Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. Personal Protective Equipment
-
1.1. Hard hats,safety glasses, being worn in accordance with company safety policy.
-
1.2 Proper clothing is being worn.
-
1.3. Necessary fall protection is being utilized.
-
1.4. Ear protection, gloves,etc. being worn if needed.
-
1.5. Respiratory protection worn and written program is in place to handle safety of employees.
-
1.6. Necessary training and safety documentation is on site with General Superintendent.
2. Hand and Power Tools
-
2.1. Hand and power tools being checked by competent person before daily start-up use.
-
2.2. All required guards are in place and being used properly.
-
2.3. Electrical cords to equipment are correct and in safe working condition.
-
2.5. Powder actuated tools are being used properly and stored correctly also.
-
2.6. Operator training current and on file with General Superintendent.
-
2.7. Lack of LOTO procedures for cleaning, servicing and maintenance?
-
2.8. Necessary training and safety documentation is on site with General Superintendent.
3. Scaffolding
-
3.1. Inspection of scaffolds completed by the Required Competent Person for the subcontractor before scaffold was placed in service.
-
3.2. Unsafe or incomplete scaffold?
-
3.3. All work levels are completely decked with the properly rated materials.
-
3.4. Incompatible scaffold components? Unlabelled or do not meet ASI Standards.
-
3.5. Safe Work Load (SWL) exceeded? (tools, stored materials, number of persons)
-
3.6.Proper mud sills and leveling jacks are in place and scaffolding is level.
-
3.7. Ladders in place for access and egress.
-
3.8. All the necessary fall protection is in place and installed correctly.
-
3.9. Necessary training and safety documentation is on site with General Superintendent.
4. Equipment Checklist
-
4.1. Unsafe or damaged equipment?
-
4.2. Loads lifted over persons, close proximity to obstacles incl. overhead power lines?
-
4.3. Lack of maintenance, testing and inspection?
-
4.4. Missing load lifting chart?
-
4.5. Lack of daily inspection protocol?
-
4.6. Unsafe or damaged lifting equipment, including ropes, slings, chains, hooks?
-
4.7. Lifting equipment unlabelled, does not meet ANSI standards?
-
4.8. Unlicensed operators?
-
4.9. Lack of LOTO procedures for cleaning, servicing and maintenance?
-
4.10. Safe lifting load or lifting equipment exceeded?
-
4.11. Necessary training and safety documentation is on site with General Superintendent.
5. Excavation and Trenching
-
5.1. Necessary barricades in place and visible.
-
5.2. Necessary shoring is in place and extends at least 18 inches above trench or excavation.
-
5.3. Necessary ladders are in place and at the correct locations.
-
5.4. Spoil piles are at least 2 feet away from edge of trench or excavation.
-
5.5. Necessary air sampling is being conducted at required locations and intervals.
-
5.6. Required Competent person is on site at all times while work is being conducted
-
5.7. Necessary training and safety documentation is on site with General Superintendent.
6. Ladders and Stairways
-
6.1. All ladders were inspected prior to start of work and are in working condition.
-
6.2. Unsafe positioning of ladders?
-
6.3. Ladders extend at least 3'above working landing and are properly secured to prevent falls.
-
6.4. Metal pans stairs are fully filled or have been placed out of service and barricaded.
-
6.5. Steps are provided at elevations greater than 19 inches.
-
6.6. Platforms with steps at a heights greater than 30 inches have necessary handrails in place.
-
6.7. All required guardrails or barricades are in place and at the required heights.
-
6.8. Necessary training and safety documentation is on site and with the General Superintendent.
7. Hazard Communication Standard (OSHA 1910.1200)
-
7.1. Written Hazard Communication program on site for each contractor working.
-
7.2. All containers with flammable and combustible materials stored are labeled. <br>
-
7.3. Secondary containment is in place on all storage tanks
-
7.4. Necessary training and safety documentation is on site with General Superintendent.
8. Chemical (storage)
-
8.1. Unsafe storage location? (e.g. flammables near ignition sources, spills could enter stormwater drains, etc)
-
8.2. Incompatible chemicals stored near each other?
-
8.3. Inadequate spill containment equipment?
-
8.4. Safety Data Sheets not accessible on site?
-
8.5. Lack of emergency procedures for injury/spills/fire etc?
-
8.6. Excessive quantities stored on site or in vehicles?
-
8.7. Insufficient ventilation?
-
8.8. Insufficient, or incorrect, PPE?
-
8.9. Unsuitable storage containers? (unlabeled or stored in food containers)
9. Stored Materials
-
9.1. All materials stored within required height limits.
-
9.2. All materials are protected from weather damage
-
9.3. Necessary blocking is in place at needed areas.
-
9.4. Necessary training and safety documentation is on site with General Superintendent.
10. Traffic Control
-
10.1. Lack of, or inadequate, Traffic Management Plan (TMP) in place?
-
10.2. Lack of training in TMP for all persons on site? <br>(contractors and visitors)
-
10.3. Inadequate controls for TMP? (physical barriers, bollards, speed limits, flashing lights, spotters, etc)
11. Electrical
-
11.1. All temporary power is GFCI protected.
-
11.2. All circuit panels are properly labeled as well as receptacles
-
11.3. Drop cords are three wire type with ground prong in place.
-
11.4. Lockout /tag out program in place if work task require it.
-
11.5. Temporary lighting in working condition.
-
11.6. Lighting circuits wired directly into electrical panels.
-
11.7. GFCI protection being checked daily for proper operation.
-
11.8. Necessary training and safety documentation is on site with General Superintendent.
12. Work Environment/Sanitation Facilities
-
12.1. Lack of/or inadequate amenities? (toilets, wash areas, lunch rooms, etc)
-
12.2. Insufficient lighting?
-
12.3. Inadequate housekeeping?
-
12.4. Lack of, or inadequate noise/ vibration control?
13. Fall Protection
-
13.1. Necessary fall protection in place as required and used correctly.
-
13.3. Elevators shaft protected with removable barricade.
-
13.4. All wall openings have guardrails in place.
-
13.5. Necessary toe boards in place were needed.
-
13.6. Areas with openings of 2" or greater have covers secured in place and marked indicating (Hole Do Not Remove)
-
13.7. Necessary training and safety documentation is on site with General Superintendent.
14. Fire Protection and Prevention.
-
14.1. Proper amount and type of fire extinguishers in required areas.
-
14.2. Daily and monthly inspections are being conducted as required.
-
14.3. Discharged extinguishers are replaced when found out of service.
-
14.4. All combustible and flammable materials are correctly stored.
-
14.5. Necessary hot work permits are in place and being monitored.
-
14.6. Necessary training and safety documentation is on site with General Superintendent.
15. General Housekeeping and Safety
-
15.1. Trash and debris is being properly disposed of on a daily basis.
-
15.2. Scrap lumber found with nails protruding (remove nails or bend over)
-
15.3. All retention pond are being kept clear of trash and debris.
15. Administrative Procedures
-
15.1. Lack of/or inadequate Site Safety Plan?
-
15.2. Failure to obtain permits (Council, EPA, WHS, also Hot Works, Confined Space etc)
-
15.3. Lack of, or inadequate, induction for workers, contractors, visitors?
-
15.4. Lack or, or inadequate, supervisory arrangements?
-
15.5. Lack of/or inadequate training, licenses, skills, experience?
-
15.6. Lack of/or inadequate Safe Work Method Statements (SWSM) for high- risk work?
-
15.7. Lack of, or inadequate system to review SWMS as needed?
-
15.8. Lack of/or inadequate incident notification procedures?
-
15.9. Lack of, or inadequate, routine inspections, monitoring, audits?
-
15.10. Lack of/or inadequate consultative arrangements?
Corrective Actions
-
Enter any corrective actions that will be undertaken
Sign Off
-
On site representative
-
Auditor's signature