Title Page
-
Conducted on
-
Prepared by
General information
-
Current date and time
-
Location
-
Inspector(s) onsite
- Brooke Muhlack
- Casey Wisness
- Scott Hunwardsen
- Chris Winkel
- Olsson Associates
-
Weather at the time of inspection.
-
Activities on site
- Grading
- Excavating
- Paving
- Seeding
- Staging
Type of Inspection
-
Please select type of inspection.
-
If post-precipitation, please list amount.
Phasing information
-
Which phase are we currently operating in?
- Phase 1A
- Phase 1B
- Phase 2
- Phase 3
- Phase 4
- Phase 5
- Phase 6
-
Which phases are currently disturbed?
- Phase 1A
- Phase 1B
- Phase 2
- Phase 3
- Phase 4
- Phase 5
- Phase 6
-
How many acres are approximately disturbed?
Phasing Stormwater inspection
-
Are there are discharges at the time of inspection?
-
Do you suspect any discharges occurred since the last inspection?
-
Are perimeter controls and sediment barriers (silt fences, wattles) installed, functional, and maintained?
-
Is sediment being controlled on site and not allowed onto public traveled streets?
-
Is trash/litter/recyclables properly stored and collected in appropriate areas?
-
Are construction materials (i.e. Baskets, pvc) stored outside of natural drainage areas?
-
Are nonstormwater discharges properly controlled onsite?
-
Are there areas disturbed going to be disturbed again within 14 calendar days?
-
If yes, please site which areas.
-
What best management practices are suggested for compliance in these areas?
- Erosion control blanket class 1C
- Erosion control blanket class 1D
- Silt fence
- Wattle barrier
- Temporary seeding
- Construction entrance
- Dozer tracking
- Permanent seeding
- Mulching
- Other
-
If "other" is selected, please list.
Staging/Topsoil Stockpile Areas
-
Is there visible runoff coming from the staging area?
-
Is trash/litter/recyclables properly stored and collected in appropriate areas?
-
Are vehicle and equipment fueling, cleaning, luring, and maintenance areas free of spills, leaks, or any other deleterious material?
-
Is secondary containment adequate, installed, and maintained around fuel tanks and drums?
-
If nonstormwater is collected on the staging site, is it properly controlled?
-
Is there seeding on the topsoil stockpile?
-
If any visible erosion is evident, are functional best management practices installed and functioning?
-
Are there suggested best management practices that could be installed to ensure compliance?
-
If yes, what are these best management practices?
- Erosion control blanket class 1C
- Erosion control blanket class 1D
- Silt fence
- Wattle barrier
- Temporary seeding
- Construction entrance
- Dozer tracking
- Permanent seeding
- Mulching
- Other
Signature
-
I fully understand that this document is an inspection required by our stormwater pollution prevention plan, and applicable local, state and federal permits. I comply that the information provided from me is true and done to the best of my ability.
-
Name
-
Add signature
-
Add signature
-
Date, time completed