Information
-
Document No.
-
Inspection Title
-
Client / Site
-
Conducted on
-
Personnel in attendance
1.0 Documents and Site Management Requirements
-
1.1 Have all corrective actions from previous inspections been closed out?
-
1.2 Is a Construction Phase Plan available for the site and are amendments being made during construction where applicable?
-
1.3 Is there evidence that the CPP is being communicated to site personnel?
-
1.4 Are Risk Assessments and Method Statements (RAMS) available for activities being undertaken? List main activities.
-
1.5 Are processes in place for accidents and incident reporting and recording?
-
1.6 Does the site have displayed/available the following:
-
F10
-
HASAW Notice
-
Emergency Contact Details
-
Employers Liability Insurance Certificate
-
Sign In/Out Book
-
1.7 Have all employees and visitors signed In and Out of site?
-
1.8 Is there a suitably qualified Site Manager present on site? Provide Name and qualifications:
-
1.9 Have there been changes made to the site management team during the construction phase at all, if so give reason?
-
1.10 Is there evidence of management and checks of contractors skills, knowledge and experience?
-
1.11 Are regular Principle Contractor and Sub Contractor Coordination meetings carried out?
-
1.12 Is there evidence that regular consultation between PC and Sub Contractors in promoting, checking and maintaining H&S control measures is in place?
2.0 Design Risk Management
-
2.1 Is the Site Manager in possession of the Design Risk Register/Design Risk Assessment issued by Principle Designers?
-
2.2 Is there any on-going or planned sub contractor design, including temporary works?
-
2.3 Has the details of any Principle Contractor or Sub Contractor development been forwarded to the Principle Designer, e.g. temporary works, specifications of materials.
-
2.4 Are there any Design Risk management issues?
3.0 Housekeeping and Site Layout
-
3.1 Are all access areas clear and adequate width?
-
3.2 Are all safety signs clear and appropriate for activities being undertaken?
-
3.3 Is the site clean and well maintained?
-
3.4 Are tools and equipments put away after use?
-
3.5 Are construction materials adequately stored?
-
3.6 Is the site secure to prevent unauthorised access?
-
3.7 When in use are mobile generators adequately ventilated and fuelled?
4.0 First Aid
-
4.1 Are approved First Aiders easily identified and correct ratio for site. List First Aiders.
-
4.2 Is an adequate first aid kit and eye wash for the activity being undertaken on site?
-
4.3 Is the First Aid box well stocked, in date and prominently displayed?
5.0 Welfare and Amenities
-
5.1 Have adequate toilets, washing and drying facilities been provided?
-
5.2 Is a seating area with tables available for employees to take a meal break?
-
5.3 If required are ladies toilets available for use?
-
5.4 Can all toilets be flushed and are there arrangements in place for emptying/replacing?
-
5.5 Is adequate heating and lighting provided for use in relation to seasons?
-
4.6 Are the welfare facilities been kept clean?
-
5.7 Is there a supply of drinking water ( hot & cold ) on site?
-
5.8 Are there facilities for drying clothing and getting changed?
6.0 Noise
-
6.1 Have noisy processes and tasks been identified in RAMS and daily Risk Assessments?
-
6.2 Are there effective control measures in place to reduce exposure to noise?
-
6.3 Is PPE provided/available and is it being used correctly?
7.0 Manual Handling
-
7.1 Are manual handling activities being carried out correctly by site personnel?
8.0 Control of Substances Harmful to Health - COSHH
-
8.1 Are all substances labelled with product name, risks and safety phrase?
-
8.2 Is a COSHH register maintained and filled in correctly?
-
8.3 Are COSHH Assessments being conducted and recorded?
-
8.4 Are substances being handled in accordance with the RA and exposure levels controlled?
-
8.5 Are hazardous substances stored correctly?
9.0 Fire Prevention and Protection
-
9.1 Is there appropriate and clearly marked fire fighting equipment on site?
-
9.2 Is the fire fighting equipment fit for task? Tested and in date?
-
9.3 Is there a designated fire assembly point clearly marked on site?
-
9.4 Are designed smoking areas identified and aware to the workforce?
-
9.5 Is the fire alarm sufficient for the site conditions and can it be heard throughout the site?
-
9.6 Is the Fire & Emergency Action Plan available on site?
-
9.7 Are escape route clearly marked, safe and unobstructed?
10.0 Underground Services
-
10.1 Is there evidence that underground services information is in use on site?
-
10.2 Is the CAT scanner and Genny approved for use and within calibration date?
-
10.3 Is the CAT and Genny user competent and current?
-
10.4 Is there a signed and correctly used 'permit to dig' in place?
-
10.5 Have all underground services been identified and marked up correctly?
11.0 Excavations and Trenching
-
11.1 Where applicable are all underground services isolated?
-
11.2 Has ground stability been checked and control measures implemented?
-
11.3 Are barriers in place to prevent falling into excavations?
-
11.4 Is the shoring appropriate to the activity being undertaken?
-
11.5 Has adequate and suitable access and egress been provided
-
11.6 If ladders are provided, are they erected and secured correctly and in date and tagged
-
11.7 Has suitable edge protection been provided for excavations?
12.0 Concreting
-
12.1 Has formwork been constructed as per design?
-
12.2 Are weather conditions appropriate for concrete activities?
-
12.3 Is there suitable and appropriate access and egress for concrete delivery?
-
12.4 Has a suitable concrete washout area been provided?
-
12.5 Is the correct PPE issued and in use during concrete activities?
13.0 Scaffolding, Working Platforms & Working at Heights
-
13.1 Are scaff-tags in place and in date with 7 day inspections completed
-
13.2 Is there safe access & egress to platforms including handrails & toe boards?
-
13.3 Is the area cordoned off to prevent persons walking under the platform?
-
13.4 Are all employees on platform using the correct PPE and are clipped on?
-
13.5 Is working at Height carried out in a safe manner and in compliance with the safe system of work?
-
13.6 Are all openings and voids protected or guarded?
-
13.7 Is all access equipment in a safe and efficient condition, being used correctly and for it's intended purpose?
-
13.8 Is there evidence of access equipment being inspected and checked?
14.0 Plant and Equipment
-
14.1 Is the plant in use suitably maintained and fit for purpose?
-
14.2 Is the operator of the plant a competent person?
-
14.3 Are warning alarms and lights fitted and in working order?
-
14.4 Is a competent banks man used during reversing operations and blindsides?
-
14.5 When not in use are ignition keys removed and vehicle secured?
-
14.6 Are parking and movements in accordance with site traffic plan?
-
14.7 Are fitted fire extinguishers in date and suitable?
-
14.8 Are drip trays in use under static plant and equipment?
-
14.9 Are generators correctly earthed or RCD protected?
-
14.10 Are power/hand tools safe, appropriate, well maintained and used correctly?
15.0 Portable Electric Equipment
-
15.1 Is there evidence of Portable Appliance Testing (PAT)?
-
15.2 Is all portable electrical equipment operated at low voltage ( 110v )?
-
15.3 Is all portable electrical equipment tagged to show date of next inspection?
16.0 Traffic Management
-
16.1 Is the traffic management plan in accordance with New Roads and Street act (NRSWA)?<br>
-
16.2 Is all signage serviceable and suitable for the intended task?
-
16.3 Are protection arrangements in place suitable?
-
16.4 Are all employees adhering to the traffic management plan?
17.0 Climate
-
17.1 Have climate conditions been considered and control measures in place?
-
17.2 As adequate PPE been issued and used correctly?
18.0 Lifting Equipment & Lifting Accessories
-
18.1 Is all lifting equipment on site certified and in date?
-
18.2 Are all lifting accessories certified and in date?
-
18.3 Are all lifting accessories displaying correct tags?
-
18.4 Are all lifting activities been carried out on stable ground?
-
18.5 Is there an appropriate Lifting Plan in place for all lifting activities?
19.0 Training & Induction
-
19.1 Are all employees and visitors to site inducted and signed onto record sheets?
-
19.2 Are briefings and toolbox talks being carried out and recorded?
-
19.3 Are all employees' competency records available on site?
20.0 Behaviour & Attitude
-
20.1 Was a positive H&S attitude observed during inspection?
-
20.2 Are all the employees displaying positive working practices?
-
20.3 Are all employees aware of the hazards involved and the emergency procedures?
21.0 Personal Protective Equipment (PPE)
-
21.1 Are employees wearing the minimum expected PPE?
-
21.2 Is specific to task PPE ( as stated in RAMS) available and in use?
-
21.3 Is the condition of PPE satisfactory?
22.0 Incident Reporting
-
22.1 Have all incidents, accidents and near misses reported and processed correctly?
-
22.2 Is the site manager aware of the RIDDOR requirements?
Closeout
-
Site Manager comments:
-
Site Manager:
-
Auditor comments:
-
Auditor: