Information

  • Title

  • Contract

  • Conducted on

  • Carried out by

  • Location

Previous Inspection

Previous Inspection

  • (1) Actions closed from previous inspection?

  • Enter date of previous inspection

  • Who was responsible?

  • Responsible person informed?

Docs, Facilities & Interfaces

Docs, Comms, Facilities & Interfaces

  • (2) Documentation checked (registers, records, sub-contractor, policies etc)

  • Actionee

  • Timescale

  • (3) Co-ordination of SHE (meetings etc)

  • (4) Client Interface re: SHE

  • (5) Training/Competency/Induction/TBTs

  • (6) Welfare arrangements

  • (7) First Aid including defibrillators

  • (8) Protecting the public / corporate image

  • (9) House keeping

  • (10) Protective clothing

  • (11) Risk Assessments/Method Statements/Point of Work RA

  • (12) Permits - Control & Coordinated, Adequate & Used

  • (13) Relevant isolations in place and controlled

  • (14) Has the appropriate process/activity specific documentation been completed correctly, e.g. Legionella docs?

  • (15) communication of SHE Risks & Controls

Emergencies & Storage

(16) Emergency Arrangements

  • >Fire?

  • >Safety?

  • >Health Monitoring?

  • >Environmental?

(17) Storage

  • >Fuels/Gases?

  • >COSHH?

  • >Other?

Working at Height, Confined Space, Excavations

  • (18)i Ladders?

  • (18)ii Mitigating measures?

  • (19) Confined Spaces

  • (20) Excavations

  • (21) Quick Hitch - Competency

  • (22) Scaffolds

  • (23) Lifting equipment and operations

  • (24) Powered access equipment

Electricity, PAT, Isolations

  • (26) Portable tools (inc PAT)

  • (27) Electricity

  • (28) Relevant Isolation in place & controlled

Vehicles, TM, Plant

  • (25) Vehicles/vehicle movements

  • (29) Traffic management (inc mud on road)

  • (30) Plant & machinery

  • (31) Company equipment in good order (inc vehicles)

Handling, Noise, Vibration

  • (32) Manual handling

  • (33) Noise & vibration: Occupational

Environmental

  • (34) Hazardous substances

  • (35)i Waste - Skips

  • (35)ii Waste - transfer notes correct/complete

  • (36)i Water Management - Dewatering systems

  • (36)ii Water Management - Discharges

  • >Dust

  • >Ecology: protection of plants, animals & designated sites

  • >Designated concrete washout

  • >Spill kits in place

Operative Engagement

  • Name of operative

  • Employer

  • Operation being carried out at the time

  • Mandatory PPE & task specific PPE used correctly?

  • RAMS in place for operation?

  • Enter RAMS reference

  • STOP the operation immediately. Inform the Costain Package Manager and Subcontract Supervisor

  • Select Costain Staff Informed

RAMS & Sign

  • RAMS/Permits etc checked (list reference number of documents)

  • Details

  • Responsible person

  • Please print & sign on completion of the inspection

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.