Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
REPORT NO.
-
Enter Report No.
MATERIAL RECEIVED
1.0 - MATERIAL RECEIVED
-
1.1 Submittal Reference No.
-
1.2. Tag & System Description
-
1.3 Supplier / Manufacturer
-
1.4 Purchase Order Reference No.
-
Add photo - BOD
-
Add photo - packing status
-
Add photo - Unpacking Status
RECEIVING INSPECTION
2.0 - RECEIVING INSPECTION REQUIREMENTS
-
2.1 Have you review project specifications prior to inspection?
-
2.2 Material complies with contractural requirements
-
2.3 OS&D-Physical Condition of Material
-
2.4 Packaging
-
2.5 Make / Manufacturer are correct.
-
2.6 Identification/Marking as required per specifications
-
2.7 Material Certifications
-
2.8 Does inspection require Owner approval/signature?
3.0 - STORAGE AND MAINTENANCE REQUIREMENTS
-
3.1 Are there special offloading, handling or storage requirements (if so please explain).
-
Special Handling or Storage Requirements
4.0 - ADDITIONAL COMMENTS
-
4.1 Add additional comments here
5.0 - SIGNATURES
-
CONTRACTORS REPRESENTATIVE
-
OWNER / OWNER REPRESENTATIVE