Information
-
Audit Title
-
Document No.
-
Conducted on
-
Prepared by
-
Location
-
Personnel attending the inspection
-
SCADA system operational and in good working order?
-
SCADA system readings evaluated to manual readings?
-
Plant inspection records available for review?
-
Are operational and maintenance manuals available and up to date? Does it include all transient non-community wells?
-
Does the O&M include all water source sites and the associated sampling and monitoring plans?
-
Independent regulation compliance review performed? Is the latest report findings on file and available?
-
Is Quality inspection performed on certified lab sampling procedures each week? Are the reports filed and available?
-
Is Pre-flushing performed prior to sampling being taken? Is chlorine residual readings being recorded?
-
Is a log file being kept for all 332 projects initiated to resolve equipment or system failures? Does the log provide the dated status of the project? Ie. In-programming, In-progress completed.
-
Is the water plant approved chemical listing posted to include quantities on hand and a verification date with the NFS/ANSI standard 60 certified for public drinking water systems?
-
Are internal and external site OSHA Safety inspection being performed monthly? Are reports filed and available?
-
Are monthly reviews of the New Jersey Safe Drinking Water Act Regulations being performed, NJAC 7:10-1.1 for changes to ensure compliance? Are these filed and available?
Signatures
-
Inspecting Manager
-
Facility Manager
-
Safety Manager