Title Page
-
Job Number
-
General Contractor
-
Conducted on
-
Project Manager
-
Temperature
-
Location In Building
-
Confirm MEP installation complete
-
Notes
-
Add media
-
Confirm backing does not overlap at ends
-
Notes
-
Add media
-
Confirm backing does not overlap strapping or MEP installations, etc.
-
Notes
-
Add media
-
confirm screws, or welding installed on backing at studs per plans and specs
-
Notes
-
Add media
-
Confirm notched backing does not touch MEP and dissimilar material in wall
-
Notes
-
Add media
-
Confirm all backing installed per plans, specs and drawings in all rooms and corridors
-
Notes
-
Add media
-
Confirm gauge of notched stud of track, and flat stock per plans and specs
-
Notes
-
Add media
-
Sign Off
-
Forman
-
Q.C. Sign Off
-
Comments