Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

DAILY TASKS

  • E 1.1.1(a) Check that all packaging materials food products have been removed from area / covered prior to start of cleaning.

  • A 4.1.5 Check temperature of hot water 100-140F at discharge hose using thermometer. Check by operating hose that pressure and volume of water is adequate for clean-up needs - water is flowing out of hose.

  • WATER TEMPERATURE:

  • A 4.1.5 Check pressure of water in high pressure tank by reading gauge 600-1000 psi.

  • PRESSURE:

  • B 2.2.3 Sanitation Staff-Authorized and trained personnel handling chemicals. Any re-training / training issues.

  • D 2.1.1(a), D 2.1.1(c) Observe Sanitation Staff to endure that GMP's are being followed - hand washing, no eating / drinking in production areas, no chewing gum / candy, no smoking, no jewellery, clean uniform, no evidence of communicable disease.

  • D 2.1.1(e) Observe employees with opened cuts, wounds / sores - not to handle exposed food / clean equipment; ensure first aid and water proof covering.

  • A 2.1.1(i) Observe sanitation activities - inedible equipment cleaned separate and before edible equipment.

  • E 1.1.1(a) Observe use of cleaning chemicals for correct use and cleaning / sanitizing procedures to ensure performed in accordance to sanitation manual.

  • B 2.2.3 Check chemical storage at end of sanitation - chemical room must be locked, all chemicals inside room, chemicals properly labelled / stored in designated containers, area clean, no odour.

  • NOTES;

  • DATE:

  • PCI SUPERVISOR SIGNATURE:

WEEKLY TASK

  • A 3.2.2(b), C 1.1.1(c) Sanitation Equipment - designed for intended use and properly maintained (no leaks / cracks in hoses, no damage).

  • NOTES:

  • DATE:

  • PCI SUPERVISOR SIGNATURE:

MONTHLY TASK

  • A 3.2.2(b) Sanitizer concentration - using titration kits check concentration of sanitizer < 200 ppm no rinse approval level.

  • CONCENTRATION %

  • CONCENTRATION PPM

  • NOTES:

  • DATE:

  • PCI SUPERVISOR SIGNATURE:

FOGGING

  • ZONE1 - CUT UP AREA

  • ZONE 2 - TRAY PAK

  • ZONE 3 - END OF TRAY PAK

  • ZONE 4 - BEGINNING OF BBQ

  • ZONE 5 - END OF BBQ AND MIDDLE OF FRESHOUSE

  • ZONE 6 - RTE COOK

  • ZONE 7 - RTE PACKAGING

  • ZONE 8 - TUNNEL ROOM

  • ZONE 9 - SPARE CONNECTION IN THE SYSTEM

  • NOTES:

  • DATE:

  • PCI SUPERVISOR SIGNATURE:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.