Title Page
-
Site conducted
-
Conducted on
-
Prepared by
Site audit
PPE
-
Is all PPE being worn correctly
-
Is PPE clean and in good order
Are all Access and Egress points free from obstruction and all potential hazards
-
Access roads
-
Site walkways
-
Office walkways
Are there adequate welfare facilities
-
Canteen
-
Drying room
-
Toilets
-
Showers
-
Are all facilities clean and fit for purpose
Storage areas
-
Material storage
-
Bucket changing area
-
Fuelling area
-
Is fuelling area secure when not in use
-
Are there spill kits at the fuel station
-
Are there fire extinguishers at the fuel station
Housekeeping
-
Are all materials stored correctly
-
Are all excess materials removed back to the storage area
-
Are all works areas tidy
Pressure systems
-
Compressors
-
Pressure washsers
Fire
-
Are all escape routes and call points free from obstruction
-
Are there adequate fire extinguishers
RAMS
-
Are all risk assessments in place
-
Are all method statements in place
-
Have all operatives been briefed on the RAMS
-
Are POWRA's being done
HAV's
-
Are HAV exposures being recorded
Toolbox talks
-
Are TBT being carried out as required
Permits
-
Are all permits in place and in date
-
Are all lift plans in place
Quality
-
Are all QA sheets being completed
-
Are all hold points identified
-
Are photos being uploaded weekly
Electrical equipment
-
PAT tests in date
First aid
-
Are all required first aid kits on site e.g. first aid, burns, eye wash
-
Are the kits stored in the correct place
-
Are the kits fully stocked and in date
-
Is there an accident book on site
COSHH
-
Are all data sheets and assessments available
-
Are all hazardous materials contained / stored correctly
-
Is there a list of items contained in the COSHH store on display
Chapter 8
-
Are all signs , barriers and lights in place
-
Are all signs / cones clean
-
Are all ramps and plates in place
Excavations
-
Are all excavations fenced and signed accordingly
-
Has the excavation register been filled out [if open longer than 7 days]
-
Is the area classed as a confined space
-
If yes are all operatives trained in confined space entry and all equipment on site
-
Does working at height apply [ if yes see below section]
-
Has a CAT and Genny been used [visual signs]
-
Have the side of the excavation not been overloaded
-
HAs all shoring been installed with handrails and access fitted
Reinforcing
-
Is all steel / mesh stored correctly
-
Are work areas tidy
-
Are all exposed bars protected with mushroom caps etc.
Carpentry cutting area
-
Is all formwork installed and braced correctly
-
Is a suitable cutting bench being used
-
Is a vacuum being used
-
Is the cutting area fenced off and seggregated
-
Are all trailing leads managed
Plant inspections PUWER / LOLER
-
Are all item of small plant and tools in good condition
-
Have all daily inspections been carried out
-
Are all manuals with the item of plant
-
Are all plant certs in date
-
Is all lifting equipment in good condition and certified
-
Are defects found being reported / rectified
-
Are all PUWER sheet filled out
-
Are all LOLER sheets filled out
New staff / Young persons
-
Are all new staff [employed for less than a month] meeting Woodmace standards
-
Have all young persons on site been briefed in their roles and responsibilities
Subcontractors
-
Are all sub-contractors meeting / exceeding Woodmace Safety Rules
-
Are sub-contractors working with Woodmace operatives
-
Have sub-contractors supplied their own RAMS
Environmental
-
Have all watercourses been identified
-
Is there a spill kit on site and fully stocked
-
Is all the spoil on site contained / segregated correctly
-
When wet is the spoil prevented from entering water courses
-
Is all waste placed in appropriate skips
-
Is dust suppression being used
-
Are plant nappies being used
Outside areas
-
Smoking shelter
-
Vaping shelter
-
Outside seating
-
Mobile phone area
Working at height
-
Are all ladders / stairs tagged
-
Access platforms tagged
-
Fall arrest systems in place
-
Edge protection in place
-
Handrails in place and secure