Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Pre-Start Checks

  • Has a ground survey been carried out prior to erection of scaffold?<br><br>

  • Is the scaffolding or platform been inspected prior to use and has a valid scaff tag? if yes, (Insert Number)<br>

  • Are all access ladders secure?<br><br>

  • Is there overboard working involved with the task, if yes, Insert work instruction Number) <br>

SIMOPS

  • Are simultaneous operations being carried out, if yes, list the task / activity<br>

Controls in Place

  • Has all relevant controls been implemented, as a minimum risk assessment, PTW, JSA & TBT are all documentation signed by all participants. Insert all document numbers.

  • Is there Good safety communication between parties

  • Noise level is acceptable/adequately controlled

  • Are sufficient warning signage and barriers in place to warn others (list all)<br>

Access Equipment

  • Has the mitigation of dropped objects been considered when erecting scaffold or Tower?<br> <br>

  • Are the ladders, hand rails and toe boards in good condition? <br>

  • Are all exits and walkways clear from obstructions?

General Safety

  • Is there suitable and sufficient lighting installed in the task area to enable work to be carried out safely. (list all types used)<br>

  • Are all tools and equipment being used in good condition, including all guards and all electrical cables and fittings ( insert test date)<br>

  • Is there whip checks fitted to all Compressed air equipment

Housekeeping

  • Are all areas clean, tidy and free from combustible material, Inc. all trailing cables secured / covered and any spills cleared up immediately (list all controls)<br>

  • Add media

PPE

  • Is everyone wearing the correct / required PPE / RPE for the task, as specified in the risk assessment, toolbox / JSA? (list all)<br>

  • Are all personnel wearing suitable harness, lanyards or restraints for the specific task and are they free from defects? (list type)<br>

  • Add media

Emergency Arrangements

  • Are all personnel, Inc. Tank sentry fully aware of how to raise the alarm? (list when last test was completed)<br>

  • Are suitable arrangements in place, inc. Fire, first aid & rescue plan (list all)<br>

Other Hazards

  • List all potential Hazards and risks<br><br>

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.