Title Page
-
Model of mould
-
Site conducted
-
Location
-
Conducted on
-
Prepared by
CHECK LIST
-
Switch on the hinge hydraulic power pack and operate the hinge cylinders.
-
Switch on the Pneumatic hydraulic power pack operate the Jack cylinders.
-
Switch on the Pneumatic hydraulic power pack operate the Lock cylinders.
-
Check any oil leakages in Cylinders and hoses.
-
Check the lock chain condition.
-
Switch on the PS mould heating with 40degree and check the heating function.
-
Switch on the SS mould heating with 40degree and check the heating function.