Title Page

  • Job Number

  • Inspection Type

  • Client Name

  • Client Phone Number

  • Client Email

  • Warranty Site Manager

  • Building Address
  • Inspection Date

  • Trade Commencement Date

Items

    Item
  • Location

  • Type

  • Description

  • Description

  • Description

  • Description

  • Description

  • Description

  • Description

  • Description

  • Description

  • Description

  • Description

  • Description

  • Description

  • Description

  • Description

  • Description

  • Description

  • Description

  • Description

  • Description

  • Description

  • Description

Shower Leak Inspection

    Shower
  • Shower location

  • Is the hob height greater than 55mm?

  • Is there a niche?

  • Is the shower enclosure in adequate condition?

  • Flood test result?

  • Is the shower screen overhanging the hob by 5mm or greater?

  • Was the screen installed after the 7th of June 2021?

  • Shower screen installer to cover removal and reinstatement as per scope of works.

  • Spray test result?

  • Where did it fail?

Trade Booking

  • Trade booked

  • Select date

  • Trade booked

  • Select date

  • Trade booked

  • Select date

  • Trade booked

  • Select date

  • Trade booked

  • Select date

  • Trade booked

  • Select date

General Notes

    General Notes
  • Description

  • Warranty Reminders

Sign Off

  • I / we agree that the above list of items are to be completed as part of the 12 month warranty.

  • I/we agree that pets are the responsbility of the home owner and seperation is made at all times in the work area.

  • I/we agree that we will ensure the work area is accessible and safe for all tradespersons.

  • Action required?

  • Who was present during the inspection?

  • Attendee Name

  • Signature Required?

  • Attendee Signature

  • Warranty Site Manager Signature

  • Date Signed

Landscaping

  • Has the landscaping been completed?

  • Is a follow up required?

  • Please review CSIRO Foundation Maintenance and Footing Performance: A Homeowner's Guide

  • I / we as the Home Owner of the property understand our responsibility to ensure the landscaping around the property complies with the CSIRO Foundation Maintenance and Footing Performance Guidelines.

  • I / we as a home owner understand we must send photographic evidence to the Warranty Team once the improvements have been carried out.

    Email: Warranty@abngroup.com.au

    Failure to comply with the guidelines may impact the performance of the footing system and void your structural warranty.

  • I / we as the Home Owner understand that if landscaping is not carried out, frequent maintenance will be required to ensure appropriate conditions of the site remain.

  • Signature Required?

  • Client Signature

  • Warranty Site Manager Signature

  • Date Signed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.