Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Model/Floorplan of Unit Inspected
-
Serial Number of Unit Inspected
undefined
-
Document Number
Breakaway Switch Installation
Installation
-
Breakaway Switch is Not Damaged and in Installable Condition
-
Breakaway Switch Housing Assembly Secured to Chassis via Screw through Mounting Hole on Fixed Metal Plate
-
Plunger is Properly Seated Into the Switch Housing
-
Power Leads are Properly Connected to the Battery Lead and Break-Away Box
Sign Off
-
Installer
-
Installer Signature
-
Plant Manager
-
Plant Manager Signature
-
Auditor
-
Auditor Signature