Information
-
Location : Waitakere Fire
-
Inspected by
-
Conducted on
Pump
-
Pump being checked
-
Check inlet connection<br> - 50mm cam lock<br> - Strainer secure & clean
-
Check outlet connection - 41 male forestry connection
Coupling buffer& drive pins
-
Motor / pump clamp - operational
-
Main bearing - greased as required
-
Pump body - cleaned & drained
Engine
-
Base frame - is this secure?
-
Throttle linkage - Operational / full travel
-
Choke leaver - Operational / full travel
-
Fuel level (should be full)
-
Fuel tank - colour coded / labelled
-
Fuel system - cleaned fuel bowl / filter
-
Oil level - check engine oil
-
Spark plug - correct type & set / clean / secure
-
HT Lead - Check secure
-
Air filter- Clean & Secure
-
Muffler - Operational & secure
-
Rewind starter - extends 1 meter and returns
Suction Hoses
-
Hoses - no damage
-
Couplings - no damage<br> - coupling washers in place
-
Non return valve - Complete and operational
Accessories
-
Fuel can - Full, colour coded or labelled
-
Tool kit - complete
General Comments
-
DPRFO Notified of any faults
-
Any other notes