Title Page
-
Site conducted
-
CRM Number
-
Client/Site
-
Describe the item you are quoting.
-
Rep Name
- James Conroy
- Jim Faix
- Phil Conroy
- Brad Harriott
- Willem Nel
- Other
-
Enter Rep Name
-
Date completed
-
Quote prepared by
Chute/Tiling Checklist
-
Is the item you are quoting a tiled chute/box?
-
Has the area been measured accurately and double checked?
-
Have the cuts been counted and double checked?
-
Has the complexity of tiling been taken into account with tiling rates?
-
Are there double bevels?
-
Have they been added to costings?
Quote Completion Checklist
-
Job folder created and enquiry details placed in relevant folder?
-
Have you checked previous supply?
-
Provide previous job's HMA Number
-
Attach previous master cost report.
-
Is MDR/ITP/NDT/Hydro Test Required?
-
MDR?
-
Provide details
-
ITP?
-
Has word document been saved to job folder?
-
NDT?
-
Provide details of required NDT
-
Hydrotesting?
-
Provide Details of Hydrotesting requirements
-
Have costings been completed and double checked?
-
Does new sell price vary much from previous supply?
-
Provide details
-
Has quote letter been proofed and spell checked?
-
Have you provide details of specific inclusions/exclusions?
-
Has lead time been confirmed with production?
-
Have material stocks/availability been checked to see if we can to complete in time?
-
Has CRM been updated?
-
Have relevant supplier quotes been placed in folder named clearly?
-
Irrelevent quoted moved to superseded folder?
-
Reference only quotes stamped "reference only"
-
Was there anything else unusual about this job the rep should be informed about?
-
Provide details
-
Are drawing changes required?
-
Provide details
Finalisation
-
Create email to confirm completion of quote.
-
Insert hyperlink
-
Insert brief handover
-
Attach copy of this report and insert a copy in the job file under costings