Title Page
-
Document No.
-
Conducted on
-
Prepared by: Jessica Mayer
-
Name of Permittee: St Norbert College
-
Construction Site Name: Schuldes Sports Complex
-
Construction Site ID #: 55645
-
Location (Including County): 601 3rd St, De Pere, WI, Brown County
-
Type of Inspection:
-
Weekly
-
Precipitation Event
-
Other
-
Please note inspection reports, along with erosion control and storm water management plans, are required to be maintained on site in accordance with s.NR216.48 (4) and made available upon request.
-
Weekly Inspection
-
Rain Event Inspection
-
If rain event, how much precipitation?
Weather
-
Temperature
-
Conditions (Sunny, Cloudy, ...)
-
Last Rainfall Date
-
Site Conditions
Phase of Construction at Time of Inspection
BMP Inspection
-
Are the following in place and working properly?
-
Is the permit certificate posted where visible?
-
Is the erosion control plan accessible to on site personnel?
-
Is the current phase of construction on sequence with the site-specific erosion and sediment control plan, including installation/stabilization of ponds and ditches?
-
Silt Screen
-
Silt Fence
-
Temporary Seeding
-
Tracking Pads
-
Ditch Checks
-
Turbidity Barrier
-
Temporary Diversion Channel
-
Temporary Settling Basin
-
Sod
-
Permanent Seeding
-
Stabilized Outlet
-
Erosion Mat
-
Mulch
-
Other (specify)
-
Is All Sediment Onsite?
-
Are these onsite/working properly (if no please describe)?
-
Schedule/Phasing
-
Erosion Control Plan
-
Grading Practices