Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • Where is actual location isolated to these works in building? i.e. lvl 1, 2, 3, 4, tenancy 4, cafe ground etc....

  • Have you read and agree to SWMS for HANDTOOLS

  • Have you read and agree to SWMS for LADDERS

  • Have you read and agree to SWMS PLUMBING INSTALLATIONS

  • Do you understand how to follow the ALLPRO REPLACEMENT OF VALVES PROCEDURE?

REPLACEMENT OF VALVES PROCEDURE

  • Have you rang building manager and be shown shutoff valves on the project?

  • Has building manager made area safe for tenants/ patrons and notified area?

  • Have you isolated the main water lines from area you are working on?

  • Have you tested area is isolated and water shutoff?

  • You have all drop sheets down and empty buckets for water leaks?

  • Building manager has cleaner/ temps on standby?

  • Proceed to do works and repeat

  • What level or area are you working in ? (every area needs new start work completed)

WORK AREA

  • Do you have a photo of the current maintenance water valve?

  • Was the valve shut off before beginning maintenance?

  • Were appropriate tools and PPE used during maintenance?

  • Is the new valve the same size and type as the old valve?

  • What is the serial number of the new maintenance water valve?

  • Finishing NOTES?

  • How have you left the area?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.