Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Lounge room

  • A any of the item still from construction

  • Painting

  • Floor tiling if done by Fowler Homes

  • Setting and sanding not visible through paint work

  • All power points and light switches

  • Skirting and architrave

Bedroom 1

  • Painting

  • Skirting and architrave joints and mites

  • Door and door handle in working condition

  • Glass and window frame free of scratches

  • Skirting and architrave

Bedroom 2

  • Painting

  • Skirting and architrave joints and mites

  • Door and door handle in working condition

  • Glass and window frame free of scratches

  • Skirting and architrave

Bedroom 3

  • Painting

  • Skirting and architrave joints and mites

  • Door and door handle in working condition

  • Glass and window frame free of scratches

  • Skirting and architrave

Bedroom 4

  • Painting

  • Skirting and architrave joints and mites

  • Door and door handle in working condition

  • Glass and window frame free of scratches

  • Skirting and architrave

Bedroom 5

  • Painting

  • Skirting and architrave joints and mites

  • Door and door handle in working condition

  • Glass and window frame free of scratches

  • Skirting and architrave

Alfresco

  • The ceiling is free of settlement cracks

  • Floor covering is free of lips and grout joints a full and clean (if done by Fowler Homes)

  • The brick work is clean and free of chips

Hallway

  • Skirting and architrave

  • Free of settlement cracks

  • Setting on all neches and bulkheads

  • Painting is of good quality

  • Front door lock

Dining room

  • Painting

  • Setting and sanding

  • Power points and switches

  • Skirting and architrave

  • Tile lips and grout joints

Other

  • Stair treads in good condition

  • Skirting and architrave

  • Grab rail and void

Kitchen

  • Sink and tap were free of scratches

  • Bench top free of stains and scratches

  • Cupboard doors free of chips and scratches <br><br>

  • Draws and runners working correctly

  • Splash back and power point cutouts

External

  • Brick pointing

  • Down pipe brackets

  • Angles

  • Landscaping

Laundry

  • External door

  • Floor and wall tiling

  • Skirting and architrave

  • Cupboards

Main bath room

  • Painting

  • Setting and sanding

  • Tile lips and grout joints

  • Toilet

  • Shower screen

  • Vanity

Ensuite

  • Painting

  • Sanding and setting

  • Tile lips and grout joints

  • Toilet

  • Shower screen

  • Vanity

  • Client Sign off

  • Please be advised that this maintenance audit will finalize your 13 week maintenance request and can not be altered

  • Client's signature

  • Fowler Homes representative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.