Title Page

  • Job Number

  • Audit Type

  • Conducted on

  • Site Manager

  • Location

  • Contractor

  • 1. Articulation Joints as per plan and continuous from rebate to the top of wall?

  • 2. Are Articulation Joints clear of mortar etc?

  • 3. Have the correct expansion ties been used at 600 centres in the AJs?<br>

  • 4. Have wall ties been screwed to frame at 600 centers max, 300 at doors and windows?

  • 5. Has only hydrated lime been used? <br>Note: Liquid lime is not to be used

  • 6. Are all walls plumb?

  • 7. Are piers straight, square and plumb?

  • 8. Is the fascia hard to the brickwork?

  • 9. Have weep holes been installed at a maximum of 1.2m centres?

  • Note: (DS) no weep holes are to be within the ceiling space (lower roof)

  • Note: No weep holes above openings less than 1m in width or the meter box

  • Note: Perps no more than 15mm deviation in 2m

  • 10. Weepholes are only to be installed above windows and doors with more than 3 courses of bricks, and over 1m in width. Has this been completed?

  • 11. Are perpends within 10mm tolerance? (min 5mm and max 15mm, with no more than 8mm deviation in any wall)

  • 12. Has the DPC flashing been installed 5mm (max) from the face of the brickwork?

  • 13. Has DPC been raised one course to FFL at porch and alfresco?

  • 14. Are bed joints within tolerance? - 10mm + or – 3mm Note: base 25mm max

  • 15. Is there any brick overhang greater than 15mm?

  • 16. Is there any excess concrete?

  • 17. Are brick sills as per detail? - 10mm past face of brick wall at bottom and 20mm at the top

  • 18. Is there correct clearance under all windows? - ensure no flashes have been pulled out

  • 19. Is mortar colour consistent and has the bricklayer bucket been measured?

  • 20. Have window rubbers been installed correctly and not compressed?

  • 21. Have flashings been installed above all openings?

  • 22. Are windows hard up to lintels? (Any infills or cover plates can be measured, once base coat render is complete)

  • 23. Has meter box flashing been installed with no weep holes?

  • 24. Has perimeter wall base been cleaned of mortar?

  • 25. Is brickwork notched around all penetrations?

  • 26. Has Garage/Porch/Alfresco/Water Tank/HWS slab been scraped and cleaned?

  • 27. Is Cavity and DPC clean and free of mortar dags?

  • 28. Has bricklayer hosed glass daily/no scratched glass - plastic wrap on windows?

  • Plastic should now be removed from glass, to ensure plastic is not 'baked' onto glass.

  • 29. Has bricklayer cleaned site daily and left broken bricks in two neat piles to front and/ or rear of property only?

  • 30. Has the meter box been installed plumb and to coursing and inside is free of mortar?

  • 31. (DS) Has the mid floor perimeter flashing been installed with weep holes?

  • 32. (DS) Is the balcony brickwork correct with last two courses core filled?

  • 33. Has / will the piers either side of the garage door finish flush with the plaster above the garage door?

  • 34. Are all temporary downpipes installed?

  • 35. Has the bricklayer installed foam in AJs in preparation to be caulked?

  • General Items

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.