Information

  • Project/Job #:

  • Project Name:

  • Conducted on:

  • Prepared by:

  • Location
  • Contractors On Site:

DOCUMENTATION

  • A. Safety Manuals On Site

  • B. Safety Data Sheets (SDS's)

  • C. Safe Plan of Action (SPA) Completed

  • D. Safety Observation Report (SOR) Completed

JOB SITE POSTERS

  • A. All OSHA Required Posters

  • B. Emergency Action Plan Posted

  • C. Emergency Contacts List

WORK AREA / SITE PROTECTION

  • A. General Housekeeping

  • B. Walking - Working Surfaces

  • C. Unprotected Sides or Holes

  • D. Impalement Hazards

  • E.. Sanitary Facilities

  • F. Trash Receptacles / Waste Containers - Is Trash, Waste, and Scrap Material in Proper Containers

  • G. Material Storage/Lay Down

  • H. Conex Box, Gang Box

  • I. Lighting is Adequate

  • J. Overhead Work - Barricades In Place with Signage

  • K. Signs Posted - Constuction Area, PPE Requirements, Exits, Authorized Personnel Only, Danger, Caution etc.

  • L. General Public & Client Protection - Constuction Signs Posted, Perimeter Fencing, Appropriate Barricades etc.

HEALTH/FIRST AID

  • A. CPR/First AidTraining

  • B. First Aid Kit (No Expired Items)

  • E. Other

PERSONAL PROTECTIVE EQUIPMENT (PPE)

  • A. Hard Hats

  • B. Safety Glasses with Side Shields

  • C. Face Shield / Goggles (Cutting, Chipping or Grinding)

  • D. Respiratory Protection (If Required)

  • E. Hearing Protection (If required)

  • F. Clothing - High Visibility Shirts / Vest

  • G. Gloves

  • H. Foot Protection - Steel or Composite Toe Boots

  • I. Additional PPE

FALL PROTECTION

  • A. Trained Personnel (Competent Person)

  • B. Worn Properly and Used Correctly

  • C. Suitable Anchorage Points - Capable of Supporting 5000 Pounds

  • D. If Employees are using Fall Protection are they Tied Off 100%

  • E. Fall Protection Equipment Inspected Prior to Use

  • F. Stored Properly

  • G. Emergency Rescue Plan

  • H. Guardrails Installed Properly - Top Rail, Mid Rail, & Toe Board

  • I. Other

LADDERS

  • A. Safe Use - Base/Footing/Set Up - Firm, Level Surface

  • B. Inspected Prior to Use

  • C. Proper Ladder Type for Task

  • D. Extension Ladder Extends 3ft Above Landing & Secured

  • E. Step Ladder Used in "A" Frame, No Standing on Top Two Steps

HAND & POWER TOOLS

  • A. In Good Condition

  • B. Inspected Prior to Use

  • C. Proper Tools Used for each Job

  • D. Power Tools have the Appropriate Shield, Guards or Attachments as Recommended by the Manufacture

  • E. Are Cords in Good Condition & Ground Prongs In Place

  • F. Other:

AERIAL LIFTS

  • A. Trained Personnel (Competent Person)

  • B. Aerial Lifts Gates, Chains, Bar Secured and In Place

  • C. Aerial Lifts Operator's Feet On The Floor

  • D. Aerial Lift Operator Tied-Off and Using Proper Fall Protection Equipment

  • E. Aerial Lifts in Good Condition

  • F. Barricades In Place for Overhead Work

  • G. Employees Prohibited from Exiting Raised Lifts

  • H. Inspection of Equipment and Work Area

MATERIAL HANDLING & STORAGE

  • A. Materials are Properly Stored, Stacked & Cribbed

  • B. Lifting: Employees are Using Proper Lifting Methods

  • C. Aisle Spaces Maintained Around Stored Material

  • D. Storage Area Kept Clear of Scraps, Debris and Trash

ELECTRICAL

  • A. G.F.C.I.'s being Used

  • B. Extension Cords

  • C. Power Tools

  • D. Lock Out/Tag Out

  • E. Wiring & Cord Protection from Damage - Not Routed Through Pinch Points, Shape Edges or Vehicle Traffic

  • F. Energized Electrical Work by Qualified Person Following NFPA 70E Standards

  • G. Energized Panel Doors Not Left Open and Unattended

FIRE SAFETY / WELDING & CUTTING

  • A. Hot Work Permit (if required)

  • B. Fire Watch Assigned (Competent Person)

  • C. Fire Extinguisher/Inspected and In the Area

  • D. Combustibles removed/isolated

  • E. Hot Work Barricade / Fire Blankets / Welding Screens (if required)

  • F. Flammable Liquids - Properly Stored & Labeled / Gas Can(s) / Safety Cans (No Plastic Cans)

  • G. Oxygen & Acetylene Tanks Properly Secured

RIGGING AND HOISTING

  • A. Capacity Tags In Place and Legible

  • B. Hooks and Latches - Safety Latches In Place

  • C. Chain falls/Come-a-longs

  • D. Tag Lines

  • E. Inspected Prior to Use

  • F. Designated Qualified Rigger

  • G. Employees Not Working Under Suspended Loads

SCAFFOLD

  • A. Trained Personnel (Competent Person)

  • B. Hand and Mid-rails, Toeboards

  • C. Platform Decked/Secured

  • D. Level Footing/Set up

  • E. Access/Egress

  • F. Away from Powerlines

  • G. Barricades

  • H. Inspection/Tagged Correctly

CRANE EQUIPMENT

  • A. Annual Crane Inspection

  • B. Operator Manual

  • C. Crane Setup

  • D. Crane Swing Radius Barricaded

  • E. Flagman with Vest

  • F. Operator Qualified and Certified

  • G. Designated Qualified Signaller

  • H. Fall Zone Procedures

  • I. Lift Plan (if required)

EQUIPMENT / POWERED INDUSTRIAL TRUCKS (PITs)

  • A. Equipment Inspections

  • B. Operator Qualified and Certified & Documentation of Training

  • C. Industrial Vehicles: Observed Operating at Safe Speeds

  • D. Industrial Vehicles: Observed Safe Loading & Unloading Practices

  • E. Horns & Back-Up Alarms are Equipped and can be heard clearly

  • F. Seat Belts are being worn by Operator

OTHER

  • A.

  • B.

  • C.

  • D.

Comments/Recommendations

  • Enter any corrective actions that will be undertaken

Sign Off

  • Safety Director / Representative

  • Project Manager

  • Site Coordinator

  • Subcontractor / Other

  • Subcontractor / Other

  • Subcontractor / Other

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.