Title Page

  • Conducted on

  • Prepared by

  • Location
  • Work Order Number

  • Basin dry at time of inspection (Yes / No)

  • Water Level (if applicable) (mAHD)

Main Embankment (If yes to any, comment on severity, location and priority)

  • Culvert entry (cracks, debris, vegetation)

  • Culvert hand railing (condition - broken, rusted)

  • East Gabion Entrainment wall (baskets damaged, vegetation, etc.)

  • West Gabion Entrainment wall (baskets damaged, vegetation, etc.)

  • Earth Embankment - up to RIP RAP (visible slumps, cracks, vegetation)

  • Rip Rap - rock mattress (damage)

  • Rip Rap - rock mattress (vegetation - trees, grass, etc)

  • Trees on either face or toe

Outlet Works - Culvert & Trash-rack (If yes to any, comment on severity, location and priority)

  • Culvert Trash-racks blocked or obscured - debris or vegetation

  • Culvert entry blocked or obscured - debris or vegetation

  • Culvert hand railing (condition - broken, rusted)

  • Embankments on either face or toe - Trees growing

  • Rip Rap between outlet and road culvert - Problem

Dam Storage Area (If yes to any, comment on severity, location and priority)

  • Trees growing in storage area

  • Vegetation encroachment onto embankments

General Maintenance Observations (If yes to any, comment on severity, location and priority)

  • Stormwater pipe on North side of outlet culvert - Problem

  • Obscene or personal Graffiti

  • Other

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.