Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1.0 PARISIENNE LINE
-
1.1 CHUTE # 1
-
1.2 DESTONER
-
1.3 FIRST WASH TANK WITH SCREW
-
1.4 CHUT # 2
-
1.5 PEELER
-
1.6 PIPES
-
1.7 SECOND WASH TANK WITH WHITE CONVEYOR
-
1.8 PARISIENNE MACHINE
-
1.9 THIRD TANK WITH GREY BELT
-
1.10 MANUAL FEEDER
-
1.11 SORTING TABLE
-
1.12 LARGE RESERVOIR WITH WHITE BELT
-
1.13 PACKING MACHINE
-
1.14 FLOOR
-
1.15 DRAIN
-
1.16 WALLS
2.0 PROCESSING B EQUIPMENT
-
2.1 CHUT NEW LINE
-
2.3 NEW PEELER
-
2.4 RESERVOIR WITH CONVEYOR
-
2.5 ROLLER CONVEYOR
-
2.6 PACKING MACHINE
-
2.7 DICER
-
2.8 TABLE
-
2.9 CONTAINERS
-
2.10 WALLS
-
2.11 FLOORS
-
2.12 DOORS
-
2.13 DRAINS
-
2.2 WATER RESERVOIR WITH AUGER
-
NOTES:
-
DATE:
-
PCI SUPERVISOR SIGNATURE: