Site Control
Scaffold Inspection
-
Have competent persons as defined by CAL/ OSHA been in charge of erection? --- Names?
-
Have competent persons as defined by CAL/ OSHA been in charge of erection? --- Names?
-
Are green tags posted and filled daily?
-
Are green tags posted and filled daily?
-
Are scaffold components and planking in safe condition for use and is plank graded for scaffold use?
-
Are scaffold components and planking in safe condition for use and is plank graded for scaffold use?
-
Have Screw jacks been used to level and plumb scaffold instead of unstable objects such as concrete blocks loose bricks, etc.?
-
Have Screw jacks been used to level and plumb scaffold instead of unstable objects such as concrete blocks loose bricks, etc.?
-
Are base plates provided for all scaffold legs?
-
Are base plates provided for all scaffold legs?
-
Are base plates resting on and nailed to a 2x10x10 wood base when on soil?
-
Are base plates resting on and nailed to a 2x10x10 wood base when on soil?
-
Is scaffold level and plumb?
-
Is scaffold level and plumb?
-
Are scaffold legs braced and attached, including ends?
-
Are scaffold legs braced and attached, including ends?
-
Is guard rail in place on all open sides?
-
Is guard rail in place on all open sides?
-
Has proper access been approved? If ladders, are they properly braced and anchored?
-
Has proper access been approved? If ladders, are they properly braced and anchored?
-
Have toeboards or wire screening been provided at proper locations?
-
Have toeboards or wire screening been provided at proper locations?
-
If height of scaffold exceeds 3 times the least base dimension of the frame, are ties and stabilizers provided?
-
If height of scaffold exceeds 3 times the least base dimension of the frame, are ties and stabilizers provided?
-
Has scaffold been tied to structure at least every 30' in length and 25' in height?
-
Has scaffold been tied to structure at least every 30' in length and 25' in height?
-
Have free standing towers been tied every 25'?
-
Have free standing towers been tied every 25'?
-
Is scaffold anchored? Are Screw Jacks screwed out at no more than 2/3 of total adjustment?
-
Is scaffold anchored? Are Screw Jacks screwed out at no more than 2/3 of total adjustment?
-
Does plank have a minimum 12" overlap and extend 6" beyond supports?
-
Does plank have a minimum 12" overlap and extend 6" beyond supports?
-
Check to see if platform is 16" from wall?
-
Check to see if platform is 16" from wall?
-
Have hazardous conditions been provided for?
-
Have hazardous conditions been provided for?
-
Power lines?
-
Power lines?
-
Wind loading?
-
Wind loading?
-
Possible washout of footings?
-
Possible washout of footings?
-
Is there a competent person/qualified person as defined by CAL/OSHA on the project at all times? Has such a person inspected each day?
-
Is there a competent person/qualified person as defined by CAL/OSHA on the project at all times? Has such a person inspected each day?
-
Check for guard rails and midrails on platforms.
-
Check for guard rails and midrails on platforms.
-
Confirm Scaffold is not overloaded.
-
Confirm Scaffold is not overloaded.
-
Are Scaffold planks stamped and identified as scaffold planks, no paints or cuts on them?
-
Are Scaffold planks stamped and identified as scaffold planks, no paints or cuts on them?
-
Are there any stored materials or equipment on the scaffolding that may pose a hazard?
-
Are there any stored materials or equipment on the scaffolding that may pose a hazard?
-
Will workers from different trades be working in close proximity to each other?
-
Will workers from different trades be working in close proximity to each other?