Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Select date
-
Add location
COMMUNICATION
-
T5 / Risk Assessment done?<br>
-
Tool Box Talkes being done and up to date?
TRAFFIC CONTROL
-
Traffic Control Inspections being done daily and documented?
-
Is the traffic control plan properly implemented? <br>
-
Are employees being protected from exposed to traffic?<br>
-
Are flaggers properly trained, attired, equipped, and using proper technique?<br>
-
Backer Spotter being used and wearing spotter vest with emegency whistle?
-
Is equipment parked so as not to present a hazard to through traffic or job traffic? <br>
-
Is equipment and materials stored outside clear zone?<br>
-
Internal traffic cntrol plan in place?<br>
-
A copy of the most current TMUTCD and stater project specific traffic control standards are immediately available for review?
-
Add media
EQUIPMENT & PEDESTRAIN SEGREGATION
-
Breakdown roller clear zone 15 to 20' in effect?
-
All equipment operators following requirements that no equipment is to approach closer than 10 feet to any worker with whom they do not have direct eye contact.
-
No employees riding equipment, unless aprroved seat is provided?
-
Add media
GENERAL HEALTH AND SAFETY
-
Is adequate potable water provided with single service cups in a clean, closed container that is clearly marked?<br><br><br>
-
Are adequate number and types of portable toilets provided where needed?<br>
-
Is the job site kept free of excess debris, lumber with protruding nails, and other scrap that may present a hazard?<br>
MEDICAL AND FIRST AID
-
Are an adequate number of properly stocked first aid kits present on site & readily available?<br>
-
Is at least one employee present who is trained in first aid / CPR / bloodborne pathogens?<br>
PERSONAL PROTECTIVE EQUIPMENT
-
Are employees / subcontractor personnel wearing hard hats, traffic vests, safety glasses and safety boots?<br>
-
Distributor operators have chemical resistant gloves, hard hat with faceshield and long sleeves to protect against hot material?<br>
-
Dust masks are immediately available while any individual is saw cutting concrete or asphalt?
-
Personal Protective Equipment in good working condition?
-
Superviors / Foreman have extra PPE?<br>
Mobile Equipment
-
Are daily inspections conducted on machinery at the site? (fluid levels, brakes, warning devices, etc)<br>
-
Equipment Number
-
Add media
-
Is equipment kept clean to a point of not being an operational hazard?<br>
-
Are all glass panels in equipment free of cracks or breaks?<br>
-
Are seat belts present and in use on all equipment with ROPS?<br>
-
Do all drivers / operators use 3 point contact when climbing on or off vehicles and equipment?<br>
-
Do all pieces of mobile equipment have a slow moving vehicle sign, strobe light and reflective tape?<br>
-
All equipment have back up alarms that can be heard over construction and traffic noise?<br>
-
Does the finish roller have the safety siren / intursion alarm?<br>
-
Equipment being serviced or repaired have proper lockout tagout and blocking procedures?<br>
FIRE PROTECTION AND PREVENTATION
-
Are flammable liquids present only in approved and properly labeled safety cans?<br>
-
Asphalt paver screed free of trash?
-
Are fire extinguishers present in sufficient number & size, properly serviced, and inspected on a periodic basis?<br>
-
Are other fire hazards apparent?<br>
-
Add media
HAND AND POWER TOOLS
-
Are tools free of obvious physical damage with all required guards in place and in good condition?<br>
-
Add media
Fall Protection
-
Are employees and subcontractors working above 6 feet pertoected with adequate fall prtoection?
-
Add media
OVERHEAD AND UNDERGROUND UTILITES
-
Are all overhead power lines identifed and marked / signed "Overhead Power Lines"?
-
Is no work conducted within 10 ft of transmission lines rated greater or equal to 600 V without required precautionary measures taken?<br>
-
Has the one call center (811) been notified?
-
Pot Holeing or Best Practices used for verfication of utilities?
-
Add media
Trench and Excavation
-
Are excavations or trenches deeper than 5 feet on the job site proplery sloped, benched or shored?
-
Have underground utilities been located?
-
Is there a means of exiting any trench 4 feet or more within 25 lateral feet of any employee?
-
Is the pile kept at least 2 feet from edge of anmy excavation?
-
Competent person performed inspection of excavation?
-
Add media
ENVIRONMENTAL
-
No diesel being used on project, biodegradable products being used?<br>
-
Is required sediment control in place and maintained as required by the job plans are standard practices?<br>
-
Are spill response materials present and readily available?<br>
-
Are appropriate housekeeping practices in place to insure responsible environmental performance?<br>
-
Add media
COMPANY VEHICLES
-
All crew drivers trained in company safe driving program (Defensive Driving)?
-
Vehicle clean appropriate housekeeping?<br>
-
Tires in good condtion, tread depth?
-
Mirrors in good working condition?
-
Physical Condition, body is free of damage?
OTHER SAFETY RELATED IITEMS NOTICED
-
No unsafe behaviors observed? If no, please exlian below how it was corrected.
-
Following CRH FFE's?
-
Other
SUBCONTRACTORS
-
Are employees unnecessarily exposed to traffic? <br>
-
Wearing proper personal protective equipment?
-
Add media
-