Information
-
Project 项目
-
Conducted on 编写日期/时间
-
Document No. 文件编号
-
Prepared by 编制人
-
Location 位置
Site Details 工地信息
-
Project / site Name 项目/ 工地 名称:
-
本报告模板供各工地质量员,质量主管使用,检查并评估各质量控制项是否符合要求,如有不符合项,用图片,视频和简短文件加以备注
Current site installation status 本周工地安装进度情况
-
Current site activity 本周安装作业内容
-
Photographs 进度照片
Incoming material 来货情况
-
Do you wish to report incoming material condition on this report?<br> 本报告是否包含来货情况
-
Material quality confirm to order<br>来货各质量指标符合订单要求
-
Packing as per requirement<br>包装符合要求
-
Properly storage<br>工地存放合理得当
In process quality control 制程质量控制
-
Cast-in / Bracket installation at this week?<br>本周作业是否包括埋件及牛腿安装?
-
Cast-in at correct position to true grid reference<br>埋件位置符合轴线图要求
-
Cast-in at correct position to slab reduced level<br>埋件垂直标高符合要求
-
Floor bracket in correct orientation<br>地台牛腿安装方向正确,无偏斜
-
Shimming do not exceed 10mm thick between concrete and bracket<br>牛腿和混凝土之间放置的垫片厚度不超过10mm
-
Serrated washers are orientated correctly<br>锯齿垫片正确咬合,定位
-
Spring washer are installed<br>弹垫安装,无遗漏
-
Min of 3 threads are above nut<br>螺栓紧固后,螺母距螺杆头部至少露3牙
-
Steel structure installation at this week?<br>本周作业是否包括结构钢件安装?
-
Steel structure installation as per drawing<br>安装符合图纸节点要求
-
Welding as per detail drawing<br>焊接符合节点图要求
-
Slag removed, weld primed as specified<br>焊渣清除,焊接处按要求做防护
-
Bolts, nuts and washers installed properly<br>螺栓,螺母及垫圈正确安装
-
Stick wall installation at this week<br>本周作业是否包括框架幕墙安装
-
Alum frame installed at right position<br>铝框架安装在正确位置
-
Sealant applied properly at transom / mullion join area<br>框架料连接位置防水胶施打正确
-
Glass setting block correct size, right position<br>玻璃垫块规格符合要求,放置位置正确
-
Glass in correct size and placed right side outward<br>玻璃安装室内外面正确,尺寸正确
-
Sealant applied properly<br>硅胶施打合格
-
Accessories installed correctly<br>配件正确安装
-
Panel installed at this week<br>本周作业是否包括单元板安装
-
Generally panel join gap in alignment<br>单元接缝对齐,符合要求<br>
-
Gutter join sleeve installed properly and correctly sealed<br>顶横料过桥安装合格,防水胶施打正确
-
4-way join properly sealed and caulked<br>4向交叉点防水胶施打合格,充分固化
-
Bracket properly fixed, panel in the right level<br>牛腿固定合格,单元标高符合要求
-
No visible scratch or damage to coating extrusion and glass<br>喷涂型材和玻璃无目视划伤或损伤<br>
-
External cladding installed at this week<br>本周作业是否包括外墙包板安装
-
Sub-frame installed properly<br>附框安装正确,误差符合公差要求
-
Cladding surface finishing as per requirements<br>面板表面处理符合要求
-
Panel free from scratches/ dent at 3m<br>板片3米间距无目视划伤,凹坑等缺陷
-
Alignment checked to tolerance<br>接缝齐平,进出符合公差要求
-
Sealant applied properly<br>硅胶施打符合要求
-
Canopy / skylight installed at this week<br>本周作业是否包括雨棚,天窗安装
-
Sub-frame installed properly<br>附框安装正确
-
Surface finishing as per requirements<br>表面处理符合要求
-
Panel free from scratched / deformation at 3m<br>板片3米间距无目视划伤,变形等缺陷
-
Alignment checked to tolerance<br>接缝齐平,进出符合公差要求
-
Sealant applied properly<br>硅胶施打符合要求
-
Door panel installed this week?<br>本周作业内容是否包括门单元安装?
-
Door panel installed correctly<br>门单元安装正确,误差符合要求
-
Operation acceptable<br>运行顺畅,功能合乎要求
-
Hardware installed as specified<br>五金件正确安装
-
Panel free from scratches / dent at 3 m<br>单元3米间距无目视划伤,凹坑等缺陷
-
Flashing / interfaces/ silicone complete<br>档板,内饰面及防水符合要求
-
Pelmet, sills & side jambs installed this week?<br>本周作业是否包括窗帘盒,窗台板及收口料安装?
-
Installed at correct position and level<br>材料安装位置,水平符合要求
-
No severs scratch and damage to material<br>材料无严重划伤等缺陷
-
Fire safing installed this week?<br>本周作业是否包括防火层安装
-
Fire safing support installed properly<br>防火封堵底部托板正确安装
-
Fire safing support cleared of debris<br>防火封堵托板上的废渣清除干净
-
Safing insulation type as specification<br>防火棉规格符合要求
-
Fire safing material installed sufficiently<br>防火材料安装密实,符合要求
Field test 现场测试
-
Field water test performed this week?<br>本周是否有进行现场淋水测试?
-
Testing area 测试区域
-
Any water leakage ?<br>有无漏水?
-
Embed test performed this week?<br>本周是否有进行预埋件测试?
-
Testing location 测试位置
-
Pass the test?<br>测试通过?
-
Post-fix anchor testing this week?<br>本周是否有进行后补锚栓测试?
-
Testing location 测试位置
-
Pass the test?<br>测试 通过?
-
Site gutter test this week?<br>本周是否有进行现场排水槽防漏水测试
-
Test area 测试区域
-
Pass the test?<br>测试通过?
-
Lightning protection testing this week?<br>本周是否有进行避雷装置测试?
-
Test area 测试区域
-
Pass the test?<br>测试通过?
-
Weld test this week?<br>本周是否有进行焊接试验<br>
-
Test location 测试位置
-
Pass the test?<br>测试通过?
-
Any other test performed on site this week<br>本周现场是否有进行其他测试
-
Describe test item and result 简述测试项及测试结果
Site Quality problem Founding 工地质量问题发现
-
Quality issue
质量问题
Issue
-
Description 描述
-
Correct action 处理意见
-
Photo 图片
General Comments 总结意见
-
Any further comments or recommendations ? 进一步意见或建议
-
Add any additional relevant photos
添加其他相关照片
photo
-
Description 描述
-
photo 图片
Sign Off 签名
-
Name & Signature of PQM 项目质量经理(签名)
-
Name & Signature of PM 项目经理(签名)