Information
-
MEP Job Number
-
Location
-
Principal Contractor
-
MEP Site Supervisors
-
Prepared by
-
Date of Audit
Default Section
1. - Safety Documentation
-
1.1 - Previous Inspection Records - Are these Present, Actioned and Filed with a close out form
-
Priority
-
1.2 - Watkins HSEQ files - Are these on site, in order, completed and available to all operatives.
-
Priority
-
1.3 - First Aid Provision - Is the First Aid box in the office, is it fully stocked and being managed?
-
Priority
-
1.4 - Watkins Sub Contractor Audit - Is there a current Sub Contractor order on Evision, for those working currently on site
-
Priority
-
1.5 - Watkins RAMS - Are these in place for all Watkins workplace activities currently being completed on site?
-
Priority
-
1.6 - Sub Contractor Rams - Do all previous and current Watkins Sub Contractors on site, have a copy of their RAMS, signed by the operative, with Signed Approval from the HSEQ Department Attached.
-
Priority
-
1.7 - Weekly Friday Pack - Has the most recent "Weekly Pack" been completed with relevant information attached
-
Priority
-
1.8 - COSHH Assessments - 1.) Are these present for substances in use and briefed to operatives. - 2.) Are substances stored in suitable locations as outlined in COSHH assessments
-
Priority
-
1.9 - HSEQ Notice Board - Is this displayed in a convenient location, with all relevant documents updated
-
Priority
2. - Site Conditions
-
2.1 - Welfare Facilities - Are these suitable and sufficient for the volume of operatives on site
-
Priority
-
2.2 - Cable management - Trailing leads and cables
-
Priority
-
2.3 - Access / Egress / Footpaths Clear and suitable around all the site
-
Priority
-
2.4 - Holes Voids & Trenches
-
Priority
-
2.5 - Lighting levels adequate - 1.) Walkways and Pedestrians routes. - 2.) Plots and Work areas
-
Priority
-
2.6 - Segregation of site Vehicles from Pedestrians with a current Traffic Management Plan in action
-
Priority
-
2.7 - Housekeeping - 1.) Watkins Plots and Work areas are tidy and clear. - 2.) Principal Contractors site is clear and tidy
-
Priority
3. - Electrical
-
3.1 - Electrical Safety Procedure: Is The Consumer Unit Live? (If yes go to question 3.2, if no mark as N/A)
-
Priority
-
3.2 - Safe Isolation Lockout Procedure - Has the Watkins Procedure been implemented (Padlock, Stickers and Signage) - If NO, contact HSEQ Department immediately.
-
Priority
4. - Storage & Materials
-
4.1 - Management of Watkins storage area and materials
-
Priority
-
4.2 Management of Principal Contractor's Storage and Materials
-
Priority
5. - Plant & Equipment
-
5.1 Working & Heights - As outlined in Watkins SSOW, is the working at heights equipment being used, suitable for the task in hand and been inspected on a 7 day period?
-
Priority
-
5.2 Cutting Stations - Are in good working order, and have functioning lights, extraction and accessories attached
-
Priority
-
5.3 - Rotating & Welding Machines - Are these in good working order and have. - 1.) Suitable Guards and Barriers attached. - 2.) Foot Pedal Activation. - 3.) Drip Trays or suitable COSHH control as outlined in RAMS. - 4.) Those using the machine are competent to do so. - 5.) Instruction Manuals are available to review. - 6.) PAT testing/Inspection/Maintenance is evident.
-
Priority
-
5.4 - LOLER - Any equipment under this Reg ( Strops / Slings / Pallet trucks ect.) have been examined and inspected with appropriate tagging/certification in place
-
Priority
-
5.5 - Principal Contractor Working At Heights protected? (Scaffold/Platforms/Lift Shafts)
-
Priority
-
5.6 - Watkins work equipment is being used as per manufacturers guidance, and those in operation trained to do so?
-
Priority
6. - Fire & Emergency
-
6.1 - Principal Contractor. - Fire Protection/Prevention Equipment suitably positioned across site, and emergency procedure's/fire plan is in place
-
Priority
-
6.2 - Watkins. - Fire Protection/Prevention Equipment. - 1.) Hot Works permit is being completed by operatives. - 2.) 2x Fire Extinguishers are in the working area. - 3.) Work areas are free from hazardous or Combustible Material
-
Priority
7. - Occupational Health & Safety
-
7.1 - Site - Noise - Suitable Control (Use the Noise Application)
-
Priority
-
7.2 - Watkins - Dust - Are those creating or working with dust, using the correct tool attachments and have suitable "Respiratory Protection Equipment" on, with valid "Face Fit" certificate in place
-
Priority
8. - Individual Behaviour Safety Assessment
-
Name of individual
-
Trade
-
Employment Status
- PAYE
- Sub-Contractor
- Agency
- Contractor
-
8.1 - Watkins Induction completed
-
Priority
-
8.2 - CSCS/ECE/JIB Skills Card available on site and relevant for trade
-
Priority
-
8.3 - Is The P.P.E Appropriate For the Task Being Carried Out
-
Priority
-
8.4 - Operative has signed RAMS and is working in accordance with them
-
Priority
-
8.5 - Has the operative got the relevant competencies for the task being completed? (Manual Handling, Face Fit, Abrasive Wheels, etc)
-
Priority
- ASAP
- 24 Hr
- 72 Hr
- Other
9. - High Risk Activities
-
9.1 - Are there any High Risk Activities currently being completed? (Roof works, Gas installation, Confined Spaces, etc)
-
Has HSEQ Department been notified?
-
Priority
-
9.2 Are there any future lifts planned? If Yes, when is this planned for?
-
Priority
Audit Information
Good Practice
-
Any Watkins operative, area or working procedure that shows good practice towards health and safety on site?
-
Information on the good practice witnessed.
-
Photo's of Good Practice
Any further issues
-
Further Issue. -
-
Priority
- ASAP
- 24 Hr
- 72 Hr
- Other
-
Watkins Supervisor
-
Watkins Project Engineer
-
I confirm that all matters requiring attention have been brought to the notice of, and discussed with the Site Supervisor/Foreman:-