Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Unit 8N

Unit 8N - At the time of inspection can you confirm whether or not the identified fire hose was in good condition and fully functioning?

  • 8N01 - Roller Shutter Door

  • 8N02 - Unit 8N Platform

  • 8N03 - Unit 8N Platform

  • 8N04 - Unit 8N Ladder

  • 8N05 - Unit 8N Shredder 2

Fire Exits / Escape Routes

  • 8N01

  • 8N02

  • 8N03

Cross Warp Unit 8

Cross Wrap - At the time of inspection can you confirm whether or not the identified fire hose was in good condition and fully functioning?

  • CR801 - Cross Wrap Unit 8 Fire Exit

  • CR802 - Cross Wrap Unit 8 Roller Doors

Fire Exits / Escape Routes

  • CR801

Unit 8 South

Unit 8S- At the time of inspection can you confirm whether or not the identified fire hose was in good condition and fully functioning?

  • 8S01 - Yellow Fencing

  • 8S02 - Unit 8S Platform

Fire Exits / Escape Routes

  • 8S01

8 SOUTH GROUND SUPPRESSION PUMP

  • Does the pump self test ok

undefined

  • undefined

Unit 9

Unit 9 - At the time of inspection can you confirm whether or not the identified fire hose was in good condition and fully functioning?

  • 902 - Bag splitter rear wall Unit 9

9B01 side wall to 8S

  • 901 - Internal wall tunnel Exit Unit 9

  • 9B02 - Unit 9B Near Control Panel

Fire Exits / Escape Routes

  • 901

  • 902

  • 9B01

Unit 2

Unit 2- At the time of inspection can you confirm whether or not the identified fire hose was in good condition and fully functioning?

  • 2.01 - Unit 2 Rear Fire Exit

  • 2.02 - Unit 2 Side Fire Exit

  • 2.03 - Unit 2 Tipping Floor Entrance

  • 2.04 - Unit 2 Cross Wrap Fence

Fire Exits / Escape Routes

  • 2.01

  • 2.02

  • 2.03

Unit 11

Unit 11 - At the time of inspection can you confirm whether or not the identified fire hose was in good condition and fully functioning?

  • 11.01 - Unit 11 Bale Storage Area

  • 11.02 - Unit 11 Shredders

  • 11.03 - Unit 11 Fire Exit

Fire Exits / Escape Routes

  • 11.01

  • 11.02

PRF

PRF - At the time of inspection can you confirm whether or not the identified fire hose was in good condition and fully functioning?

  • PRF01 - MRF RHS Tipping Floor

  • PRF02 - MRF Baler

  • PRF03 - MRF Side Fire Exit

  • PRF04 - Rear Wall Under Stairs

  • PRF05 - Rear Wall LHS

Fire Exits / Escape Routes

  • PRF01

  • PRF02

  • PRF03

Unit 5

Unit 5 - At the time of inspection can you confirm whether or not the identified fire hose was in good condition and fully functioning?

  • 501 - Unit 5 Shredder

  • 502 - Unit 5 Blue Bay Wall

  • 503 - Unit 5 Trommel

  • 504 - Unit 5 Trommel

  • 505 - Unit 5 Westeria

  • 5B01 - Unit 5B Baler

  • 5B02 - Unit 5B Shredders

  • 5B03 - Unit 5B FIre Exit

Fire Exits / Escape Routes

  • 5.01

  • 5.02

  • 5.03

  • 5B01

  • 5B02

8South Ground suppression pump

  • Does the pump self test ok

Unit 5 Cross Wrap

At the time of inspection can you confirm whether or not the identified fire hose was in good condition and fully functioning?

  • CR501 - Unit 5 Cross Wrap

Fire Exits / Escape Routes

  • CR501

  • CR502

Plaster Board

Fire Exits / Escape Routes

  • PB01 (7)

  • PB02 (7)

  • PB03 (3)

  • PB04 (3)

Unit 9 Pump House

  • Are all valves secured in the appropraite open/shut positions?

  • Have the ball valves been checked?

  • Are the storage tanks full?

  • Jockey Pump - Cut in pressure

  • Electric Pump - Cut in pressure

  • Electric Pump - Closed head pressure

  • Electric Pump - Auto start Ok?

  • Electric Pump - Manual start Ok?

  • Pump House - Temperature before test

  • Pump House - Temperature after test

  • Are the remove alarm indicators functioning properly?

  • Final Checks - All valves secured in correct position?

  • Alarm re-set and signalling online?

Unit 6 Pump House

  • Are all valves secured in the appropraite open/shut positions?

  • Have the ball valves been checked?

  • Are the storage tanks full?

  • Jockey Pump - Cut in pressure

  • Electric Pump - Cut in pressure

  • Electric Pump - Closed head pressure

  • Electric Pump - Auto start Ok?

  • Electric Pump - Manual start Ok?

  • Pump House - Temperature before test

  • Pump House - Temperature after test

  • Are the remove alarm indicators functioning properly?

  • Final Checks - All valves secured in correct position?

  • Alarm re-set and signalling online?

Unit 1 Pump House

  • Are all valves secured in the appropraite open/shut positions?

  • Have the ball valves been checked?

  • Are the storage tanks full?

  • Jockey Pump - Cut in pressure

  • Electric Pump - Cut in pressure

  • Electric Pump - Closed head pressure

  • Electric Pump - Auto start Ok?

  • Electric Pump - Manual start Ok?

  • Pump House - Temperature before test

  • Pump House - Temperature after test

  • Are the remove alarm indicators functioning properly?

  • Final Checks - All valves secured in correct position?

  • Alarm re-set and signalling online?

Unit 1 Fire Shield Panel

  • Can you confirm that the panels D & E are on line with no faults present

  • Can you confirm that the panels A & B & C are on line with no faults present

Unit 1 Foam Trolley 1

  • Can you confirm that the foam trolley is connected the the water supply conection

  • Can you confirm that the Foam concentrate is at the required level

  • can you confirm that the attached hoses are in good order

Unit 1 Foam Trolley 2

  • Can you confirm that the foam trolley is connected to the water connection

  • Can you confirm that the Foam concentrate is at the required level

  • Can you confirm that the attached hoses are in good order

Unit 1 Hose reels

  • Mezzanine floor Hose Reel 1

  • Rear tipping Floor Hose Reel

  • Compressor wall Hose Reel

  • Front Tipping floor Hose Reel

Unit 1A Hose Reels

  • Fire Exit into unit 1B Hose Reel

  • Shredder Hose Reel LHS

  • Front Fire Exit Hose Reel

Unit 1 A Foam Trolley 1

  • Can you confirm that the Foam trolley is connected to the water connection

  • Can you confirm that the Foam concentrate is at the required level

  • Can you confirm that the attached hoses are in good order

Unit 1A Pump House

  • Are all valves secured in the appropraite open/shut positions?

  • Have the ball valves been checked?

  • Are the storage tanks full?

  • Jockey Pump - Cut in pressure

  • Electric Pump - Cut in pressure

  • Electric Pump - Closed head pressure

  • Electric Pump - Auto start Ok?

  • Electric Pump - Manual start Ok?

  • Pump House - Temperature before test

  • Pump House - Temperature after test

  • Are the remove alarm indicators functioning properly?

  • Final Checks - All valves secured in correct position?

  • Alarm re-set and signalling online?

  • Is Unit 1A Komet fire panel live with no faults showing?

  • Is unit 1A Shredder fire panel live with no faults showing?

Unit 1B Hose Reels

  • Fire Exit Hose Reel

  • Front tipping Floor Hose Reel

Unit 1B Sprinkler System

  • Can you confirm that the sprinkler system is live?

  • Can you confirm that the water storage tank is full?

New MRF - Pump House

  • Are all valves secured in the appropraite open/shut positions?

  • Have the ball valves been checked?

  • Are the storage tanks full?

  • Jockey Pump - Cut in pressure

  • Electric Pump - Cut in pressure

  • Electric Pump - Closed head pressure

  • Electric Pump - Auto start Ok?

  • Electric Pump - Manual start Ok?

  • Pump House - Temperature before test

  • Pump House - Temperature after test

  • Are the remove alarm indicators functioning properly?

  • Final Checks - All valves secured in correct position?

  • Alarm re-set and signalling online?

New MRF

New MRF - At the time of inspection can you confirm whether or not the identified fire hose was in good condition and fully functioning?

  • NM1 - Tunnel Wall with unit 9

  • NM2 - Bag Splitter

  • NM3 - Fire Escape welfare exit

  • NM 4 - Residue Bay Rear tipping floor

  • Mezzanine floor Welfare stairs

Mezzanine Floor Ballistics end

Workshop

Workshop - At the time of inspection can you confirm whether or not the identified fire hose was in good condition and fully functioning?

  • WS01 - Workshop Mobile Plant Welding Bay

  • WS02 - Workshop Mobile Plant Far Wall

  • WS03 - Maintenance Workshop Near Fire Exit

Fire Exits / Escape Routes

  • WS01

  • WS02

  • WS03

  • WS04

  • WS05

Hydrants

At the time of inspection can you confirm whether or not the identified hydrants were in good condition and fully functioning?

  • Unit 1 corner crossing point

  • Unit 1A Tipping floor RHS

  • Unit 9 Rear Welfare area

  • Unit 7/8

  • Unit 5B Compressor area

  • Unit 3

Call Point Testing

  • Please state which numer call point has been tested this week

  • Have any defects been identified?

Signature

  • I am hereby signing to confirm all statements made above are correct at the time of inspection.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.