Title Page
-
Conducted on
-
Prepared by
-
Location
-
Active Leadership/ Active Visibility
-
Craft demonstrate obligation to safety, Safety Culture is strong.
-
Entire project team demonstrates an obligation to safety/ are accountable
-
CE/PM/Supt. leads by example and is visible & engaged on the project .
-
Housekeeping (Including Micro Trash)
-
Cluttered areas, walkways need attention, site lacks professionalism, etc.
-
Project is clean and organized, but a few areas need extra attention.
-
Project is very clean, organized, & professional
-
SWI and Pre Task Planning Cards
-
Haz Rec/Near Miss and Management of Change cards are submitted
-
Pre-task covers issues not on SWI. MOC discussion/training done
-
SWI's are trained to and updated continuously.
-
Incident Reporting (Near Miss, Haz Rec, MOC and Accident Investigation)
-
Incident Reporting is inadequate. Minimal subcontractor participation.
-
Project trends are visible & communicated to the project regularly.
-
Incidents are reviewed at safety / POD meetings and at stretching.
-
Work Observation Auditing Process
-
Audit schedule is created and visible. Audit done at least 3 times a week.
-
Audits include Safety, Quality, MPS and Innovation (one form - one auditor)
-
Audits are comprehensive (not just one piece) Project uses as part of CIP
-
100% PPE (Hard Hats, Safety Glasses, Hi-vis vests, Gloves, Boots, Hearing Protection)
-
People are seen missing some portion of PPE - Is the issue addressed?
-
All on site follow PPE requirements;
-
Hearing Protection program is understood and followed at piles (2 types required)
-
POD Meetings
-
POD meetings & their attendance are irregular. No set agenda or schedule.
-
All contractors represented. POD is documented/available. Safety discussed
-
Collaborative meeting with Sub participation and use of technology.
-
Preconstruction Meeting
-
Not all contractors on site have been through the Pre-Construction Process. <br>
-
Meetings 1 week prior to mobilization. Agenda and minutes are kept and filed.
-
Exhibit E, Event Management, and Best Practice Database are utilized for trends, events, etc. relevant to work scope.
-
Emergency Response Plan (ERP)
-
ERP not posted or communicated to craft - Verify
-
Current ERP is developed, posted, and explained to all at orientations - Verify <br>
-
Mock drills conducted regularly (with or without EMS) <br>
-
Quality
-
QA/QC program built but not working well.
-
QA/QC program built and catching many issues.
-
QA/QC Program built and fixing processes so there are no or few issues.
-
Innovation Team
-
Innovations not being submitted or not being replyed to.
-
Innovations submitted and responded to.
-
Innovations being implemented or parked and action communicated to all.
-
Visit with three (3) random craft workers. Each should rate the overall safety, communication and team's engagement from 0-2. Total score from all three:
-
Sporadic Orientations, not always 1st day/1st hour. No Re-Orientations. <br>
-
Formal 1st Orientation conducted for all craft workers. No set schedule or plan for Orientations. 2nd & 3rd Orientations conducted but inconsistent.
-
Orientations have documentation. PM and/or Supt. participates in all of the Orientations. Re-Orientations are current, documented in a log, and occur within 5 weeks of starting on the project.
-
No evidence of a Site Safety Leadership Team (ID of members, minutes, etc.)
-
Meetings held monthly with an agenda and minutes distributed or posted.
-
Site Safety Leadership Team members are identified by photographs or equivalent means. Craft is included and meetings are held at least bi-weekly.
-
Sr. Level Safety Leadership Team (Safety Pro's, Supts, PM's, etc.) to assist the project's safety performance, discuss trends, etc. - separate meeting
-
Job Wide Safety Meetings
-
Meetings are inconsistent (no set day/time). Documentation is incomplete.
-
Meetings are conducted by the project team and held monthly with all workers on site in attendance. An agenda and attendance is documented.
-
Meetings scheduled bi-weekly (at least) with full attendance. Special training sessions have been conducted relevant to jobsite trends or activities.
-
Tool Box Talks
-
No set day of the week established - sporadic. Lacking documentation.
-
One Mortenson, subcontractor and tiered subcontractor safety meeting conducted per week, minutes & attendance filed.
-
A tracking form is used to identify all toolbox talks from all contractors on site. A plan is in place to address contractors not participating to 100%.
-
MSDS / Hazard Communication
-
Not all contractors have submmitted MSDS's. Missing books.
-
MSDS's current & plan to ensure all chemicals are accounted for - Verify.
-
Hot Work/Daily Dig Permits
-
HWP/DDP process is intermittent. No map. Outstanding permit(s).
-
HWP/DDP are issued daily from Mortenson and closed out at end of shift. No outstanding permits on map. Verify permit requirements are being followed.
-
Recognition and Reward Program
-
No project-specific plan to recognize and reward craft.
-
Monthly Safety, Quality, MPS and Innovation lunch meeting. Leading Indicators tracked and incentivized.
-
Vehicle/Equipment
-
Training programs not in use, records not kept up.
-
Vehicle Training and documentation complete - No incidents of equipment damage in the last month.
-
SWPPP and SPCC
-
No SWPPP or SPCC required.
-
SWPPP and SPCC not current
-
SWPPP and SPCC inspectons and paperwork current
-
Untitled page