Title Page

  • Project Title

  • Location
  • Conducted on

  • Conducted by

  • INSTRUCTIONS

    1. Please answer "Yes", "No" or "N/A" on the questions below to verify if each item is compliant.
    2. Add Photos in "Images" and remarks in "Notes" of each question when necessarry.
    3. Add a Corrective Measure in "Action." Provide a description, assign to a member, set priority, and due date
    4. Complete the audit by providing a digital signature
    5. Share your report by exporting as PDF, Word, Excel or Web Link.

Records and Documentation by Consultant

  • Proper supervision records by Contractor Site Supervisor

  • Testing of material according to specification (e.g. pre-packed waterproofing screed)

  • Approval of method statement by Consultant

Material

  • Use of a correct type of waterproofing system under the Projects materials list and building specification

  • Use of a mechanical mixer (two-part system for cementitious waterproofing membrane)

Substrate Preparation

  • Substrate in sound & dry condition, clean and free from dust, foreign matter and obstructions

  • Moisture level is acceptable as per manufacturers requirements

  • Wall rendered flat and even

  • 45o mortar fillet to edge between floor and wall or pipes

  • Water stop angles installed at doors, hobs

  • All penetrations considered and sealed as required prior to application of membrane

Waterproofing Membrane Application

  • Application of 1st coat with a roller or brush (allow first coat to dry to touch)

  • Application of 2nd coat in perpendicular direction to the 1st coat

  • Corners and pipe properly coated with the aid of a brush

  • Upturn of at least 200 mm onto walls

  • Upturn of at least 50 mm onto pipes

  • Check that membrane has adhered firmly to substrate for its entirety.

  • No air entrapped in the membrane

  • Installed in accordance with the manufacturer’s recommendations.

  • Thickness according to manufacturer’s recommendation (use wet film thickness gauge for checking film thickness of membrane when it is still wet)

  • Proper protection (after completion cordoned off the areas till protective covering or screed has been laid)

Curing & Protective Screed

  • Adequate curing between 1st & 2nd coat application<br>(subject to weather condition)

  • Application of approved pre-packed waterproof screed to protect the waterproof membrane (to be done on the following day after the curing of 2nd coat)

  • Use of mechanical mixer & water measuring gauge

  • Adequate fall towards outlets

  • Minimum screed thickness = 15mm

  • Provision of screed with rough surface

Water test

  • A minimum depth of 10mm water flooding test for 24 hours within 1 month after application of waterproofing membrane and protective screed

Warranty for Complete System of Waterproofing System

  • The Contractor and the Specialist jointly provide warranty as per the Project specifications

Completion

  • Collect and attach all documentation, review records, test reports, conformance certificates for product & service, material & back to back warranties

  • Contractor's Supervisor Name & Signature

  • Auditor's Name & Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.