Information

  • Job number:

  • Conducted on

  • Prepared by

  • Business Name

  • Location
  • Additional address information: (if required)

  • Parking Information (Location and cost):

  • New install or upgrade?

  • Areas that require coverage

  • Add wide angle photos of all areas that require coverage.

Router

  • Photo of router location (Close up) (proposed or current):

  • Photo of router location (Wide angle) (proposed or current):

Switch

  • Will a switch be used? (proposed or current):

  • Photo of switch location (proposed or current):

  • Photos to identify router to switch cable run, availability of power, patch points to be used etc (Skitch cable route in red)

  • Insert notes on switch cable run, availability of power, patch points to be used, etc

Access Points

  • Has the customer given permission for the use of existing patch panels? (Please ensure existing patch panels have been tested)

  • Photo of access point 1 location (Wide angle) (proposed or current)

  • Photos to identify access point 1 cable run (skitch cable route in blue)

  • Is a patch point being used?

  • Photo of patch point locations (Wide angle)

  • Patch point number used:

  • Insert notes on access point 1 cable run, availability of power needed etc

  • Access point mounting type:

  • Screenshot for test access point 1 heatmap:

  • Will there be an access point 2?

  • Photo of access point 2 location (Wide angle) (proposed or current)

  • Photos to identify access point 2 cable run (skitch cable route in blue)

  • Is a patch point being used?

  • Photo of patch point locations (Wide angle)

  • Patch point number used:

  • Insert notes on access point 2 cable run, availability of power needed etc

  • Access point mounting type:

  • Screenshot for test access point 2 heatmap:

  • Will there be an access point 3?

  • Photo of access point 3 location (Wide angle) (proposed or current)

  • Photos to identify access point 3 cable run (skitch cable route in blue)

  • Is a patch point being used?

  • Photo of patch point locations (Wide angle)

  • Patch point number used:

  • Insert notes on access point 3 cable run, availability of power needed etc

  • Access point mounting type:

  • Screenshot for test access point 3 heatmap:

  • Will there be an access point 4?

  • Photo of access point 4 location (Wide angle) (proposed or current)

  • Photos to identify access point 4 cable run (skitch cable route in blue)

  • Is a patch point being used?

  • Photo of patch point locations (Wide angle)

  • Patch point number used:

  • Insert notes on access point 4 cable run, availability of power needed etc

  • Access point mounting type:

  • Screenshot for test access point 4 heatmap:

  • Will there be an access point 5?

  • Photo of access point 5 location (Wide angle) (proposed or current)

  • Photos to identify access point 5 cable run (skitch cable route in blue)

  • Is a patch point being used?

  • Photo of patch point locations (Wide angle)

  • Patch point number used:

  • Insert notes on access point 5 cable run, availability of power needed etc

  • Access point mounting type:

  • Screenshot for test access point 5 heatmap:

  • Will there be an access point 6?

  • Photo of access point 6 location (Wide angle) (proposed or current)

  • Photos to identify access point 6 cable run (skitch cable route in blue)

  • Is a patch point being used?

  • Photo of patch point locations (Wide angle)

  • Patch point number used:

  • Insert notes on access point 6 cable run, availability of power needed etc

  • Access point mounting type:

  • Screenshot for test access point 6 heatmap:

  • Will there be an access point 7?

  • Photo of access point 7 location (Wide angle) (proposed or current)

  • Photos to identify access point 7 cable run (skitch cable route in blue)

  • Is a patch point being used?

  • Photo of patch point locations (Wide angle)

  • Patch point number used:

  • Insert notes on access point 7 cable run, availability of power needed etc

  • Access point mounting type:

  • Screenshot for test access point 7 heatmap:

  • Will there be an access point 8?

  • Photo of access point 8 location (Wide angle) (proposed or current)

  • Photos to identify access point 8 cable run (skitch cable route in blue)

  • Is a patch point being used?

  • Photo of patch point locations (Wide angle)

  • Patch point number used:

  • Insert notes on access point 8 cable run, availability of power needed etc

  • Access point mounting type:

  • Screenshot for test access point 8 heatmap:

  • Photo of access point 1 location (Wide angle) (proposed or current)

  • Photos to identify access point 1 cable run (skitch cable route in blue)

  • Insert notes on access point 1 cable run, availability of power needed etc

  • Access point mounting type:

  • Screenshot for test access point 1 heatmap:

  • Will there be an access point 2?

  • Photo of access point 2 location (Wide angle) (proposed or current)

  • Photos to identify access point 2 cable run (skitch cable route in blue)

  • Insert notes on access point 2 cable run, availability of power needed etc

  • Access point mounting type:

  • Screenshot for test access point 2 heatmap:

  • Will there be an access point 3?

  • Photo of access point 3 location (Wide angle) (proposed or current)

  • Photos to identify access point 3 cable run (skitch cable route in blue)

  • Insert notes on access point 3 cable run, availability of power needed etc

  • Access point mounting type:

  • Screenshot for test access point 3 heatmap:

  • Will there be an access point 4?

  • Photo of access point 4 location (Wide angle) (proposed or current)

  • Photos to identify access point 4 cable run (skitch cable route in blue)

  • Insert notes on access point 4 cable run, availability of power needed etc

  • Access point mounting type:

  • Screenshot for test access point 4 heatmap:

  • Will there be an access point 5?

  • Photo of access point 5 location (Wide angle) (proposed or current)

  • Photos to identify access point 5 cable run (skitch cable route in blue)

  • Insert notes on access point 5 cable run, availability of power needed etc

  • Access point mounting type:

  • Screenshot for test access point 5 heatmap:

  • Will there be an access point 6?

  • Photo of access point 6 location (Wide angle) (proposed or current)

  • Photos to identify access point 6 cable run (skitch cable route in blue)

  • Insert notes on access point 6 cable run, availability of power needed etc

  • Access point mounting type:

  • Screenshot for test access point 6 heatmap:

  • Will there be an access point 7?

  • Photo of access point 7 location (Wide angle) (proposed or current)

  • Photos to identify access point 7 cable run (skitch cable route in blue)

  • Insert notes on access point 7 cable run, availability of power needed etc

  • Access point mounting type:

  • Screenshot for test access point 7 heatmap:

  • Will there be an access point 8?

  • Photo of access point 8 location (Wide angle) (proposed or current)

  • Photos to identify access point 8 cable run (skitch cable route in blue)

  • Insert notes on access point 8 cable run, availability of power needed etc

  • Access point mounting type:

  • Screenshot for test access point 8 heatmap:

Equipment count

  • How many NEW routers are required?

  • How many NEW switches are required?

  • Amount of NEW access points required?

  • Amount of NEW POE's required?

  • Amount of 4 way anti surge power extensions required?

General Information

  • Insert additional notes of other requirments ie. extra power, access etc

  • Insert any additional photos:

  • Estimated install time:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.