FACADE WORKS

  • SETTING OUT

  • BRACKET INSTALLATION

  • WALL PANELS INSTALLATION

  • ROOF PANELS INSTALLATION

  • CW -STICK WORK INSTALLATION

  • CW - GLAZING

  • LOUVERS INSTALLATIONS

  • FLASHINGS INSTALLATIONS

  • COPINGS INSTALLATION

STARCH BUILDING - 36

STRUCTURAL STEEL

  • SETTING OUT

  • COLUMS INSTALLATION

  • WELDING

  • SNAGGING AND TORQUING

  • PAINTING

  • REMIDIALS WORKS

SECONDARY STEEL

  • SECONDARY STEEL INSTALLATION

FACADE WORKS

  • SETTING OUT

  • BRACKET INSTALLATION

  • WALL PANELS INSTALLATION

  • ROOF PANELS INSTALLATION

  • CW -STICK WORK INSTALLATION

  • CW - GLAZING

  • LOUVERS INSTALLATIONS

  • FLASHINGS INSTALLATIONS

  • COPINGS INSTALLATION

INSTALLED STEEL TONAGE

  • INSTALLED STEEL SCHEDULE

Signaures

  • Report made by: Michael

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.