Information
-
Main Contractor
-
Site
-
Location
-
Conducted on
-
Prepared by
-
Persons Carrying out work to Area being Accessed
PREPARATION FOR RAINSCREEN CLADDING - THERMOWOOD/TERRACOTTA ETC
-
Were proper measures carried out before acquisition of the materials ?
-
Was sufficient time provided for communication with the client before acquisition of materials.
-
Did the works programme provided sufficient time for acquisition of the most suitable and high value cladding materials ?
-
Was procurement of the materials scheduled and checked?
-
Have the Operatives been provided with sufficient training in the specified system?
-
Has the operative been given the relevant drawings and details to complete the works?
-
Have the windows / curtain wall / doors been installed to the correct levels?
-
Are EPDM's correctly installed?
-
Is wall to correct line and level?
FLASHING / PODS / CILL CORNER TRIMS
-
Are cills, pods and flashings been installed to the correct design details? Thickness, colour and depth
-
Are cills, pods and flashings been installed using the fixings and centres?
-
Are cills, pods and flashings been installed to suit correct cladding set out and joints?
BREATHER MEMBRANE AND SUBFRAME SETTING OUT
-
Have all vents and rainwater pipes been taken through the substate?
-
Has correctly specified breather membrane been installed?
-
Has the breather membrane been dressed out and over horizontal flashings / pods and taped?
-
Has breather membrane been taped at vertical joints and taped 300mm at horizontal joints?
-
Has EPDM been installed to all vents / rwp's / louvre bracket fixing centres?
-
Is there 2nr brackets for any one rail minimum?
-
Have thermal pads been installed behind brackets?
-
Have correct type and number of fixings been used?
-
Have brackets been fixed at stud locations?
-
Have brackets been set in accordance with deflection point locations?
INSULATION / TAPING
-
Has insulation been fitted as tight as possible?
-
Have fire barriers been fitted and at correct locations?
-
Have all outlets, brackets, vents etc been taped up?
FITTING OF RAILS
-
Has there been one dead fixing for rail minimum?
-
Has the first bracket on rail been fitted at no more than 200 mm from the end of the rail? Has it been indicated on the drawing/layout?
CLADDING INSTALLATION
-
Have drilling holes in rail been made no bigger than 5 mm?
-
Have drilling holes in trespa been made at dimension of 10 mm, with exception for one hole in the middle of the board, which must be 5 mm(while using guide at all times)?
-
Has the trespa been held tight against rails during fixing stage, especially at facets?
-
Has fire break been maintained 25 mm away from trespa panel?
-
Has Flymesh been fitted at base and at cill levels?
-
Was trespa measurement taken after brackets and rails have been installed?
-
Have small rails been put onto head rails before fitting trespa?
-
Has the cladding been hose tested?
Inspection result
-
Result of the inspection
-
Site notes
-
Should you have any enquiries regarding this inspection report please contact M Clarke & Sons on 02825822500.
-
M. Clarke Representive
-
Main Contractors Representative
-
Add signature