Information

  • Audit No.

  • Audit Title

  • Subcontractor Name:

  • Conducted on

  • Auditor

  • Area of Audit

0-50% = Stop work. ― 51-74% = Correct with 48 hours. ― 75-84% = Correct within an agreed time frame (max 72 hours). ― 85-94% = Support performance. ― 95-100% = Congratulate performance.

  • Facilities conditions/equipment/toilets/water: clean, safe, secure and tidy?

  • Traffic control: signs/clothing/certified/ licensed?

  • Protective clothing: equipment as required, maintained, available and being worn?

  • Fire fighting equipment: secure, available and current certification?

  • Electrical equipment: tested and tagged, suitable for task and safe?

  • Plant: (machinery, trucks etc.) - pre-inspection, licensed, certified, good condition?

  • Hazardous substances: storage, handling, use, labelled, MSDS available?

  • Dewatering and drainage system(s): inspected, controlled and maintained?

  • Materials storage: location, safe and suitable?

  • First aid equipment: Is complete, available and correct?

  • Perimeter protection/false work/over water: inspected, suitable, controlled?

  • Excavation design and support system: equipment certified, suitable, safe and secure?

  • Emergency procedure: in place, understood by all staff, displayed?

  • Access and egress: suitable, safe and secure to all areas?

  • Welding and gas cutting equipment: secure, correct set-up and safe to use?

  • Daily hazard ID : Available, current and suitable?

  • Permits (isolation/confined space): appropriate, complete in full, sign-off obtained?

  • Communication system: type, available, working and appropriate for the area?

  • Training: subcontractors employees competent for the task?

  • Workplace environment (noise, dust, mist, fumes): inspected, tested, and recorded?

  • Scaffolding: suitable, design for working platforms, correct set-up, safe and secure?

  • Tunnel entry: trained, inducted, controlled and safe for entry?

  • Crane/rigging operations: temp works, equipment tagged, correct and safe?

  • Elevated work platforms: harnesses, set-up, operations correct and safe?

  • Health and safety information: notice boards, displayed and current?

  • Working at height requirements: harnesses, attachment points, lines, correct, safe?

  • Compressed air operations: secure, moused, correct and safe?

Observations

  • What was observed / how will it be rectified / who is responsible / due date?

  • What was observed / how will it be rectified / who is responsible / due date?

  • What was observed / how will it be rectified / who is responsible / due date?

  • What was observed / how will it be rectified / who is responsible / due date?

  • What was observed / how will it be rectified / who is responsible / due date?

  • What was observed / how will it be rectified / who is responsible / due date?

  • What was observed / how will it be rectified / who is responsible / due date?

  • What was observed / how will it be rectified / who is responsible / due date?

  • What was observed / how will it be rectified / who is responsible / due date?

  • What was observed / how will it be rectified / who is responsible / due date?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.