Title Page
-
Conducted on
-
Prepared by Alin Tita
-
Location
-
Add location
Installation refurbishment
East Tower
-
Please choose Elevation
-
Select Cradle
-
Select Panel
- Panel 1
- Panel 2
- Panel 3
- Panel 4
- Panel 5
- Panel 6
- Panel 7
- Panel 8
- Panel 9
-
Inspect panel integrity prior to removal taking care of all loose and degraded parts. Precondition evidence.
-
Remove retaining trim to relating and interfacing panels, store reuseable parts and waste separately
-
Remove all non-required substructure for old panels and clean back panel to element.
-
Clean and seal element back panel as per installation details using only detailed cleaner and sealant.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Cut existing insulation at bracket location to allow bracket level changes.
-
Clean area at bracket location and seal original fixing holes.
-
Refix bracket to new datum level -15mm to suite panel interface with existing soffit and seal all fixings.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Ensure any pre-drilling for new fixings is done to the correct size and all fixings are secured correctly and sealed. Make sure countersunk screws are used where clashes with the hookpoint.
-
Install new subframe detail as per installation details.
-
Ensure only detailed and approved Sika products are used as specified in the approved details.
-
Hold point for backing panel and subframe inspection.
-
<br>Inspect the paint finish of the new cladding aluminium panel prior to installation.
-
Install the new cladding panel as per installation detail and secure security screws and head angle.
-
Install the new cladding panel as per installation detail and secure it. Pressure plate in place.
-
Ensure all securing details are correct before signing off panel.
-
Reinstate any items removed from the main façade element if required.
-
Clean panel and desnag-handover.
-
Ensure all QA paperwork is complete, signed off and filed in the appropriate file.
-
-
Inspect panel integrity prior to removal taking care of all loose and degraded parts. Precondition evidence.
-
Remove retaining trim to relating and interfacing panels, store reuseable parts and waste separately
-
Remove all non-required substructure for old panels and clean back panel to element.
-
Clean and seal element back panel as per installation details using only detailed cleaner and sealant.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Cut existing insulation at bracket location to allow bracket level changes.
-
Clean area at bracket location and seal original fixing holes.
-
Refix bracket to new datum level -15mm to suite panel interface with existing soffit and seal all fixings.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Ensure any pre-drilling for new fixings is done to the correct size and all fixings are secured correctly and sealed. Make sure countersunk screws are used where clashes with the hookpoint.
-
Install new subframe detail as per installation details.
-
Ensure only detailed and approved Sika products are used as specified in the approved details.
-
Hold point for backing panel and subframe inspection.
-
<br>Inspect the paint finish of the new cladding aluminium panel prior to installation.
-
Install the new cladding panel as per installation detail and secure security screws and head angle.
-
Install the new cladding panel as per installation detail and secure it. Pressure plate in place.
-
Ensure all securing details are correct before signing off panel.
-
Reinstate any items removed from the main façade element if required.
-
Clean panel and desnag-handover.
-
Ensure all QA paperwork is complete, signed off and filed in the appropriate file.
-
-
Inspect panel integrity prior to removal taking care of all loose and degraded parts. Precondition evidence.
-
Remove retaining trim to relating and interfacing panels, store reuseable parts and waste separately
-
Remove all non-required substructure for old panels and clean back panel to element.
-
Clean and seal element back panel as per installation details using only detailed cleaner and sealant.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Cut existing insulation at bracket location to allow bracket level changes.
-
Clean area at bracket location and seal original fixing holes.
-
Refix bracket to new datum level -15mm to suite panel interface with existing soffit and seal all fixings.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Ensure any pre-drilling for new fixings is done to the correct size and all fixings are secured correctly and sealed. Make sure countersunk screws are used where clashes with the hookpoint.
-
Install new subframe detail as per installation details.
-
Ensure only detailed and approved Sika products are used as specified in the approved details.
-
Hold point for backing panel and subframe inspection.
-
<br>Inspect the paint finish of the new cladding aluminium panel prior to installation.
-
Install the new cladding panel as per installation detail and secure security screws and head angle.
-
Install the new cladding panel as per installation detail and secure it. Pressure plate in place.
-
Ensure all securing details are correct before signing off panel.
-
Reinstate any items removed from the main façade element if required.
-
Clean panel and desnag-handover.
-
Ensure all QA paperwork is complete, signed off and filed in the appropriate file.
-
-
Inspect panel integrity prior to removal taking care of all loose and degraded parts. Precondition evidence.
-
Remove retaining trim to relating and interfacing panels, store reuseable parts and waste separately
-
Remove all non-required substructure for old panels and clean back panel to element.
-
Clean and seal element back panel as per installation details using only detailed cleaner and sealant.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Cut existing insulation at bracket location to allow bracket level changes.
-
Clean area at bracket location and seal original fixing holes.
-
Refix bracket to new datum level -15mm to suite panel interface with existing soffit and seal all fixings.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Ensure any pre-drilling for new fixings is done to the correct size and all fixings are secured correctly and sealed. Make sure countersunk screws are used where clashes with the hookpoint.
-
Install new subframe detail as per installation details.
-
Ensure only detailed and approved Sika products are used as specified in the approved details.
-
Hold point for backing panel and subframe inspection.
-
<br>Inspect the paint finish of the new cladding aluminium panel prior to installation.
-
Install the new cladding panel as per installation detail and secure security screws and head angle.
-
Install the new cladding panel as per installation detail and secure it. Pressure plate in place.
-
Ensure all securing details are correct before signing off panel.
-
Reinstate any items removed from the main façade element if required.
-
Clean panel and desnag-handover.
-
Ensure all QA paperwork is complete, signed off and filed in the appropriate file.
-
-
Inspect panel integrity prior to removal taking care of all loose and degraded parts. Precondition evidence.
-
Remove retaining trim to relating and interfacing panels, store reuseable parts and waste separately
-
Remove all non-required substructure for old panels and clean back panel to element.
-
Clean and seal element back panel as per installation details using only detailed cleaner and sealant.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Cut existing insulation at bracket location to allow bracket level changes.
-
Clean area at bracket location and seal original fixing holes.
-
Refix bracket to new datum level -15mm to suite panel interface with existing soffit and seal all fixings.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Ensure any pre-drilling for new fixings is done to the correct size and all fixings are secured correctly and sealed. Make sure countersunk screws are used where clashes with the hookpoint.
-
Install new subframe detail as per installation details.
-
Ensure only detailed and approved Sika products are used as specified in the approved details.
-
Hold point for backing panel and subframe inspection.
-
<br>Inspect the paint finish of the new cladding aluminium panel prior to installation.
-
Install the new cladding panel as per installation detail and secure security screws and head angle.
-
Install the new cladding panel as per installation detail and secure it. Pressure plate in place.
-
Ensure all securing details are correct before signing off panel.
-
Reinstate any items removed from the main façade element if required.
-
Clean panel and desnag-handover.
-
Ensure all QA paperwork is complete, signed off and filed in the appropriate file.
-
-
Inspect panel integrity prior to removal taking care of all loose and degraded parts. Precondition evidence.
-
Remove retaining trim to relating and interfacing panels, store reuseable parts and waste separately
-
Remove all non-required substructure for old panels and clean back panel to element.
-
Clean and seal element back panel as per installation details using only detailed cleaner and sealant.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Cut existing insulation at bracket location to allow bracket level changes.
-
Clean area at bracket location and seal original fixing holes.
-
Refix bracket to new datum level -15mm to suite panel interface with existing soffit and seal all fixings.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Ensure any pre-drilling for new fixings is done to the correct size and all fixings are secured correctly and sealed. Make sure countersunk screws are used where clashes with the hookpoint.
-
Install new subframe detail as per installation details.
-
Ensure only detailed and approved Sika products are used as specified in the approved details.
-
Hold point for backing panel and subframe inspection.
-
<br>Inspect the paint finish of the new cladding aluminium panel prior to installation.
-
Install the new cladding panel as per installation detail and secure security screws and head angle.
-
Install the new cladding panel as per installation detail and secure it. Pressure plate in place.
-
Ensure all securing details are correct before signing off panel.
-
Reinstate any items removed from the main façade element if required.
-
Clean panel and desnag-handover.
-
Ensure all QA paperwork is complete, signed off and filed in the appropriate file.
-
-
Inspect panel integrity prior to removal taking care of all loose and degraded parts. Precondition evidence.
-
Remove retaining trim to relating and interfacing panels, store reuseable parts and waste separately
-
Remove all non-required substructure for old panels and clean back panel to element.
-
Clean and seal element back panel as per installation details using only detailed cleaner and sealant.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Cut existing insulation at bracket location to allow bracket level changes.
-
Clean area at bracket location and seal original fixing holes.
-
Refix bracket to new datum level -15mm to suite panel interface with existing soffit and seal all fixings.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Ensure any pre-drilling for new fixings is done to the correct size and all fixings are secured correctly and sealed. Make sure countersunk screws are used where clashes with the hookpoint.
-
Install new subframe detail as per installation details.
-
Ensure only detailed and approved Sika products are used as specified in the approved details.
-
Hold point for backing panel and subframe inspection.
-
<br>Inspect the paint finish of the new cladding aluminium panel prior to installation.
-
Install the new cladding panel as per installation detail and secure security screws and head angle.
-
Install the new cladding panel as per installation detail and secure it. Pressure plate in place.
-
Ensure all securing details are correct before signing off panel.
-
Reinstate any items removed from the main façade element if required.
-
Clean panel and desnag-handover.
-
Ensure all QA paperwork is complete, signed off and filed in the appropriate file.
-
-
Inspect panel integrity prior to removal taking care of all loose and degraded parts. Precondition evidence.
-
Remove retaining trim to relating and interfacing panels, store reuseable parts and waste separately
-
Remove all non-required substructure for old panels and clean back panel to element.
-
Clean and seal element back panel as per installation details using only detailed cleaner and sealant.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Cut existing insulation at bracket location to allow bracket level changes.
-
Clean area at bracket location and seal original fixing holes.
-
Refix bracket to new datum level -15mm to suite panel interface with existing soffit and seal all fixings.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Ensure any pre-drilling for new fixings is done to the correct size and all fixings are secured correctly and sealed. Make sure countersunk screws are used where clashes with the hookpoint.
-
Install new subframe detail as per installation details.
-
Ensure only detailed and approved Sika products are used as specified in the approved details.
-
Hold point for backing panel and subframe inspection.
-
<br>Inspect the paint finish of the new cladding aluminium panel prior to installation.
-
Install the new cladding panel as per installation detail and secure security screws and head angle.
-
Install the new cladding panel as per installation detail and secure it. Pressure plate in place.
-
Ensure all securing details are correct before signing off panel.
-
Reinstate any items removed from the main façade element if required.
-
Clean panel and desnag-handover.
-
Ensure all QA paperwork is complete, signed off and filed in the appropriate file.
-
-
Inspect panel integrity prior to removal taking care of all loose and degraded parts. Precondition evidence.
-
Remove retaining trim to relating and interfacing panels, store reuseable parts and waste separately
-
Remove all non-required substructure for old panels and clean back panel to element.
-
Clean and seal element back panel as per installation details using only detailed cleaner and sealant.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Cut existing insulation at bracket location to allow bracket level changes.
-
Clean area at bracket location and seal original fixing holes.
-
Refix bracket to new datum level -15mm to suite panel interface with existing soffit and seal all fixings.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Ensure any pre-drilling for new fixings is done to the correct size and all fixings are secured correctly and sealed. Make sure countersunk screws are used where clashes with the hookpoint.
-
Install new subframe detail as per installation details.
-
Ensure only detailed and approved Sika products are used as specified in the approved details.
-
Hold point for backing panel and subframe inspection.
-
<br>Inspect the paint finish of the new cladding aluminium panel prior to installation.
-
Install the new cladding panel as per installation detail and secure security screws and head angle.
-
Install the new cladding panel as per installation detail and secure it. Pressure plate in place.
-
Ensure all securing details are correct before signing off panel.
-
Reinstate any items removed from the main façade element if required.
-
Clean panel and desnag-handover.
-
Ensure all QA paperwork is complete, signed off and filed in the appropriate file.
-
Elevation
West elevation
Panel 1
Floor 2a
Untitled page
Elevation
West elevation
Untitled page
Page 1
Panel number: 1
-
Inspect panel integrity prior to removal taking care of all loose and degraded parts. Precondition evidence.
-
Remove retaining trim to relating and interfacing panels, store reuseable parts and waste separately
-
Remove all non-required substructure for old panels and clean back panel to element.
-
Clean and seal element back panel as per installation details using only detailed cleaner and sealant.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Cut existing insulation at bracket location to allow bracket level changes.
-
Clean area at bracket location and seal original fixing holes.
-
Refix bracket to new datum level -15mm to suite panel interface with existing soffit and seal all fixings.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Ensure any pre-drilling for new fixings is done to the correct size and all fixings are secured correctly and sealed. Make sure countersunk screws are used where clashes with the hookpoint.
-
Install new subframe detail as per installation details.
-
Ensure only detailed and approved Sika products are used as specified in the approved details.
-
Hold point for backing panel and subframe inspection.
-
<br>Inspect the paint finish of the new cladding aluminium panel prior to installation.
-
Install the new cladding panel as per installation detail and secure security screws and head angle.
-
Install the new cladding panel as per installation detail and secure it. Pressure plate in place.
-
Ensure all securing details are correct before signing off panel.
-
Reinstate any items removed from the main façade element if required.
-
Clean panel and desnag-handover.
-
Ensure all QA paperwork is complete, signed off and filed in the appropriate file.
-
Panel number 2
-
Inspect panel integrity prior to removal taking care of all loose and degraded parts. Precondition evidence.
-
Remove retaining trim to relating and interfacing panels, store reuseable parts and waste separately
-
Remove all non-required substructure for old panels and clean back panel to element.
-
Clean and seal element back panel as per installation details using only detailed cleaner and sealant.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Cut existing insulation at bracket location to allow bracket level changes.
-
Clean area at bracket location and seal original fixing holes.
-
Refix bracket to new datum level -15mm to suite panel interface with existing soffit and seal all fixings.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Ensure any pre-drilling for new fixings is done to the correct size and all fixings are secured correctly and sealed. Make sure countersunk screws are used where clashes with the hookpoint.
-
Install new subframe detail as per installation details.
-
Ensure only detailed and approved Sika products are used as specified in the approved details.
-
Hold point for backing panel and subframe inspection.
-
<br>Inspect the paint finish of the new cladding aluminium panel prior to installation.
-
Install the new cladding panel as per installation detail and secure security screws and head angle.
-
Install the new cladding panel as per installation detail and secure it. Pressure plate in place.
-
Ensure all securing details are correct before signing off panel.
-
Reinstate any items removed from the main façade element if required.
-
Clean panel and desnag-handover.
-
Ensure all QA paperwork is complete, signed off and filed in the appropriate file.
Panel number 3
-
Inspect panel integrity prior to removal taking care of all loose and degraded parts. Precondition evidence.
-
Remove retaining trim to relating and interfacing panels, store reuseable parts and waste separately
-
Remove all non-required substructure for old panels and clean back panel to element.
-
Clean and seal element back panel as per installation details using only detailed cleaner and sealant.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Cut existing insulation at bracket location to allow bracket level changes.
-
Clean area at bracket location and seal original fixing holes.
-
Refix bracket to new datum level -15mm to suite panel interface with existing soffit and seal all fixings.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Ensure any pre-drilling for new fixings is done to the correct size and all fixings are secured correctly and sealed. Make sure countersunk screws are used where clashes with the hookpoint.
-
Install new subframe detail as per installation details.
-
Ensure only detailed and approved Sika products are used as specified in the approved details.
-
Hold point for backing panel and subframe inspection.
-
<br>Inspect the paint finish of the new cladding aluminium panel prior to installation.
-
Install the new cladding panel as per installation detail and secure security screws and head angle.
-
Install the new cladding panel as per installation detail and secure it. Pressure plate in place.
-
Ensure all securing details are correct before signing off panel.
-
Reinstate any items removed from the main façade element if required.
-
Clean panel and desnag-handover.
-
Ensure all QA paperwork is complete, signed off and filed in the appropriate file.
Panel number 4
-
Inspect panel integrity prior to removal taking care of all loose and degraded parts. Precondition evidence.
-
Remove retaining trim to relating and interfacing panels, store reuseable parts and waste separately
-
Remove all non-required substructure for old panels and clean back panel to element.
-
Clean and seal element back panel as per installation details using only detailed cleaner and sealant.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Cut existing insulation at bracket location to allow bracket level changes.
-
Clean area at bracket location and seal original fixing holes.
-
Refix bracket to new datum level -15mm to suite panel interface with existing soffit and seal all fixings.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Ensure any pre-drilling for new fixings is done to the correct size and all fixings are secured correctly and sealed. Make sure countersunk screws are used where clashes with the hookpoint.
-
Install new subframe detail as per installation details.
-
Ensure only detailed and approved Sika products are used as specified in the approved details.
-
Hold point for backing panel and subframe inspection.
-
<br>Inspect the paint finish of the new cladding aluminium panel prior to installation.
-
Install the new cladding panel as per installation detail and secure security screws and head angle.
-
Install the new cladding panel as per installation detail and secure it. Pressure plate in place.
-
Ensure all securing details are correct before signing off panel.
-
Reinstate any items removed from the main façade element if required.
-
Clean panel and desnag-handover.
-
Ensure all QA paperwork is complete, signed off and filed in the appropriate file.
Panel number 5
-
Inspect panel integrity prior to removal taking care of all loose and degraded parts. Precondition evidence.
-
Remove retaining trim to relating and interfacing panels, store reuseable parts and waste separately
-
Remove all non-required substructure for old panels and clean back panel to element.
-
Clean and seal element back panel as per installation details using only detailed cleaner and sealant.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Cut existing insulation at bracket location to allow bracket level changes.
-
Clean area at bracket location and seal original fixing holes.
-
Refix bracket to new datum level -15mm to suite panel interface with existing soffit and seal all fixings.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Ensure any pre-drilling for new fixings is done to the correct size and all fixings are secured correctly and sealed. Make sure countersunk screws are used where clashes with the hookpoint.
-
Install new subframe detail as per installation details.
-
Ensure only detailed and approved Sika products are used as specified in the approved details.
-
Hold point for backing panel and subframe inspection.
-
<br>Inspect the paint finish of the new cladding aluminium panel prior to installation.
-
Install the new cladding panel as per installation detail and secure security screws and head angle.
-
Install the new cladding panel as per installation detail and secure it. Pressure plate in place.
-
Ensure all securing details are correct before signing off panel.
-
Reinstate any items removed from the main façade element if required.
-
Clean panel and desnag-handover.
-
Ensure all QA paperwork is complete, signed off and filed in the appropriate file.
Panel number 6
-
Inspect panel integrity prior to removal taking care of all loose and degraded parts. Precondition evidence.
-
Remove retaining trim to relating and interfacing panels, store reuseable parts and waste separately
-
Remove all non-required substructure for old panels and clean back panel to element.
-
Clean and seal element back panel as per installation details using only detailed cleaner and sealant.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Cut existing insulation at bracket location to allow bracket level changes.
-
Clean area at bracket location and seal original fixing holes.
-
Refix bracket to new datum level -15mm to suite panel interface with existing soffit and seal all fixings.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Ensure any pre-drilling for new fixings is done to the correct size and all fixings are secured correctly and sealed. Make sure countersunk screws are used where clashes with the hookpoint.
-
Install new subframe detail as per installation details.
-
Ensure only detailed and approved Sika products are used as specified in the approved details.
-
Hold point for backing panel and subframe inspection.
-
<br>Inspect the paint finish of the new cladding aluminium panel prior to installation.
-
Install the new cladding panel as per installation detail and secure security screws and head angle.
-
Install the new cladding panel as per installation detail and secure it. Pressure plate in place.
-
Ensure all securing details are correct before signing off panel.
-
Reinstate any items removed from the main façade element if required.
-
Clean panel and desnag-handover.
-
Ensure all QA paperwork is complete, signed off and filed in the appropriate file.
Panel number 7
-
Inspect panel integrity prior to removal taking care of all loose and degraded parts. Precondition evidence.
-
Remove retaining trim to relating and interfacing panels, store reuseable parts and waste separately
-
Remove all non-required substructure for old panels and clean back panel to element.
-
Clean and seal element back panel as per installation details using only detailed cleaner and sealant.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Cut existing insulation at bracket location to allow bracket level changes.
-
Clean area at bracket location and seal original fixing holes.
-
Refix bracket to new datum level -15mm to suite panel interface with existing soffit and seal all fixings.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Ensure any pre-drilling for new fixings is done to the correct size and all fixings are secured correctly and sealed. Make sure countersunk screws are used where clashes with the hookpoint.
-
Install new subframe detail as per installation details.
-
Ensure only detailed and approved Sika products are used as specified in the approved details.
-
Hold point for backing panel and subframe inspection.
-
<br>Inspect the paint finish of the new cladding aluminium panel prior to installation.
-
Install the new cladding panel as per installation detail and secure security screws and head angle.
-
Install the new cladding panel as per installation detail and secure it. Pressure plate in place.
-
Ensure all securing details are correct before signing off panel.
-
Reinstate any items removed from the main façade element if required.
-
Clean panel and desnag-handover.
-
Ensure all QA paperwork is complete, signed off and filed in the appropriate file.
Panel number 8
-
Inspect panel integrity prior to removal taking care of all loose and degraded parts. Precondition evidence.
-
Remove retaining trim to relating and interfacing panels, store reuseable parts and waste separately
-
Remove all non-required substructure for old panels and clean back panel to element.
-
Clean and seal element back panel as per installation details using only detailed cleaner and sealant.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Cut existing insulation at bracket location to allow bracket level changes.
-
Clean area at bracket location and seal original fixing holes.
-
Refix bracket to new datum level -15mm to suite panel interface with existing soffit and seal all fixings.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Ensure any pre-drilling for new fixings is done to the correct size and all fixings are secured correctly and sealed. Make sure countersunk screws are used where clashes with the hookpoint.
-
Install new subframe detail as per installation details.
-
Ensure only detailed and approved Sika products are used as specified in the approved details.
-
Hold point for backing panel and subframe inspection.
-
<br>Inspect the paint finish of the new cladding aluminium panel prior to installation.
-
Install the new cladding panel as per installation detail and secure security screws and head angle.
-
Install the new cladding panel as per installation detail and secure it. Pressure plate in place.
-
Ensure all securing details are correct before signing off panel.
-
Reinstate any items removed from the main façade element if required.
-
Clean panel and desnag-handover.
-
Ensure all QA paperwork is complete, signed off and filed in the appropriate file.
Panel number 9
-
Inspect panel integrity prior to removal taking care of all loose and degraded parts. Precondition evidence.
-
Remove retaining trim to relating and interfacing panels, store reuseable parts and waste separately
-
Remove all non-required substructure for old panels and clean back panel to element.
-
Clean and seal element back panel as per installation details using only detailed cleaner and sealant.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Cut existing insulation at bracket location to allow bracket level changes.
-
Clean area at bracket location and seal original fixing holes.
-
Refix bracket to new datum level -15mm to suite panel interface with existing soffit and seal all fixings.
-
Check backing panel for any holes in material and sealant detail, evidence and repair.
-
Ensure any pre-drilling for new fixings is done to the correct size and all fixings are secured correctly and sealed. Make sure countersunk screws are used where clashes with the hookpoint.
-
Install new subframe detail as per installation details.
-
Ensure only detailed and approved Sika products are used as specified in the approved details.
-
Hold point for backing panel and subframe inspection.
-
<br>Inspect the paint finish of the new cladding aluminium panel prior to installation.
-
Install the new cladding panel as per installation detail and secure security screws and head angle.
-
Install the new cladding panel as per installation detail and secure it. Pressure plate in place.
-
Ensure all securing details are correct before signing off panel.
-
Reinstate any items removed from the main façade element if required.
-
Clean panel and desnag-handover.
-
Ensure all QA paperwork is complete, signed off and filed in the appropriate file.