Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Shelving
-
Take a photo of cabinet so as to ID for reference
-
Screw self tappers into the bottom frame , 2 each side <br>CT Cabinets only. <br>
-
Check shelf layout with plan , ensure shelves are in correct position <br>
Patch Panels and 15 Way Frame
-
Wire 16 Port Patch Panel with 25 pair and 10 pair .<br>Wire the first 6 Ports of the Patch Panel using the 25 pair cable. <br>Wire the last 10 sockets ,using the 10 pair on pair 4&5 only.
-
Install 15 Way Krone Frame
-
Install the wired 16 Port Patch Panel.<br>Run 25 pair / 10 pair around the back of 15 way frame. And terminate back to "B " side.<br>Ensure Velcro is wrapped around sharp edge.
-
Run Cat 5 from 15 Way frame to 3 rd bottom shelf and fit off a Mode 3 Socket . White 2 - Blue 6 ~~~~~~~ White 1 - Orange 5<br>Ensure it is wired to position 27,28,29,30
-
Install all equipment into bare cabinet these include:-<br>2 x 24 Port Panel <br>Shelving <br>Cable Management <br>
-
Ensure that you allow a 3 rd. Patch Panel to make up 72 Port Patch Panel <br>Cover up this position with a Blanking Plate
-
Label 16 Port Patch Panel.
-
Label 2 nd. Patch Panel 25 to 48
-
Make up record book and fit wire and lug ,install on front door.
-
Jumper 15 Way frame as per Record Book.
-
Test all jumper with Tone set
Power Rails
-
Install 2 x 10 Way Power Rails.<br>Make sure these power are installed in the correct position.<br>Ensuring that they clear any equipment :- follow the shelving layout
Miscellaneous
-
Reinstall front door and side doors. <br>
-
Run 3 mtr Pink Patch Lead from the Second bottom shelf to Switch position
-
Make up stainless steel wire for Record book and front door key.
-
Ensure Key Safe is Programed up to Store Number <br>Ensure override key is inside.<br>Attach key safe to bottom cable management.
-
Install earth bar
-
Have a final visual check of the cabinet.
-
Tape key to front door.
-
Pack with bubble wrap first ,cardboard then shrink wrap.