Information

  • Main Contractor

  • Site

  • Location
  • Conducted on

  • Prepared by

  • Persons Carrying out work to Area being Accessed

PREPARATION FOR RAINSCREEN CLADDING - THERMOWOOD/TERRACOTTA ETC

  • Were proper measures carried out before acquisition of the materials ?

  • Was sufficient time provided for communication with the client before acquisition of materials.

  • Did the works programme provided sufficient time for acquisition of the most suitable and high value cladding materials ?

  • Was procurement of the materials scheduled and checked?

  • Have the Operatives been provided with sufficient training in the specified system?

  • Has the operative been given the relevant drawings and details to complete the works?

  • Have the windows / curtain wall / doors been installed to the correct levels?

  • Are EPDM's correctly installed?

  • Is wall to correct line and level?

FLASHING / PODS / CILL CORNER TRIMS

  • Are cills, pods and flashings been installed to the correct design details? Thickness, colour and depth

  • Are cills, pods and flashings been installed using the fixings and centres?

  • Are cills, pods and flashings been installed to suit correct cladding set out and joints?

BREATHER MEMBRANE AND SUBFRAME SETTING OUT

  • Have all vents and rainwater pipes been taken through the substate?

  • Has correctly specified breather membrane been installed?

  • Has the breather membrane been dressed out and over horizontal flashings / pods and taped?

  • Has breather membrane been taped at vertical joints and taped 300mm at horizontal joints?

  • Has EPDM been installed to all vents / rwp's / louvre bracket fixing centres?

  • Is there 2nr brackets for any one rail minimum?

  • Have thermal pads been installed behind brackets?

  • Have correct type and number of fixings been used?

  • Have brackets been fixed at stud locations?

  • Have brackets been set in accordance with deflection point locations?

INSULATION / TAPING

  • Has insulation been fitted as tight as possible?

  • Have fire barriers been fitted and at correct locations?

  • Have all outlets, brackets, vents etc been taped up?

FITTING OF RAILS

  • Has there been one dead fixing for rail minimum?

  • Has the first bracket on rail been fitted at no more than 200 mm from the end of the rail? Has it been indicated on the drawing/layout?

CLADDING INSTALLATION

  • Have drilling holes in rail been made no bigger than 5 mm?

  • Have drilling holes in trespa been made at dimension of 10 mm, with exception for one hole in the middle of the board, which must be 5 mm(while using guide at all times)?

  • Has the trespa been held tight against rails during fixing stage, especially at facets?

  • Has fire break been maintained 25 mm away from trespa panel?

  • Has Flymesh been fitted at base and at cill levels?

  • Was trespa measurement taken after brackets and rails have been installed?

  • Have small rails been put onto head rails before fitting trespa?

  • Has the cladding been hose tested?

Inspection result

  • Result of the inspection

  • Site notes

  • Should you have any enquiries regarding this inspection report please contact M Clarke & Sons on 02825822500.

  • M. Clarke Representive

  • Main Contractors Representative

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.