General Information
-
Daily Site Progress Report
-
Document No.
-
Client /Site - ENKA Construction LTD
-
Waagner Biro Steel & Glass
-
Prepared by: Michael Sharkey
-
Location
Personnel
WAAGNER BIRO PERSONNEL
-
WAAGNER BIRO OFFICE TEAM
-
Facade Contractor - FK Ltd
-
Steel Contractor - SWC Ltd
-
Painting Contractor - LSS Ltd
-
Cap pins Contractor - CABS Ltd
-
Painting Contractor - Curtis Ltd
-
Welding Contractor- MG Fabrications Ltd
-
Welding Contractor -Shawtons
Weather Conditions
-
Temperature
-
Sunny
-
Raining
-
Windy
H&S on site
JOB INFORMATION
-
OSHA 300 forms complete and posted from February 1 - April 30?<br>
-
OSHA and DOL posters posted?
-
Emergency phone numbers posted?
-
Tool box safety talks log up to date?
-
MSDS filed?
-
Work areas properly signed and barricaded?
HOUSEKEEPING
-
Work areas neat?
-
Projecting nails or screws bent over or removed?
-
Waste containers provided and used?
-
Passageways and walkways clear?
-
Cords and leads off the floor?
FIRE PREVENTION
-
Adequate fire extinguishers, checked and accessible?
-
Phone no. of Fire Department posted?
-
"No Smoking" posted and enforced near flammables?
ELECTRICAL
-
Extension wires with bare wires or missing ground prongs taken out of service?
-
Ground fault interrupters being used?
-
Terminal boxes equipped with required covers?
HAND, POWER & POWDER ACTUATED TOOLS
-
Hand tools inspected regularly?
-
Guards in place on machines?
-
Correct tool being used for job at hand?
-
Operators of powder actuated tools licensed?
FALL PROTECTION
-
Safety rails and cables secured properly?
-
Safety harnesses worn properly?
-
Employees exposed to fall hazards tied off?
-
Employees below protected from falling objects?
LADDERS
-
Ladders extended at least 36" above landing?
-
Ladders are secure to prevent slipping, sliding or falling?
-
Ladders with split or missing rungs taken out of service?
-
Stepladders used in fully open position?
-
No step at top two rungs of stepladder?
WORKING AT HIGH
-
All scaffolding inspected daily?
-
Erected on sound rigid footing?
-
Tied to structure as required?
-
Guardrails, intermediate rails, toe boards and screens in place?
-
Planking is sound and sturdy?
-
Proper access provided?
-
Employees below protected from falling objects?
FLOOR & WALL OPENINGS
-
All floor openings planked over or barricaded?
-
Perimeter protection in place?
-
Deck planks secure?
-
Materials stored away from edge?
TRENCHES, EXCAVATION & SHORING
-
Competent person identified and present?
-
Excavations are shored and sloped back?
-
Materials are stored at least 2' away from trench?
-
Ladders provided every 25' in trench?
-
Equipment is at a safe distance from edge of trench or excavation?
MATERIAL HANDLING
-
Materials properly stored or stacked?
-
Employees using proper lifting techniques?
-
Tag lines used to guide loads?
-
Proper number of workers for each operation?
WELDING AND BURNING
-
Gas cylinders stored upright?
-
Proper separating distances between fuels & oxygen?
-
Goggles or shields used?
-
Fire extinguishers readily available?
-
Hoses in good condition?
CRANES
-
Outriggers extended and swing radius barricade in place?
-
Operator is familiar with load charts?
-
Hand signal charts on crane?
-
Crane operator logs up to date?
-
Employees kept from under suspended loads?
-
Chains and slings inspected and tagged as required?
CONCRETE CONSTRUCTION
-
Employees are protected from cement dust?
-
Exposed skin covered?
-
Runways are adequate?
PERSONAL PROTECTIVE EQUIPMENT
-
Hard hats being worn?
-
Safety glasses being worn?
-
Respirators used when required? Proper respirator documentation available?
-
Hearing protection being worn when required?
-
Traffic vests or high visibility clothing material being worn?
-
Safety Manager
-
Superintendent
Daily Site Progress Report
BLOCK 1 - 35
STRUCTURAL STEEL
-
SETTING OUT
-
COLUMS INSTALLATION
-
WELDING
-
SNAGGING AND TORQUING
-
PAINTING
-
REMIDIALS WORKS
SECONDARY STEEL
-
SECONDARY STEEL INSTALLATION
FACADE WORKS
-
SETTING OUT
-
BRACKET INSTALLATION
-
WALL PANELS INSTALLATION
-
ROOF PANELS INSTALLATION
-
CW -STICK WORK INSTALLATION
-
CW - GLAZING
-
LOUVERS INSTALLATIONS
-
FLASHINGS INSTALLATIONS
-
COPINGS INSTALLATION
BLOCK 2 - 35
STRUCTURAL STEEL
-
SETTING OUT
-
COLUMS INSTALLATION
-
WELDING
-
SNAGGING AND TORQUING
-
PAINTING
-
REMIDIALS WORKS
SECONDARY STEEL
-
SECONDARY STEEL INSTALLATION
FACADE WORKS
-
SETTING OUT
-
BRACKET INSTALLATION
-
WALL PANELS INSTALLATION
-
ROOF PANELS INSTALLATION
-
CW -STICK WORK INSTALLATION
-
CW - GLAZING
-
LOUVERS INSTALLATIONS
-
FLASHINGS INSTALLATIONS
-
COPINGS INSTALLATION
BLOCK 3 - 35
STRUCTURAL STEEL
-
SETTING OUT
-
COLUMS INSTALLATION
-
WELDING
-
SNAGGING AND TORQUING
-
PAINTING
-
REMIDIALS WORKS
SECONDARY STEEL
-
SECONDARY STEEL INSTALLATION
FACADE WORKS
-
SETTING OUT
-
BRACKET INSTALLATION
-
WALL PANELS INSTALLATION
-
ROOF PANELS INSTALLATION
-
CW -STICK WORK INSTALLATION
-
CW - GLAZING
-
LOUVERS INSTALLATIONS
-
FLASHINGS INSTALLATIONS
-
COPINGS INSTALLATION
BLOCK 4
STRUCTURAL STEEL
-
SETTING OUT
-
COLUMS INSTALLATION
-
WELDING
-
SNAGGING AND TORQUING
-
PAINTING
-
REMIDIALS WORKS
SECONDARY STEEL
-
SECONDARY STEEL INSTALLATION
FACADE WORKS
-
SETTING OUT
-
BRACKET INSTALLATION
-
WALL PANELS INSTALLATION
-
ROOF PANELS INSTALLATION
-
CW -STICK WORK INSTALLATION
-
CW - GLAZING
-
LOUVERS INSTALLATIONS
-
FLASHINGS INSTALLATIONS
-
COPINGS INSTALLATION
BLOCK 5
STRUCTURAL STEEL
-
SETTING OUT
-
COLUMS INSTALLATION
-
WELDING
-
SNAGGING AND TORQUING
-
PAINTING
-
REMIDIALS WORKS
SECONDARY STEEL
-
SECONDARY STEEL INSTALLATION
FACADE WORKS
-
SETTING OUT
-
BRACKET INSTALLATION
-
WALL PANELS INSTALLATION
-
ROOF PANELS INSTALLATION
-
CW -STICK WORK INSTALLATION
-
CW - GLAZING
-
LOUVERS INSTALLATIONS
-
FLASHINGS INSTALLATIONS
-
COPINGS INSTALLATION
BLOCK 6
STRUCTURAL STEEL
-
SETTING OUT
-
COLUMS INSTALLATION
-
WELDING
-
SNAGGING AND TORQUING
-
PAINTING
-
REMIDIALS WORKS
SECONDARY STEEL
-
SECONDARY STEEL INSTALLATION
FACADE WORKS
-
SETTING OUT
-
BRACKET INSTALLATION
-
WALL PANELS INSTALLATION
-
ROOF PANELS INSTALLATION
-
CW -STICK WORK INSTALLATION
-
CW - GLAZING
-
LOUVERS INSTALLATIONS
-
FLASHINGS INSTALLATIONS
-
COPINGS INSTALLATION
WAREHOUSE - 35
STRUCTURAL STEEL
-
SETTING OUT
-
COLUMS INSTALLATION
-
WELDING
-
SNAGGING AND TORQUING
-
PAINTING
-
REMIDIALS WORKS
SECONDARY STEEL
-
SECONDARY STEEL INSTALLATION
FACADE WORKS
-
SETTING OUT
-
BRACKET INSTALLATION
-
WALL PANELS INSTALLATION
-
ROOF PANELS INSTALLATION
-
CW -STICK WORK INSTALLATION
-
CW - GLAZING
-
LOUVERS INSTALLATIONS
-
FLASHINGS INSTALLATIONS
-
COPINGS INSTALLATION
DISPATCH BUILDING - 35
STRUCTURAL STEEL
-
SETTING OUT
-
COLUMS INSTALLATION
-
WELDING
-
SNAGGING AND TORQUING
-
PAINTING
-
REMIDIALS WORKS
SECONDARY STEEL
-
SECONDARY STEEL INSTALLATION
FACADE WORKS
-
SETTING OUT
-
BRACKET INSTALLATION
-
WALL PANELS INSTALLATION
-
ROOF PANELS INSTALLATION
-
CW -STICK WORK INSTALLATION
-
CW - GLAZING
-
LOUVERS INSTALLATIONS
-
FLASHINGS INSTALLATIONS
-
COPINGS INSTALLATION
CANOPY -35
STRUCTURAL STEEL
-
SETTING OUT
-
COLUMS INSTALLATION
-
WELDING
-
SNAGGING AND TORQUING
-
PAINTING
-
REMIDIALS WORKS
SECONDARY STEEL
-
SECONDARY STEEL INSTALLATION
FACADE WORKS
-
SETTING OUT
-
BRACKET INSTALLATION
-
WALL PANELS INSTALLATION
-
ROOF PANELS INSTALLATION
-
CW -STICK WORK INSTALLATION
-
CW - GLAZING
-
LOUVERS INSTALLATIONS
-
FLASHINGS INSTALLATIONS
-
COPINGS INSTALLATION
CHP Turbine building - 45
STRUCTURAL STEEL
-
SETTING OUT
-
COLUMS INSTALLATION
-
WELDING
-
SNAGGING AND TORQUING
-
PAINTING
-
REMIDIALS WORKS
SECONDARY STEEL
-
SECONDARY STEEL INSTALLATION
FACADE WORKS
-
SETTING OUT
-
BRACKET INSTALLATION
-
WALL PANELS INSTALLATION
-
ROOF PANELS INSTALLATION
-
CW -STICK WORK INSTALLATION
-
CW - GLAZING
-
LOUVERS INSTALLATIONS
-
FLASHINGS INSTALLATIONS
-
COPINGS INSTALLATION
STARCH BUILDING - 36
STRUCTURAL STEEL
-
SETTING OUT
-
COLUMS INSTALLATION
-
WELDING
-
SNAGGING AND TORQUING
-
PAINTING
-
REMIDIALS WORKS
SECONDARY STEEL
-
SECONDARY STEEL INSTALLATION
FACADE WORKS
-
SETTING OUT
-
BRACKET INSTALLATION
-
WALL PANELS INSTALLATION
-
ROOF PANELS INSTALLATION
-
CW -STICK WORK INSTALLATION
-
CW - GLAZING
-
LOUVERS INSTALLATIONS
-
FLASHINGS INSTALLATIONS
-
COPINGS INSTALLATION
INSTALLED STEEL TONAGE
-
INSTALLED STEEL SCHEDULE
Signaures
-
Report made by: Michael