Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Enter Name, Position and Signature
-
To add text or photo information for "Yes" and "N/A" options double tap button.
People:
-
Persons wearing correct PPE
-
Track Protection Coordinators Book completed regularly
-
Safeworking Books completed for track protection and/or lookout working
-
Regular pre-start meetings or toolbox talks conducted
-
Persons on site properly inducted, including adequate site-specific inductions
-
Do staff have appropriate rail industry approved licensing/accreditation to perform their duties (ARTC SOC, RailCorp RISI, Conduction Induction Ticket etc)
-
Persons operating mobile plant and vehicles are properly licensed
-
Persons aware of site hazards, excavation and first aid procedures
-
Site Supervisor can describe the last incident and corrective actions taken
Plant & Vehicles:
-
Daily pre-start checks completed on all mobile plant
-
Operators properly licensed
-
Plant operators trained in the safe operating procedures (e.g. JSA / WMS)
-
Safe operating procedures freely available on site
-
Reversing kept to an absolute minimum
-
Spotters used correctly (e.g. while reversing etc)
-
3-meter distance maintained between moving plant and persons on foot
-
Safe speed maintained (brisk walking pace around persons on foot)
-
On site tipping properly controlled - Drivers provided with adequate instruction and supervision
-
Safe area established for on site cleaning of vehicles (signage in place)
-
Plant is fit for purpose, including correct guards, reversing alarms, lights etc
-
Plant maintained to a acceptable standard, including general housekeeping
-
Persons maintain a distance of at least 1.2 meters from passing public traffic
Processes & Housekeeping:
-
Worksite risk assessment conducted and reviewed on a daily basis
-
Traffic Management Plan in place (documented) - Controls in place as per plan
-
Unsafe plant/equipment tagged out
-
Isolation, lock-out and tag-out applied during maintenance and repairs
-
Electrical equipment tagged, tested and fit for purpose
-
Emergency equipment available and serviced (e.g. Extinguishers / first aid kits)
-
Manual handling risks adequately controlled (e.g. mechanical aids, correct lifting techniques, job rotation etc)
-
Overhead wires identified and controlled (e.g. demarcated)
-
Excavations identified and controlled
-
Housekeeping maintained to an acceptable standard
-
Worksite amenities adequate (e.g. drinking water, toilets, shelters etc)
Contractor Management:
-
Contractors authorised to commence work (i.e. ATWP or Authority to Work Register)
-
Contractors possess induction card and have completed site-specific induction
-
Contractors possess necessary licenses/competency certificates
-
Contractors trained in safe work procedures and these are available on site
Environment:
-
Waste disposal adequate (e.g. rubbish bins provided and used)
-
Noise levels reduced as far as possible
-
Are sediment controls in place where applicable; note what controls are in place
-
Has vegetation regrowth been implemented.
-
Spills cleaned up adequately
-
Is dust suppression required and adequate.
-
Drums and bulk storage vessels properly bunded
-
Air emissions reduced as much as possible
Other Issues Identified:
-
Please complete section below and highlight any additional observations and actions
-
Please add photo if required
-
Please sketch diagram if required
-
Distribution: Zero Harm Observation (ZeroHarm.Reporting@downerediworks.com.au); Harley Taylor (Health and Safety Coordinator); Relevant Manager and/or Supervissor