Information
-
Project/Job #:
-
Project Name:
-
Conducted on:
-
Prepared by:
-
Location
-
Contractors On Site:
DOCUMENTATION
-
A. Safety Manuals On Site
-
B. Safety Data Sheets (SDS's)
-
C. Safe Plan of Action (SPA) Completed
-
D. Safety Observation Report (SOR) Completed
JOB SITE POSTERS
-
A. All OSHA Required Posters
-
B. Emergency Action Plan Posted
-
C. Emergency Contacts List
WORK AREA / SITE PROTECTION
-
A. General Housekeeping
-
B. Walking - Working Surfaces
-
C. Unprotected Sides or Holes
-
D. Impalement Hazards
-
E.. Sanitary Facilities
-
F. Trash Receptacles / Waste Containers - Is Trash, Waste, and Scrap Material in Proper Containers
-
G. Material Storage/Lay Down
-
H. Conex Box, Gang Box
-
I. Lighting is Adequate
-
J. Overhead Work - Barricades In Place with Signage
-
K. Signs Posted - Constuction Area, PPE Requirements, Exits, Authorized Personnel Only, Danger, Caution etc.
-
L. General Public & Client Protection - Constuction Signs Posted, Perimeter Fencing, Appropriate Barricades etc.
HEALTH/FIRST AID
-
A. CPR/First AidTraining
-
B. First Aid Kit (No Expired Items)
-
E. Other
PERSONAL PROTECTIVE EQUIPMENT (PPE)
-
A. Hard Hats
-
B. Safety Glasses with Side Shields
-
C. Face Shield / Goggles (Cutting, Chipping or Grinding)
-
D. Respiratory Protection (If Required)
-
E. Hearing Protection (If required)
-
F. Clothing - High Visibility Shirts / Vest
-
G. Gloves
-
H. Foot Protection - Steel or Composite Toe Boots
-
I. Additional PPE
FALL PROTECTION
-
A. Trained Personnel (Competent Person)
-
B. Worn Properly and Used Correctly
-
C. Suitable Anchorage Points - Capable of Supporting 5000 Pounds
-
D. If Employees are using Fall Protection are they Tied Off 100%
-
E. Fall Protection Equipment Inspected Prior to Use
-
F. Stored Properly
-
G. Emergency Rescue Plan
-
H. Guardrails Installed Properly - Top Rail, Mid Rail, & Toe Board
-
I. Other
LADDERS
-
A. Safe Use - Base/Footing/Set Up - Firm, Level Surface
-
B. Inspected Prior to Use
-
C. Proper Ladder Type for Task
-
D. Extension Ladder Extends 3ft Above Landing & Secured
-
E. Step Ladder Used in "A" Frame, No Standing on Top Two Steps
HAND & POWER TOOLS
-
A. In Good Condition
-
B. Inspected Prior to Use
-
C. Proper Tools Used for each Job
-
D. Power Tools have the Appropriate Shield, Guards or Attachments as Recommended by the Manufacture
-
E. Are Cords in Good Condition & Ground Prongs In Place
-
F. Other:
AERIAL LIFTS
-
A. Trained Personnel (Competent Person)
-
B. Aerial Lifts Gates, Chains, Bar Secured and In Place
-
C. Aerial Lifts Operator's Feet On The Floor
-
D. Aerial Lift Operator Tied-Off and Using Proper Fall Protection Equipment
-
E. Aerial Lifts in Good Condition
-
F. Barricades In Place for Overhead Work
-
G. Employees Prohibited from Exiting Raised Lifts
-
H. Inspection of Equipment and Work Area
MATERIAL HANDLING & STORAGE
-
A. Materials are Properly Stored, Stacked & Cribbed
-
B. Lifting: Employees are Using Proper Lifting Methods
-
C. Aisle Spaces Maintained Around Stored Material
-
D. Storage Area Kept Clear of Scraps, Debris and Trash
ELECTRICAL
-
A. G.F.C.I.'s being Used
-
B. Extension Cords
-
C. Power Tools
-
D. Lock Out/Tag Out
-
E. Wiring & Cord Protection from Damage - Not Routed Through Pinch Points, Shape Edges or Vehicle Traffic
-
F. Energized Electrical Work by Qualified Person Following NFPA 70E Standards
-
G. Energized Panel Doors Not Left Open and Unattended
FIRE SAFETY / WELDING & CUTTING
-
A. Hot Work Permit (if required)
-
B. Fire Watch Assigned (Competent Person)
-
C. Fire Extinguisher/Inspected and In the Area
-
D. Combustibles removed/isolated
-
E. Hot Work Barricade / Fire Blankets / Welding Screens (if required)
-
F. Flammable Liquids - Properly Stored & Labeled / Gas Can(s) / Safety Cans (No Plastic Cans)
-
G. Oxygen & Acetylene Tanks Properly Secured
RIGGING AND HOISTING
-
A. Capacity Tags In Place and Legible
-
B. Hooks and Latches - Safety Latches In Place
-
C. Chain falls/Come-a-longs
-
D. Tag Lines
-
E. Inspected Prior to Use
-
F. Designated Qualified Rigger
-
G. Employees Not Working Under Suspended Loads
SCAFFOLD
-
A. Trained Personnel (Competent Person)
-
B. Hand and Mid-rails, Toeboards
-
C. Platform Decked/Secured
-
D. Level Footing/Set up
-
E. Access/Egress
-
F. Away from Powerlines
-
G. Barricades
-
H. Inspection/Tagged Correctly
CRANE EQUIPMENT
-
A. Annual Crane Inspection
-
B. Operator Manual
-
C. Crane Setup
-
D. Crane Swing Radius Barricaded
-
E. Flagman with Vest
-
F. Operator Qualified and Certified
-
G. Designated Qualified Signaller
-
H. Fall Zone Procedures
-
I. Lift Plan (if required)
EQUIPMENT / POWERED INDUSTRIAL TRUCKS (PITs)
-
A. Equipment Inspections
-
B. Operator Qualified and Certified & Documentation of Training
-
C. Industrial Vehicles: Observed Operating at Safe Speeds
-
D. Industrial Vehicles: Observed Safe Loading & Unloading Practices
-
E. Horns & Back-Up Alarms are Equipped and can be heard clearly
-
F. Seat Belts are being worn by Operator
OTHER
-
A.
-
B.
-
C.
-
D.
Comments/Recommendations
-
Enter any corrective actions that will be undertaken
Sign Off
-
Safety Director / Representative
-
Project Manager
-
Site Coordinator
-
Subcontractor / Other
-
Subcontractor / Other
-
Subcontractor / Other
-
Select date