Information
-
Customer Details
-
Site Name:
-
Document No.
-
Date:
-
Planned Works
- All Areas
- Access Roads
- Embankments
- Landscape Areas
- Building Externals
- Paths & Running Track
- Earthworks/Processing/Muckaway
- Topsoiling
- Foundations or Footings
- Land Drainage
- Pumps & Pipework
- Services & Ducting
- River Works
- Lake Works
- Preparation of Soil
- Seeding or Turfing
- Maintenance Works
General Conditions
-
Weather Conditions
- Thunder/Lightning
- Heavy Rain
- Overnight Rain
- Rain
- Light Rain
- Drizzle
- Showers
- Heavy Showers
- Mist
- Fog
- Cloudy
- Overcast
- Dull
- Broken Cloud
- Clear
- Sunny Periods
- Bright Sunshine
- Heavy Dew
- Sleet
- Snow
- Ice
- Frost
- Thaw
- Cold
- Freezing
- Seasonal
- Warm
- Hot
- Still
- Slight Breeze
- Breezy
- Windy
- Gales
- Stormy
-
Has weather affected todays planned work
-
Please confirm how
- Works abandoned
- Staff Sent home
- Unable to start planned works
- Unable to complete planned works
- Delayed start
- Short day
- Work area unsafe
- Access unsafe
- Area unworkable
- Access not possible
- Too cold for process
- Too wet for process
- Too dry for process
- Snow cover
- Frozen
- Water logged
- Flooded
- Too windy
- Work volume significantly reduced
-
Ground Conditions
- Baked or Dusty Dry
- Dry & Friable
- Reasonably Dry
- Workable
- Just Workable
- Barely Workable
- Soft
- Very Soft
- Damp or Wet
- Saturated
- Flooded
- Unable to be trafficked by Plant
- Unwalkable in places
- Frozen
- Snow covered
-
Basic Location
- All Areas
- Access Roads
- Embankments
- Landscape Areas
- Building Externals
- Paths & Running Track
- Earthworks/Processing/Muckaway
- Topsoiling
- Foundations or Footings
- Land Drainage
- Pumps & Pipework
- Services & Ducting
- River Works
- Lake Works
- Preparation of Soil
- Seeding or Turfing
- Maintenance Works
-
Specific Location/s
- Zone 1
- Zone 2
- Zone 3
- Zone 4
- Zone 6.1
- Zone 6.2
- Zone 7
- Zone 8
- Zone 9
- Zone A1
- Zone A2
- Zone B1
- Zone B2
- Zone C1
- Zone C2
- Zone C3
- Zone D1
- Zone D2
- Zone D3
- Zone D4
- Zone E1
- Zone E2
- Zone E3
- Zone G1
- Zone E4
- Zone G2
- Zone G3
- Zone H
- Zone L
- Road 1
- Road 2
- Road 3
- Road 4
- Road 5
- Road 6
- Road 7a
- Road 7b
Signoff
-
Reported by
-
Signature