Title Page
-
Conducted on
-
Prepared by
-
Location
-
Work Order Number
-
Basin dry at time of inspection (Yes / No)
-
Water Level (if applicable) (mAHD)
Main Embankment (If yes to any, comment on severity, location and priority)
-
Culvert entry (cracks, debris, vegetation)
-
Culvert hand railing (condition - broken, rusted)
-
East Gabion Entrainment wall (baskets damaged, vegetation, etc.)
-
West Gabion Entrainment wall (baskets damaged, vegetation, etc.)
-
Earth Embankment - up to RIP RAP (visible slumps, cracks, vegetation)
-
Rip Rap - rock mattress (damage)
-
Rip Rap - rock mattress (vegetation - trees, grass, etc)
-
Trees on either face or toe
Outlet Works - Culvert & Trash-rack (If yes to any, comment on severity, location and priority)
-
Culvert Trash-racks blocked or obscured - debris or vegetation
-
Culvert entry blocked or obscured - debris or vegetation
-
Culvert hand railing (condition - broken, rusted)
-
Embankments on either face or toe - Trees growing
-
Rip Rap between outlet and road culvert - Problem
Dam Storage Area (If yes to any, comment on severity, location and priority)
-
Trees growing in storage area
-
Vegetation encroachment onto embankments
General Maintenance Observations (If yes to any, comment on severity, location and priority)
-
Stormwater pipe on North side of outlet culvert - Problem
-
Obscene or personal Graffiti
-
Other