Information
-
Description of Work
-
Job site number
-
Location
-
Superintendent
-
Foreman & Crew
-
Prepared by
-
Conducted on
1.0 - JSA
-
1.1 - Completed & Signed?
2.0 - PPE
-
2.1 - Crew wearing required PPE?
3.0 - Temporary Traffic Control
-
3.1 - Was Traffic Control set up by Rasic employees?
-
3.2 - If TTC was set up Rasic employees, was it set up in accordance with MUTCD and/or the Watch Manual?
4.0 - House Keeping
-
Does the job site have adequate House Keeping?
5.0 - Confined Space Entry
-
5.1 - Gas Monitor Calibrated?
-
5.2 - Log Book completed?
-
5.3 - Adequate Ventilation?
-
5.4 - Attendant present?
-
5.5 - Ladder?
-
5.6 - Manhole Guard?
6.0 - Energized Vaults (confined space cont.)
-
6.1 - FR donned?
-
6.2 - QEW on site?
-
6.3 - Temperature readings taken?
7.0 - Excavation, Trenching & Shoring
-
7.1 - Spoilage back 2’?
-
7.2 - Shoring in trench over 5’?
-
7.3 - Tabulate Data on site?
-
7.4 - Shoring per tabulated data?
-
7.5 - Ladder in trench 4' or deeper?
-
7.6 - Ladder secured?
-
7.7 - Gas Monitor in use and calibrated?
8.0 - Equipment Check List
-
8.1 - Ladders inspected and noted on JSA?
-
8.2 - Electrical cords inspected and in good condition?
-
8.3 - Power tools in good repair?
-
8.4 - Guards on appropriate tools and functional?
-
8.5 - Air Hoses secured with Whip Checks and/or Pins or Wire?
-
8.6 - Equipment inspection logs up to date?
9.0 - Rigging
-
9.1 - Chains/Cable Sling Certified/Tagged?
-
9.2 - Synthetic slings Certified/Tagged?
-
9.3 - Move plates with shovel/broom?
-
9.4 - Using Tag Lines to control lifted loads?
10.0 - Administrative
-
10.1 - IIPP on site?
-
10.2 - Required Permitting on Site?
-
10.3 - Utilities located and secured?
-
10.4 - Dig Alert ticket up to date?
-
10.5 - Heat Illness Prevention Plan updated and reviewed?
11.0 - Miscellaneous
-
11.1 - Wheel chocks used when needed?
-
11.2 - Additional PPE for specific tasks?
-
11.3 - Class 3 Vests donned at night?
-
11.4 - Back up alarms functional?
-
11.5 - Seat Belts worn by operators when operating?