Information

  • Document No.

  • STW east R&M

General information

  • SAP Order nr

  • Maygurney order nr

  • Grid ref X

  • Grid ref Y

  • Address

  • Site location
  • Postcode

  • County

  • Manhole inspection ?

Manhole Inspection

  • Manhole number ( if known)

  • Start date / time

  • Finish date / time

  • Crew on site

  • HIGHWAY / PRIVATE / OTHER

  • Manhole type

  • Surface type

  • Description of works / comments

  • Section 81?

  • STW Asset?

  • Transferred Asset?

  • FOW required

  • Customer name

  • Customer mobile nr

  • Customer contact nr

  • PTD Signed

  • Can we carry out works at any time<br>

  • Access details

  • Reason for no PTD

  • Access details

  • Is job a P1 , 2 , 3 or 4

  • Have you contacted either MARK / STEVE or NIGEL

  • Scheduler called to raise job?<br>

  • Has the area been left safe

  • Protection in place ?

  • Why not safe ?

  • FOW Priority

  • Replace or Reset?

  • Cover type

  • Cover defect

  • FOW Traffic management

  • Approximate length of reinstatement required

  • Approximate width of reinstatement required

  • Manhole cover size

  • Are any manhole cover dimensions greater than 675 mm

  • Any manhole cover dimensions greater than 1300 mm

  • Schedule 13 quote required Non standard cover order required
  • Cover lifted

  • Manhole cover depth

  • Reason why not lifted

  • Customer Special Requirements?

  • Details

Specific Site detail Information

  • Road markings

  • Markings detail

  • Surface treatment ?

  • Surface treatment type

  • Road Width?

  • Distance from nearest kerb to nearest edge of reinstatement

  • Distance from nearest kerb to furthest edge of reinstatement

  • Length of working area required for traffic management

  • Clear visibilty up road in metres

  • Clear visibilty down road in metres

  • Bus Stop within 50m?

  • Traffic Control within 50m?

  • Traffic control alterations required ?<br>

  • Any parked cars at time?

  • Could cars park ANY time?

  • Speed limit

  • Parking suspension

  • Any hand dig required?

  • Traced and Marked?

Safety Information

  • Overhead Power?

  • Lamp Support Required?

  • Confined Space Working?

  • Any Other Safety Information?

  • Mitigation inspection?

  • Start date / time

  • Is problem associated with STW asset

  • Customer name

  • Customer mobile nr

  • Customer contact nr

  • Customer type

  • Property type ?

  • Areas of property to be protected

  • Details of flooding encountered

  • Is protection possible ?

  • Mitigation requirements / possibilities

  • Type of protection

  • Design detail proposals

  • Sketch of proposals

  • Customer special requirements with respect to mitigation measures

  • Is customer willing to agree to mitigation work

  • I / We agree to the afore mentioned works

  • PTD Signed

  • Can we carry out works at any time<br>

  • Access details

  • Reason for no PTD

  • Access details

  • Customer Special Requirements with respect to access

  • Details

  • Explanation of reasons

  • Source of problem

  • Notes:

  • Description of works / comments

  • Draw sketch here if required.

  • Location photos

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.