Title Page

  • Job Number

  • General Contractor

  • Conducted on

  • Project Manager

  • Temperature

  • Location In Building

  • Confirm MEP installation complete

  • Notes

  • Add media

  • Confirm backing does not overlap at ends

  • Notes

  • Add media

  • Confirm backing does not overlap strapping or MEP installations, etc.

  • Notes

  • Add media

  • confirm screws, or welding installed on backing at studs per plans and specs

  • Notes

  • Add media

  • Confirm notched backing does not touch MEP and dissimilar material in wall

  • Notes

  • Add media

  • Confirm all backing installed per plans, specs and drawings in all rooms and corridors

  • Notes

  • Add media

  • Confirm gauge of notched stud of track, and flat stock per plans and specs

  • Notes

  • Add media

  • Sign Off

  • Forman

  • Q.C. Sign Off

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.