Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • Model/Floorplan of Unit Inspected

  • Serial Number of Unit Inspected

undefined

  • Document Number

30A/50A Power Inlet Install

  • Is the inlet in installable condition?

  • Is the outer jacketing stripped back approximately 1.5"?

  • Is the inner conductor jacketing stripped back approximately .75"?

  • Are the load, neutral, equipment ground wires in the proper location?

  • Are the load, neutral, equipment ground wires seated properly within lug?

  • Does the conductor wire jacketing land under the terminal?

  • Is bare copper from the conductor wire showing above the opening flange?

  • Are the lugs torqued to the proper install torque rating? 30A Inlet - 20IN.LBS. / 50A Inlet - 35IN.LBS.

  • Was the power inlet secured to unit w/o damage to housing?

undefined

  • Installer

  • Installer Signature

  • Plant Manager

  • Plant Manager Signature

  • Auditor

  • Auditor Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.